145 Risks that cannot be identified or evaluated _____ .

A. should be deflected to the contracting officer.

B. should be handled via contingency allowances.

C. should be ignored, since they cannot be identified.

D. should be ignored, since they are not covered in the Risk Assessment.

E. C and D


参考答案

更多 “ 145 Risks that cannot be identified or evaluated _____ .A. should be deflected to the contracting officer.B. should be handled via contingency allowances.C. should be ignored, since they cannot be identified.D. should be ignored, since they are not covered in the Risk Assessment.E. C and D ” 相关考题
考题 The most common definition of project success is:A.Within timeB.Within time and costC.Within time, cost and technical performance requirementsD.Within time, cost, performance and accepted by the customer/userE.None of the above

考题 Value engineering/Analysis is the systematic use of techniques which does not include _____.A.establishing values for required functionsB.provide the required functions at the lowest overall cost.C.identifies the required function of an itemD.seeks to trade performance for costE.None of the above.

考题 35 Which of the following is considered a direct cost for producing a widget?A. The cost of the materials used to produce a widget.B. The labor costs of the workers who actually produced the widget.C. The rent for the building in which the widget was manufacturedD. The salary of senior management and the project sponsorE. A and B only

考题 最近你完成了一个公司餐厅设施的食品服务评估项目。你发现了很多问题,其中包括空售货机,粗鲁的员工,缓慢的饿队伍,贫乏的菜式,以及高价。你决定里利用帕雷托图来展示你的发。因为帕雷托图是一种出色的方法,可以用来( )A.通过对相同原因的归类,显示产生了多少结果B.在历史数据的基础上预测将来的结果C.显示哪一个变量对全部结果的影响最大D.显示不同的原因及附属原因是如何结合起来产生潜在的问题或者影响的

考题 有效的团队带来的主要结果是——( )A.项目绩效的改进B.有效的、运行平稳的团队C.项目队员理解项目经理对项目的绩效负最终责任D.项目干系人作为个人的队员做贡献的能力提高

考题 192 Using the figure in the Special window, The critical path is:A. A-B-GB. C-GC. C-DD. E-FE. A-B-G and C-D

考题 ● The scope statement providesA A basis for future decisions about a project.B A baseline to accomplish verification measures.C A baseline to evaluate potential scope changes.D All of the aboveE B and C only

考题 高风险项目通常会受到高层管理的关注以及最为细致的审查,高风险项目的项目经理最大的顾虑是高层管理常常会: ( )A.妨碍或干预项目管理B.规避或否认项目潜在的风险C.给与资源配置低优先权D.在要求额外资源时支持项目

考题 负责为新项目概念研究获得资金的人是 ( )A.项目经理B.总裁C.财务主管D.项目赞助人

考题 谁应该负责确保信息是清楚、明确和完整的?A、 项目经理B、 信息传递者C、 信息接收者D、 信息传递者和接收者