网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
A set of clamps that are latched onto the drill pipe to allow the driller to raise or lower the drill string out of or into the hole are the().
A

lifts

B

collars

C

elevators

D

clamps


参考答案

参考解析
解析: 暂无解析
更多 “单选题A set of clamps that are latched onto the drill pipe to allow the driller to raise or lower the drill string out of or into the hole are the().A liftsB collarsC elevatorsD clamps” 相关考题
考题 Asystems architecture is a representation of a system in which there is amapping of(71)onto hardware and softwarecomponents, a mapping of the(72)onto thehardware architecture. and a concern for the human interaction with thesecomponents. That is, system architecture is concerned with a total system, includinghardware. software, and humans.Softwarearchitectural structures can be divided into three major categories, dependingon the broad nature of the elements they show.1)(73)embodydecisions as a set of code or data units that have to be constructed orprocured.2)(74)embody decisions as to how the systemis to be structured as set of elements that have runtime behavior. andinteractions.3)(75)embody decisions as to how thesystem will relate to nonsoftware structures in itsenvironment(suchas CPUs, file systems, networks, development teams, etc.).71.( )A.attributesB.constraintC.functionalityD.requirements

考题 A frame with two,or sometimes four,arms through which are threaded the guidelines and which is used to keep the drill stem and bit in line with the center opening in the temporary guide base is the ______.A.drill stem guideB.guide frameC.drill string frameD.casing guide

考题 A heavy,thick-walled tube,usually steel,used between the drill pipe and the bit in the drill stem to weight the bit in order to improve its performance is called a ______.A.heavy-walled drill pipeB.tool jointC.down hole toolD.drill collar

考题 A set of clamps that are latched onto the drill pipe to allow the driller to raise or lower the drill string out of or into the hole are the ______.A.liftsB.collarsC.elevatorsD.clamps

考题 The connected joints of pipe,usually made of three joints of pipe approximately 90 feet long,racked in the derrick when making a trip are called a ______.A.StringB.StandC.JointD.Standpipe

考题 As oil pipe line connections were broken, _____ quantity of oil was caused to spill onto the wharf and into the dock water.A.a not knowingB.an unknowingC.an unknownD.a not know

考题 引入管service pipe

考题 ()are usually stowed both above and below deck.A、ContainersB、TrucksC、MachineryD、Clamps

考题 RFC 3270 describes Differentiated Services (Diff-Serv) over Multi-Protocol Label Switching (MPLS)networks. Which model alters Differentiated Services (Diff-Serv) code points set in different DifferentiatedServices (Diff-Serv) domain?()A、Uniform modelB、Pipe ModelC、Short PipeD、None of the above will alter Differentiated Services(Diff-Serv)code points set in different DifferentiatedServices(Diff-Serv)domain

考题 下管pipe sinking

考题 ()(除了) the fire drill, there are also boat drill and emergency drill on board.A、ExceptB、AlthoughC、In addition toD、But

考题 drill()A、锉B、扳手C、钻D、凿子

考题 QOS管道模型有下列哪几种?()A、差分模型B、Uniform模型C、Pipe模型D、Short Pipe模型

考题 Using the Tivoli Dynamic Workload Console, what are two ways to  change the priority of a job?()A、 Open the "Set Priority" panel from the job properties.B、 Change the priority of the job stream that contains the job.C、 Select the corresponding action from the Monitor jobs task panel.D、 Open the job stream properties and drill down to the job priority  panel.E、 The priority of a job can only be changed from the Workload  Designer.

考题 单选题The main function of the drawworks on a ship is to().A transport tubulars from the pipe racks to the derrick floorB maintain constant tension on the marine riserC store and secure the excess drill lineD lower and hoist the drill string into and out of the drilled hole

考题 单选题In securing deck loads for an ocean tow,drill pipe should be().A galvanized to protect against corrosionB held in place with heavy materials such as spare pendant wireC limited to no more than five courses highD provided with bulwarks at both ends of their bays

考题 单选题The connected joints of pipe,usually made of three joints of pipe approximately 90 feet long,racked in the derrick when making a trip are called a().A stringB standC jointD standpipe

考题 单选题A heavy,thick-walled tube,usually steel,used between the drill pipe and the bit in the drill stem to weight the bit in order to improve its performance is called a().A heavy-walled drill pipeB tool jointC down hole toolD drill collar

考题 单选题When fire pumps are used for other than firefighting service,each pipe connecting the other service (except for branch lines used for deck washing) must have a().A check valve installed in the lineB shut off valve at a manifold near the pumpC quick disconnect union within ten feet of the pumpD regulator in the line set at 125 psi

考题 单选题As oil pipe line connections were broken,()quantity of oil was caused to spill onto the wharf and into the dock water.A a not knowingB an unknowingC an unknownD a not known

考题 单选题Which of the followings is not an indication of a bad maintenance?()A a pipe with welded connectionsB a pipe with several clipsC a cement boxD a leaking valve

考题 单选题In ship operations,hoisting and lowering pipe in and out of the drilled hole is the main function of the().A swivelB cathead spoolC drawworksD stand pipe

考题 单选题What is a spill pipe?()A A drainage pipe that carries rain or spray from an upper deck to a lower deckB A pipe under the anchor windlass leading to the chain lockerC A chute,usually over the stern,to lead dumped garbage clear of the hullD An opening in the deck leading outside the hull

考题 单选题The shear rams of a ship blowout preventer stack are used in emergency well control to().A close and seal around the drill pipeB close and seal around casingC cut off pipe inside the preventer stackD close and seal around drill collars

考题 单选题()(除了) the fire drill, there are also boat drill and emergency drill on board.A ExceptB AlthoughC In addition toD But

考题 单选题An integral part of a blowout preventer that serves as the closing element on an open hole,and whose ends do not fit around the drill pipe but seal against each other and shut off the space below completely is the().A shear ramB blind ramC pipe ramD annular ram

考题 单选题In order to prevent stress from being set up in the metal, expansion joints are fitted which _____ the stress by allowing the pipe to expand or contract freely.A reclaimB reconcileC rectifyD relieve