网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

A heavy,thick-walled tube,usually steel,used between the drill pipe and the bit in the drill stem to weight the bit in order to improve its performance is called a ______.

A.heavy-walled drill pipe

B.tool joint

C.down hole tool

D.drill collar


参考答案

更多 “ A heavy,thick-walled tube,usually steel,used between the drill pipe and the bit in the drill stem to weight the bit in order to improve its performance is called a ______.A.heavy-walled drill pipeB.tool jointC.down hole toolD.drill collar ” 相关考题
考题 Which can be used for transferring a heavy patient between bed and trolley? () A. sliding sheetB. sliding boardC. banana boardD. sling

考题 A frame with two,or sometimes four,arms through which are threaded the guidelines and which is used to keep the drill stem and bit in line with the center opening in the temporary guide base is the ______.A.drill stem guideB.guide frameC.drill string frameD.casing guide

考题 A large valve,usually installed above the ram preventers,that forms a seal in the annular space between the pipe and wellbore or,if no pipe is present,on the wellbore itself is called the ______.A.annular blowout preventerB.annulusC.accumulatorD.automatic choke

考题 A set of clamps that are latched onto the drill pipe to allow the driller to raise or lower the drill string out of or into the hole are the ______.A.liftsB.collarsC.elevatorsD.clamps

考题 A heavy steel device that is set on the sea floor and used as a drilling template in offshore drilling operations is called a ______.A.temporary guide baseB.permanent guide baseC.guide frameD.foundation template

考题 The connected joints of pipe,usually made of three joints of pipe approximately 90 feet long,racked in the derrick when making a trip are called a ______.A.StringB.StandC.JointD.Standpipe

考题 The following tells us how to reuse the used water.Which is the right order of the passage A.to have the used water filtered B.to put chemicals in it C.to pipe it to the users D.to pipe the used water to be purified to a factory

考题 测深管()A、sounding pipeB、steel pipeC、plastic pipeD、wooden pipe

考题 重吊杆用于吊大的重件。()A、Heavy derrick is used for lifting large heavy cargo.B、Derrick is used for lifting large heavy cargo.C、Heavy derrick is used for lifting dry bulk cargo.D、Derrick is used for lifting dry bulk cargo.

考题 单选题A carling is used aboard ship().A as a connecting strap between the butted ends of platingB to stiffen areas under points of great stress between beamsC to prevent the anchor from fouling when the brake is releasedD to provide an extra heavy fitting in a heavy lift cargo rig

考题 单选题A viscosity regulator used for an engine is usually provided in order to () for an engine burning heavy fuel oil.A regulate the fuel supplyB maintain a constant fuel viscosity at the fuel valvesC maintain efficient coolingD alter the fuel density

考题 单选题The main function of the drawworks on a ship is to().A transport tubulars from the pipe racks to the derrick floorB maintain constant tension on the marine riserC store and secure the excess drill lineD lower and hoist the drill string into and out of the drilled hole

考题 单选题What is the role of route preference?()A It is used to determine which route should become active.B It is used to select which routing table to use for forwarding.C It is used to determine what routes to accept into the routing table.D It is used to select the best route between multiple equal cost paths.

考题 单选题In securing deck loads for an ocean tow,drill pipe should be().A galvanized to protect against corrosionB held in place with heavy materials such as spare pendant wireC limited to no more than five courses highD provided with bulwarks at both ends of their bays

考题 单选题A heavy steel device that is set on the sea floor and used as a drilling template in offshore drilling operations is called a().A temporary guide baseB permanent guide baseC guide frameD foundation template

考题 单选题A large valve,usually installed above the ram preventers,that forms a seal in the annular space between the pipe and wellbore or,if no pipe is present,on the wellbore itself is called the().A annular blowout preventerB annulusC accumulatorD automatic choke

考题 单选题The connected joints of pipe,usually made of three joints of pipe approximately 90 feet long,racked in the derrick when making a trip are called a().A stringB standC jointD standpipe

考题 单选题A heavy,thick-walled tube,usually steel,used between the drill pipe and the bit in the drill stem to weight the bit in order to improve its performance is called a().A heavy-walled drill pipeB tool jointC down hole toolD drill collar

考题 单选题() are two vertical supports,usually steel,one each side of the centerline of the ship used to support booms.A ShroudsB King postsC StaysD Turnbuckles

考题 单选题A frame with two,or sometimes four,arms through which are threaded the guidelines and which is used to keep the drill stem and bit in line with the center opening in the temporary guide base is the().A drill stem guideB guide frameC drill string frameD casing guide

考题 单选题A fid is a().A mallet used when splicing wire ropeB sharp pointed crow bar used to unlay wire ropeC tapered steel pin used to separate wire ropeD tapered wooden pin used when splicing heavy rope

考题 单选题A set of clamps that are latched onto the drill pipe to allow the driller to raise or lower the drill string out of or into the hole are the().A liftsB collarsC elevatorsD clamps

考题 单选题What is the role of route preference?()A It is used as a tiebreaker when the same prefix is available through multiple protocols.B It is used to determine the preferred path to a given destination.C It is used to select the best route between multiple equal-cost paths.D It is used to select which routing table to use for forwarding.

考题 单选题After more than one hundred years of steel production at Hallside, ______.A the land could not be used for anything.B it was impossible to use the land to build on.C the land could then be built on.D the land could be used for any purpose.

考题 单选题Fuel injectors used in heavy fuel oil systems are usually provided with cooling to reduce().A cold corrosion of the nozzlesB fuel viscosity for better atomizationC carbon accumulation on the nozzlesD fuel detonation in the cylinders

考题 单选题The shear rams of a ship blowout preventer stack are used in emergency well control to().A close and seal around the drill pipeB close and seal around casingC cut off pipe inside the preventer stackD close and seal around drill collars

考题 单选题A carling is used aboard ship().A as a connecting strap between the butted ends of platingB to stiffen areas under points of great stress between beamsC to prevent the anchor from fouling when the brake is releasedD to provide an extra heavy fitting in a lift cargo released