During loading and discharging, the equipment works with all kinds of cargo sling, net, wire, tray, plate clamp, etc.()

  • A、在装卸货期间,这些设备配有各种吊货索环、吊货网、吊货钢丝、吊货托盘、吊板夹等。
  • B、在装卸货期间,这些设备配有各种吊货托盘、吊板夹、吊货网、吊货钢丝、吊货盘等。
  • C、在装卸货期间,这些设备配有各种吊货辅助设备等一起使用。
  • D、在卸货期间,这些设备配有各种吊货索环、吊货网、吊货钢丝、吊货托盘、吊板夹等。

参考答案

更多 “During loading and discharging, the equipment works with all kinds of cargo sling, net, wire, tray, plate clamp, etc.()A、在装卸货期间,这些设备配有各种吊货索环、吊货网、吊货钢丝、吊货托盘、吊板夹等。B、在装卸货期间,这些设备配有各种吊货托盘、吊板夹、吊货网、吊货钢丝、吊货盘等。C、在装卸货期间,这些设备配有各种吊货辅助设备等一起使用。D、在卸货期间,这些设备配有各种吊货索环、吊货网、吊货钢丝、吊货托盘、吊板夹等。” 相关考题
考题 Who usually adjust the derricks during the loading and discharging?

考题 Ships’ masters are requested to ensure that during their call at this port,all discharging outlets are blocked .A.blockadedB.openedC.closedD.enclosed

考题 The term under which the Shipowner is not responsible for loading and discharging,stowage and trimming costs is ________ .A.FOBSTB.FIOSTC.FIOSD.FIO

考题 That THE CARGO SHALL BE LOADED AND DISCHARGED WITHIN THE NUMBER OF TOTAL RUNNING HOURS AS INDICATED,WEATHER PERMITTING,SUNDAYS AND HOLIDAYS EXCEPTED,UNLESS USED,IN WHICH EVENT TIME ACTUALLY USED SHALL COUNT is referred to as ______.A.separate laytime for loading and dischargingB.total laytime for loading and dischargingC.commencement of laytimeD.laytime commencement of loading and discharging

考题 While discharging a tanker,list can be controlled by ______.A.Shoreside personnelB.Using a center tank near the bow,discharging as necessaryC.Using wing tanks near the longitudinal center,discharging as necessaryD.Using the after peak tank,loading as necessary

考题 During loading or discharging,the tallymen must make contact with______on duty so as to solve problems in time.A.ship ownerB.ship’s officersC.ConsignorsD.shippers

考题 The ship needs loading and discharging.()A、船舶需要装货B、船舶需要卸货C、船舶需要装卸货D、船舶需要靠港

考题 船舶需要装卸货。()A、The ship needs loading.B、The ship needs discharging.C、The ship needs unloading.D、The ship needs loading and discharging.

考题 现在天晴了。我们开始装货吧。()A、It’s raining! Let’s stop discharging .B、It’s clear up! Let’s start discharging .C、It’s clear up! Let’s start loading .D、It’s raining! Let’s stop loading .

考题 翻译:shore tallyman to be employed by the vessel at the expenses to the vessel ,both at loading and discharging port

考题 翻译:any lightrage at loading and discharging port to be at charterers’ risk and expenses and time used to count as laytime

考题 翻译:Time lost waiting for berth to count as loading/discharging time

考题 单选题During loading and discharging operations,in addition to when the cargo tanks have been properly filled,each inert gas system must be capable of maintaining a minimum gas pressure of().A 150 millimeters of water pressureB 125 millimeters of water pressureC 100 millimeters of water pressureD 75 millimeters of water pressure

考题 单选题A sum of money paid by the Shipowner to Charterer for completing loading or discharging a cargo in less time than that stipulated in Charter Party as laydays.It is().A extra expensesB dispatch moneyC demurrageD remuneration

考题 单选题When planning the loading or discharging of a VLCC (100,000 DWT+) what is the most important consideration?()A Draft and trimB Limits of the bending momentsC Rate of dischargingD Rate of loading

考题 单选题The ship will be responsible for the cargo loaded or unloaded().A only when the cargo is within its railB during the time when loading or ynloading is going onC after the cargo is checked by tallymenD as soon as loading or discharging begins

考题 单选题During loading or discharging,where the delay is due to the Shipowner’s fault,or that of his servants or agents acting within their authority,the time actually delayed is to be()in calculating lay days.A precludedB includedC excludedD diluted

考题 单选题If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.A in the loading placeB in the port or dockC in the loading spotD in the discharging spot

考题 单选题装卸货之前,打开舱盖。()A After loading and discharging, hatch covers will be opened.B After loading and discharging, hatch covers will be closed.C Before loading and discharging, hatch covers will be opened.D Before loading and discharging, hatch covers will be closed.

考题 问答题翻译:any lightrage at loading and discharging port to be at charterers’ risk and expenses and time used to count as laytime

考题 单选题During loading or discharging, the tallymen must make contact with()on duty so as to solve problems in time.A ship ownerB ship's officersC shippersD consignors

考题 问答题翻译:shore tallyman to be employed by the vessel at the expenses to the vessel ,both at loading and discharging port

考题 问答题翻译:Time lost waiting for berth to count as loading/discharging time

考题 单选题现在天晴了。我们开始装货吧。()A It’s raining! Let’s stop discharging .B It’s clear up! Let’s start discharging .C It’s clear up! Let’s start loading .D It’s raining! Let’s stop loading .

考题 单选题Please tell your tallymen to()out the marks in the holds during discharging.A pickB chooseC sortD decide

考题 单选题船舶需要装卸货。()A The ship needs loading.B The ship needs discharging.C The ship needs unloading.D The ship needs loading and discharging.

考题 单选题()in a charter-party are working days on which the weather allows loading work or discharging work to be done.A Whether working daysB Weather working daysC Running daysD Calendar days

考题 单选题When loading or discharging dry mud or cement,crew members should use goggles and().A facial respirator maskB ear plugsC rubberized bootsD fireman's outfit