A heavy,thick-walled tube,usually steel,used between the drill pipe and the bit in the drill stem to weight the bit in order to improve its performance is called a ______.
A.heavy-walled drill pipe
B.tool joint
C.down hole tool
D.drill collar
参考答案
更多 “ A heavy,thick-walled tube,usually steel,used between the drill pipe and the bit in the drill stem to weight the bit in order to improve its performance is called a ______.A.heavy-walled drill pipeB.tool jointC.down hole toolD.drill collar ” 相关考题
考题
Which can be used for transferring a heavy patient between bed and trolley? ()
A. sliding sheetB. sliding boardC. banana boardD. sling
考题
A frame with two,or sometimes four,arms through which are threaded the guidelines and which is used to keep the drill stem and bit in line with the center opening in the temporary guide base is the ______.A.drill stem guideB.guide frameC.drill string frameD.casing guide
考题
A large valve,usually installed above the ram preventers,that forms a seal in the annular space between the pipe and wellbore or,if no pipe is present,on the wellbore itself is called the ______.A.annular blowout preventerB.annulusC.accumulatorD.automatic choke
考题
A set of clamps that are latched onto the drill pipe to allow the driller to raise or lower the drill string out of or into the hole are the ______.A.liftsB.collarsC.elevatorsD.clamps
考题
A heavy steel device that is set on the sea floor and used as a drilling template in offshore drilling operations is called a ______.A.temporary guide baseB.permanent guide baseC.guide frameD.foundation template
考题
The connected joints of pipe,usually made of three joints of pipe approximately 90 feet long,racked in the derrick when making a trip are called a ______.A.StringB.StandC.JointD.Standpipe
考题
The following tells us how to reuse the used water.Which is the right order of the passage A.to have the used water filtered
B.to put chemicals in it
C.to pipe it to the users
D.to pipe the used water to be purified to a factory
考题
重吊杆用于吊大的重件。()A、Heavy derrick is used for lifting large heavy cargo.B、Derrick is used for lifting large heavy cargo.C、Heavy derrick is used for lifting dry bulk cargo.D、Derrick is used for lifting dry bulk cargo.
考题
单选题A carling is used aboard ship().A
as a connecting strap between the butted ends of platingB
to stiffen areas under points of great stress between beamsC
to prevent the anchor from fouling when the brake is releasedD
to provide an extra heavy fitting in a heavy lift cargo rig
考题
单选题A viscosity regulator used for an engine is usually provided in order to () for an engine burning heavy fuel oil.A
regulate the fuel supplyB
maintain a constant fuel viscosity at the fuel valvesC
maintain efficient coolingD
alter the fuel density
考题
单选题The main function of the drawworks on a ship is to().A
transport tubulars from the pipe racks to the derrick floorB
maintain constant tension on the marine riserC
store and secure the excess drill lineD
lower and hoist the drill string into and out of the drilled hole
考题
单选题What is the role of route preference?()A
It is used to determine which route should become active.B
It is used to select which routing table to use for forwarding.C
It is used to determine what routes to accept into the routing table.D
It is used to select the best route between multiple equal cost paths.
考题
单选题In securing deck loads for an ocean tow,drill pipe should be().A
galvanized to protect against corrosionB
held in place with heavy materials such as spare pendant wireC
limited to no more than five courses highD
provided with bulwarks at both ends of their bays
考题
单选题A heavy steel device that is set on the sea floor and used as a drilling template in offshore drilling operations is called a().A
temporary guide baseB
permanent guide baseC
guide frameD
foundation template
考题
单选题A large valve,usually installed above the ram preventers,that forms a seal in the annular space between the pipe and wellbore or,if no pipe is present,on the wellbore itself is called the().A
annular blowout preventerB
annulusC
accumulatorD
automatic choke
考题
单选题The connected joints of pipe,usually made of three joints of pipe approximately 90 feet long,racked in the derrick when making a trip are called a().A
stringB
standC
jointD
standpipe
考题
单选题A heavy,thick-walled tube,usually steel,used between the drill pipe and the bit in the drill stem to weight the bit in order to improve its performance is called a().A
heavy-walled drill pipeB
tool jointC
down hole toolD
drill collar
考题
单选题() are two vertical supports,usually steel,one each side of the centerline of the ship used to support booms.A
ShroudsB
King postsC
StaysD
Turnbuckles
考题
单选题A frame with two,or sometimes four,arms through which are threaded the guidelines and which is used to keep the drill stem and bit in line with the center opening in the temporary guide base is the().A
drill stem guideB
guide frameC
drill string frameD
casing guide
考题
单选题A fid is a().A
mallet used when splicing wire ropeB
sharp pointed crow bar used to unlay wire ropeC
tapered steel pin used to separate wire ropeD
tapered wooden pin used when splicing heavy rope
考题
单选题A set of clamps that are latched onto the drill pipe to allow the driller to raise or lower the drill string out of or into the hole are the().A
liftsB
collarsC
elevatorsD
clamps
考题
单选题What is the role of route preference?()A
It is used as a tiebreaker when the same prefix is available through multiple protocols.B
It is used to determine the preferred path to a given destination.C
It is used to select the best route between multiple equal-cost paths.D
It is used to select which routing table to use for forwarding.
考题
单选题After more than one hundred years of steel production at Hallside, ______.A
the land could not be used for anything.B
it was impossible to use the land to build on.C
the land could then be built on.D
the land could be used for any purpose.
考题
单选题Fuel injectors used in heavy fuel oil systems are usually provided with cooling to reduce().A
cold corrosion of the nozzlesB
fuel viscosity for better atomizationC
carbon accumulation on the nozzlesD
fuel detonation in the cylinders
考题
单选题The shear rams of a ship blowout preventer stack are used in emergency well control to().A
close and seal around the drill pipeB
close and seal around casingC
cut off pipe inside the preventer stackD
close and seal around drill collars
考题
单选题A carling is used aboard ship().A
as a connecting strap between the butted ends of platingB
to stiffen areas under points of great stress between beamsC
to prevent the anchor from fouling when the brake is releasedD
to provide an extra heavy fitting in a lift cargo released