网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
During loading and discharging, the equipment works with all kinds of cargo sling, net, wire, tray, plate clamp, etc.()
- A、在装卸货期间,这些设备配有各种吊货索环、吊货网、吊货钢丝、吊货托盘、吊板夹等。
- B、在装卸货期间,这些设备配有各种吊货托盘、吊板夹、吊货网、吊货钢丝、吊货盘等。
- C、在装卸货期间,这些设备配有各种吊货辅助设备等一起使用。
- D、在卸货期间,这些设备配有各种吊货索环、吊货网、吊货钢丝、吊货托盘、吊板夹等。
参考答案
更多 “During loading and discharging, the equipment works with all kinds of cargo sling, net, wire, tray, plate clamp, etc.()A、在装卸货期间,这些设备配有各种吊货索环、吊货网、吊货钢丝、吊货托盘、吊板夹等。B、在装卸货期间,这些设备配有各种吊货托盘、吊板夹、吊货网、吊货钢丝、吊货盘等。C、在装卸货期间,这些设备配有各种吊货辅助设备等一起使用。D、在卸货期间,这些设备配有各种吊货索环、吊货网、吊货钢丝、吊货托盘、吊板夹等。” 相关考题
考题
Ships’ masters are requested to ensure that during their call at this port,all discharging outlets are blocked .A.blockadedB.openedC.closedD.enclosed
考题
The term under which the Shipowner is not responsible for loading and discharging,stowage and trimming costs is ________ .A.FOBSTB.FIOSTC.FIOSD.FIO
考题
That THE CARGO SHALL BE LOADED AND DISCHARGED WITHIN THE NUMBER OF TOTAL RUNNING HOURS AS INDICATED,WEATHER PERMITTING,SUNDAYS AND HOLIDAYS EXCEPTED,UNLESS USED,IN WHICH EVENT TIME ACTUALLY USED SHALL COUNT is referred to as ______.A.separate laytime for loading and dischargingB.total laytime for loading and dischargingC.commencement of laytimeD.laytime commencement of loading and discharging
考题
While discharging a tanker,list can be controlled by ______.A.Shoreside personnelB.Using a center tank near the bow,discharging as necessaryC.Using wing tanks near the longitudinal center,discharging as necessaryD.Using the after peak tank,loading as necessary
考题
During loading or discharging,the tallymen must make contact with______on duty so as to solve problems in time.A.ship ownerB.ship’s officersC.ConsignorsD.shippers
考题
船舶需要装卸货。()A、The ship needs loading.B、The ship needs discharging.C、The ship needs unloading.D、The ship needs loading and discharging.
考题
现在天晴了。我们开始装货吧。()A、It’s raining! Let’s stop discharging .B、It’s clear up! Let’s start discharging .C、It’s clear up! Let’s start loading .D、It’s raining! Let’s stop loading .
考题
翻译:shore tallyman to be employed by the vessel at the expenses to the vessel ,both at loading and discharging port
考题
翻译:any lightrage at loading and discharging port to be at charterers’ risk and expenses and time used to count as laytime
考题
单选题During loading and discharging operations,in addition to when the cargo tanks have been properly filled,each inert gas system must be capable of maintaining a minimum gas pressure of().A
150 millimeters of water pressureB
125 millimeters of water pressureC
100 millimeters of water pressureD
75 millimeters of water pressure
考题
单选题A sum of money paid by the Shipowner to Charterer for completing loading or discharging a cargo in less time than that stipulated in Charter Party as laydays.It is().A
extra expensesB
dispatch moneyC
demurrageD
remuneration
考题
单选题When planning the loading or discharging of a VLCC (100,000 DWT+) what is the most important consideration?()A
Draft and trimB
Limits of the bending momentsC
Rate of dischargingD
Rate of loading
考题
单选题The ship will be responsible for the cargo loaded or unloaded().A
only when the cargo is within its railB
during the time when loading or ynloading is going onC
after the cargo is checked by tallymenD
as soon as loading or discharging begins
考题
单选题During loading or discharging,where the delay is due to the Shipowner’s fault,or that of his servants or agents acting within their authority,the time actually delayed is to be()in calculating lay days.A
precludedB
includedC
excludedD
diluted
考题
单选题If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.A
in the loading placeB
in the port or dockC
in the loading spotD
in the discharging spot
考题
单选题装卸货之前,打开舱盖。()A
After loading and discharging, hatch covers will be opened.B
After loading and discharging, hatch covers will be closed.C
Before loading and discharging, hatch covers will be opened.D
Before loading and discharging, hatch covers will be closed.
考题
问答题翻译:any lightrage at loading and discharging port to be at charterers’ risk and expenses and time used to count as laytime
考题
单选题During loading or discharging, the tallymen must make contact with()on duty so as to solve problems in time.A
ship ownerB
ship's officersC
shippersD
consignors
考题
问答题翻译:shore tallyman to be employed by the vessel at the expenses to the vessel ,both at loading and discharging port
考题
单选题现在天晴了。我们开始装货吧。()A
It’s raining! Let’s stop discharging .B
It’s clear up! Let’s start discharging .C
It’s clear up! Let’s start loading .D
It’s raining! Let’s stop loading .
考题
单选题Please tell your tallymen to()out the marks in the holds during discharging.A
pickB
chooseC
sortD
decide
考题
单选题船舶需要装卸货。()A
The ship needs loading.B
The ship needs discharging.C
The ship needs unloading.D
The ship needs loading and discharging.
考题
单选题()in a charter-party are working days on which the weather allows loading work or discharging work to be done.A
Whether working daysB
Weather working daysC
Running daysD
Calendar days
考题
单选题When loading or discharging dry mud or cement,crew members should use goggles and().A
facial respirator maskB
ear plugsC
rubberized bootsD
fireman's outfit
热门标签
最新试卷