To reduce stress on the towing hawser when towing astern (ocean tow),the hawser should be ().
A
secured to the aftermost fitting on the towing vessel
B
just touching the water
C
underwater
D
as short as possible
参考答案
参考解析
解析:
暂无解析
更多 “单选题To reduce stress on the towing hawser when towing astern (ocean tow),the hawser should be ().A secured to the aftermost fitting on the towing vesselB just touching the waterC underwaterD as short as possible” 相关考题
考题
A tug is "in irons" when held in a fixed position by ______.A.the weight of its tow,its being anchored,or groundedB.the weight of its towing hawser on the bottomC.an adverse currentD.lack of power or an engine breakdown
考题
A tug is best positioned for towing and maneuvering on rivers and other restricted waters where wave action is limited when ______.A.directly astern and pushing the towB.towing on a hawserC.towing alongside and parallel to the vessel it is towingD.towing on the hip
考题
A vessel towing a barge astern would show,at the stern ______.A.only a stern lightB.a towing light above the stern lightC.two towing lights in a vertical lineD.two white lights in a vertical line
考题
A vessel towing astern in an operation which severely restricts the towing vessel and her tow in their ability to change course shall,when making way,exhibit ______.A.the masthead lights for a towing vesselB.the lights for a vessel restricted in its ability to maneuverC.sidelights,stern light and towing lightD.All of the above
考题
An intermediate spring is ______.A.fitted in each leg of the towing bridleB.generally located between the “fishplate” and the main towing hawserC.secured at the “H” bittsD.usually made of manila hawser
考题
An ocean tow is sinking in deep water. Attempts to sever the towing hawser are unsuccessful Which action should now be taken?______.A.Abandon the towing vessel.B.Radio for emergency assistance.C.Slip the towline and allow it to run off the drum.D.Secure all watertight openings on the towing vessel.
考题
单选题When towing astern,increased catenary will().A
increase control of the towB
prevent the towing vessel from going in ironsC
make the towing vessel less maneuverableD
reduce shock stress on the towing hawser
考题
单选题When towing,what is the main reason for using a chain bridle on a wire hawser().A
It makes for an easy connectionB
It gives a spring effect to cushion the shockC
It eliminates the necessity of a swivelD
It does not chafe
考题
单选题An ocean tow is sinking in deep water. Attempts to sever the towing hawser are unsuccessful. Which action should now be taken? ()A
Abandon the towing vesselB
Radio for emergency assistanceC
Slip the towline and allow it to run off the drumD
Secure all watertight openings on the towing vessel
考题
单选题You see a vessel carrying a black diamond which indicates a().A
vessel towing asternB
barge pushed aheadC
vessel towing astern only when the length of her tow exceeds 200 metersD
this signal does not exist in international waters
考题
单选题A vessel towing astern in an operation which severely restricts the towing vessel and her tow in their ability to change course shall,when making way,exhibit().A
the masthead lights for a towing vesselB
the lights for a vessel restricted in its ability to maneuverC
sidelights,stern light and towing lightD
All of the above
考题
单选题A vessel towing a barge astern would show,at the stern().A
only a stern lightB
a towing light above the stern lightC
two towing lights in a vertical lineD
two white lights in a vertical line
考题
单选题In astern towing,a tow span,also called the tow bar or towing arch,is used to().A
insure that the hawser leads directly aft as it passes over the stern of the towing vesselB
increase the stability of the towing vessel by raising the hawser off the deckC
reduce chafing of the towing hawserD
prevent fouling of the hawser on deck gear located on the stern of the towing vessel
考题
单选题The catenary().A
acts as a reserve length of towing hawser when the tug applies more power,and it dampens the surge effect of the towB
gives an approximation of the amount of strain on the towing hawserC
is the dip in the towing hawser between the tug and the towD
All of the above
考题
单选题The MINIMUM acceptable size for a towing bridle would be that size in which the safe working load (SWL) of each leg of the bridle is equal to().A
one-half the SWL of the main towing hawserB
three-fourths the SWL of the main towing hawserC
that of the main towing hawserD
twice that of the main towing hawser
考题
单选题Which statement is TRUE concerning hawser towing? ()A
The catenary in a hawser should be sufficient so that the hawser just touches the bottomB
The hawser is of sufficient length for towing when taut between tug and towC
Increasing speed usually increases the catenary in the hawserD
Shortening the tow hawser generally decreases the maneuverability of the tug
考题
单选题A towing vessel is tripped when().A
it is overtaken by the towB
it is pulled sideways by the towC
the weight of the towing hawser causes loss of maneuverabilityD
the propeller is fouled by the towing hawser
考题
单选题A towing vessel becomes tripped while towing on a hawser astern. What factor is MOST important when assessing the risk of capsizing? ()A
Length of the towlineB
Height of the towline connectionC
Longitudinal position of the towline connectionD
Direction of opposing force
考题
单选题Good seamanship while towing in heavy weather requires all of the following EXCEPT().A
reducing speed to reduce surging on the towlineB
lashing down or stowing all loose gearC
dogging all hatches and watertight doorsD
streaming all of your towing hawser
考题
单选题When towing astern,one way to reduce yawing of the tow is to().A
trim the tow by the sternB
trim the tow by the headC
have the tow on an even keelD
list the tow on the side it is yawing
考题
单选题What does the term end-for-end refer to in regard to a wire towing hawser().A
Cutting off the bitter and towing ends of the wire ropeB
Splicing two wire ropes togetherC
Removing the wire rope from the drum and reversing it so that the towing end becomes the bitter endD
Removing the wire rope from the drum and turning it over so that the wire bends in the opposite direction when rolled on a drum
考题
单选题A vessel towing astern in an operation which severely restricts the towing vessel and her tow in their ability to change course shall,when making way,exhibit().A
the masthead lights for a towing vesselB
the lights for a vessel restricted in its ability to maneuverC
sidelights,sternlight and towing lightD
All of the above
考题
单选题When towing astern what equipment should be stowed ready for use near the towline?()A
First aid kitB
Axe or cutting torchC
Fire extinguisherD
Chafing gear
考题
单选题A power-driven vessel,when towing astern,shall show().A
two towing lights in a vertical lineB
a towing light in a vertical line above the sternlightC
two towing lights in addition to the sternlightD
a small white light in lieu of the sternlight
考题
单选题An intermediate spring is().A
fitted in each leg of the towing bridleB
generally located between the fishplate and the main towing hawserC
secured at the H bittsD
usually made of manila hawser
考题
单选题As seen from the tow,what should connect the leading ends of both towing bridle legs to the main towing hawser?()A
A cable clampB
A fishplate,flounder,or towing plateC
A pad eyeD
The towing bitts
考题
单选题Which statement concerning an automatic towing engine is FALSE? ()A
It automatically maintains tow line tensionB
It prolongs the life of the hawser by distributing chafing as the hawser is paid out and taken inC
As tension on the hawser increases,more line is taken in by the automatic towing engineD
As tension on the hawser decreases,more line is taken in by the automatic towing engine
热门标签
最新试卷