网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
In securing deck loads for an ocean tow,drill pipe should be().
A

galvanized to protect against corrosion

B

held in place with heavy materials such as spare pendant wire

C

limited to no more than five courses high

D

provided with bulwarks at both ends of their bays


参考答案

参考解析
解析: 暂无解析
更多 “单选题In securing deck loads for an ocean tow,drill pipe should be().A galvanized to protect against corrosionB held in place with heavy materials such as spare pendant wireC limited to no more than five courses highD provided with bulwarks at both ends of their bays” 相关考题
考题 A heavy,thick-walled tube,usually steel,used between the drill pipe and the bit in the drill stem to weight the bit in order to improve its performance is called a ______.A.heavy-walled drill pipeB.tool jointC.down hole toolD.drill collar

考题 A set of clamps that are latched onto the drill pipe to allow the driller to raise or lower the drill string out of or into the hole are the ______.A.liftsB.collarsC.elevatorsD.clamps

考题 Before leaving port on an ocean tow,a tug captain should assure himself of all the following EXCEPT ______.A.the towing hawser can be released quickly in an emergencyB.the correct navigation lights are rigged and operable on the tug and towC.an insurance underwriter has prepared a pre-sailing surveyD.a pick-up wire has been rigged on the tow in case of a breakaway.

考题 You intend to tow a barge with one tug and expect continuous high winds from the north.To reduce the yaw of your tow,you should ______.A.reduce the draft of the bargeB.shorten one leg of the bridleC.place bulky deck loads as far aft as possibleD.trim the barge down by the bow

考题 Deck beams perform ______ of the following functions in the hull structure of a vessel.① They transfer deck loads to the frames;② They help to maintain the shape of the hull.A.① onlyB.② onlyC.Both ① and ②D.Neither ① nor ②

考题 Limber is a term associated with ______.A.Emergency gearB.DrainageC.Deck cargo storageD.Securing gear

考题 A bridle for an ocean tow consists of ______.A.two chains of equal lengthB.a single nylon pendant rove through a heavy ring free to move on the pendantC.two long legs of wire rope shackled to a fishplateD.a single length of heavy chain with both ends secured on deck to welded pad eyes

考题 An ocean tow is sinking in deep water. Attempts to sever the towing hawser are unsuccessful Which action should now be taken?______.A.Abandon the towing vessel.B.Radio for emergency assistance.C.Slip the towline and allow it to run off the drum.D.Secure all watertight openings on the towing vessel.

考题 Cribbing is ______.A.wooden blocks or dunnage placed between a deck load and the deckB.the chains and shackles used to secure a deck cargoC.a crate in which a deck cargo is packagedD.cardboard separation pieces placed between deck loads to prevent chafing

考题 单选题Cargo handlers should take the following precautions with the exception of()to avoid damage from shifting.A Keep the loads as close to the rail or deck as possibleB If cargo is likely to settle,make provisions to secure it after it has settledC Thoroughly secure and shore all cargo so that it cannot moveD hen stowing cargo,avoid leaving empty paces

考题 单选题The opening in the deck that leads the anchor cable outside the hull is the().A hawsepipeB fall pipeC drop-pipeD spill pipe

考题 单选题An ocean tow is sinking in deep water. Attempts to sever the towing hawser are unsuccessful. Which action should now be taken? ()A Abandon the towing vesselB Radio for emergency assistanceC Slip the towline and allow it to run off the drumD Secure all watertight openings on the towing vessel

考题 单选题The main function of the drawworks on a ship is to().A transport tubulars from the pipe racks to the derrick floorB maintain constant tension on the marine riserC store and secure the excess drill lineD lower and hoist the drill string into and out of the drilled hole

考题 单选题Progressive flooding on a ship is controlled by securing watertight boundaries and().A transferring drill waterB dumping bulk materialsC pumping out flooded compartmentsD evacuating the unit

考题 单选题A bridle for an ocean tow consists of().A two chains of equal lengthB a single nylon pendant rove through a heavy ring free to move on the pendantC two long legs of wire rope shackled to a fishplateD a single length of heavy chain with both ends secured on deck to welded pad eyes

考题 单选题On a long ocean tow,the bridle should be made up of two equal lengths of().A chainB wireC nylonD manila

考题 单选题A heavy,thick-walled tube,usually steel,used between the drill pipe and the bit in the drill stem to weight the bit in order to improve its performance is called a().A heavy-walled drill pipeB tool jointC down hole toolD drill collar

考题 单选题The SOLAS convention prescribes that in the fire fighting drill the duty engineer should start the pump and supply deck water in() minute(s).A 5B 3C 2D 1

考题 单选题What is NOT suitable for use in making up the towing rig for a heavy,long ocean tow?()A ChainB RingC Solid thimbleD A fishplate

考题 单选题The deck loads on a ship are distributed through the deck beams to the().A framesB hullC stringersD plates

考题 单选题A set of clamps that are latched onto the drill pipe to allow the driller to raise or lower the drill string out of or into the hole are the().A liftsB collarsC elevatorsD clamps

考题 单选题What is a spill pipe?()A A drainage pipe that carries rain or spray from an upper deck to a lower deckB A pipe under the anchor windlass leading to the chain lockerC A chute,usually over the stern,to lead dumped garbage clear of the hullD An opening in the deck leading outside the hull

考题 单选题The shear rams of a ship blowout preventer stack are used in emergency well control to().A close and seal around the drill pipeB close and seal around casingC cut off pipe inside the preventer stackD close and seal around drill collars

考题 单选题Cribbing is().A wooden blocks or dunnage placed between a deck load and the deckB the chains and shackles used to secure a deck cargoC a crate in which a deck cargo is packagedD cardboard separation pieces placed between deck loads to prevent chafing

考题 单选题You intend to tow a barge with one tug and expect continuous high winds from the north. To reduce the yaw of your tow,you should().A reduce the draft of the bargeB shorten one leg of the bridleC place bulky deck loads as far aft as possibleD trim the barge down by the bow

考题 单选题To reduce stress on the towing hawser when towing astern (ocean tow),the hawser should be ().A secured to the aftermost fitting on the towing vesselB just touching the waterC underwaterD as short as possible

考题 单选题When using slings,cargo handlers should take all the following precautions except().A Ensure that slings are securely fastened around the loadB Avoid careless winch operations,especially when handling fragile cargoC Exercise care when using hooks,crowbars,and similar toolsD Keep the loads as close to the rail or deck as possible