网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

A customer is deploying a new database on a PS701 Blade in a BladeCenter H, and requires redundant network and SAN adapters. Which configuration supports the customer requirement?()

  • A、Configure 2CFFh combination fibre channel / gigabit Ethernet adapters
  • B、Configure 1CFFh 2-port fibre channel adapter and 1 CIOv 2-port gigabit Ethernet adapter
  • C、Configure 1CIOv 2-port fibre channel adapter and 1 CFFh combination fibre channel / gigabit Ethernet  adapter
  • D、Configure 1CIOv 2-port gigabit Ethernet adapter and 1 CFFh combination fibre channel / gigabit Ethernet  adapter

参考答案

更多 “A customer is deploying a new database on a PS701 Blade in a BladeCenter H, and requires redundant network and SAN adapters. Which configuration supports the customer requirement?()A、Configure 2CFFh combination fibre channel / gigabit Ethernet adaptersB、Configure 1CFFh 2-port fibre channel adapter and 1 CIOv 2-port gigabit Ethernet adapterC、Configure 1CIOv 2-port fibre channel adapter and 1 CFFh combination fibre channel / gigabit Ethernet adapterD、Configure 1CIOv 2-port gigabit Ethernet adapter and 1 CFFh combination fibre channel / gigabit Ethernet adapter” 相关考题
考题 A manufacturing customer has an IBM BladeCenter H chassis with four, HX5 with MAX5 4-socket blades installed. Each blade has the optional Fibre Channel Expansion card. The customer wants redundancy and is going to install the following configuration:  (1)two Brocade 20-Port SAN Switch Modules  (2)two Nortel Networks 1/10 GB Uplink ESM  (3)a redundant AMM  What is the minimum number of power supplies needed for this configuration to have full redundancy?()A、4B、3C、2D、8

考题 A customer uses an IBM xSeries x366 for their network server.They experienced downtime when the NIC failed earlier this year.Their Novell 6.5 server needs to be accessible all the time at the highest speed possible.Slots are available where network adapters can still be added.  High availability is the primary requirement, but increased network bandwidth on the server is also required. Which of the following is the most cost-effective solution to satisfy all of the customer’s requirements?()A、Upgrade the network switches to 10Gb speed.B、Install a dual port gigabit Ethernet adapter and configure adapter load balancing teaming with the onboard adapters.C、Install one extra adapter to team with the internal adapter and configure adapter failover.D、Install two additional NICs and configure adapter load balancing teaming with the onboard adapters.

考题 A customer needs a new 4-way p630 with three partitions to support three AIX 5.2 applications.  Each partition requires two of the following:  OS boot drives, fiber adapters, and gigabit Ethernet adapters.  The customer has an HMC with an available serial port.  In addition to the model 6C4, which of the following is required to meet the customer’s requirements?()A、One 7311-D20 drawerB、Two 7311-D20 drawersC、Two 7311-D10 drawersD、One 7311-D10 drawers

考题 A customer is planning to implement a new x445 in their datacenter.Which TWO of the following should the customer prepare prior to the implementation to ensure a trouble free installation?()A、Install the exhaust fan on top of the IBM NetBAY 42 Enterprise rack for extra coolingB、Ensure a 260V power source for the x445 and BladeCenter is available for fully redundant powerC、Ensure a 220v power source for the x445 is available for fully redundant powerD、Install the new 10GBit Ethernet network to take advantage of the new network switch in the x445.E、Have their Network Operation Staff review and assist connecting the new server to their existing network.

考题 A customer wants to boot from SAN with their IBM BladeCenter infrastructure.  What is required for the customer to be able to perform this? ()A、4GB Modular Flash Drive for each Blade Server and Dual 15.8GB 2.5 Solid State Drive for each Blade Server B、Cisco Intelligent Gb Ethernet Switch Module and IBM BladeCenter Copper Pass-thru Module C、Fibre Channel Expansion Card for each Blade Server and Fibre Channel SAN Switch Module D、Cisco Intelligent Gb Ethernet Switch Module and Dual 15.8GB 2.5 Solid State Drive for each Blade Server

考题 Your customer has converted from traditional servers to BladeCenter technology and has a requirement for an RSA adapter on a new BladeCenter server.  Which of the following options would you use? ()A、Remote Supervisor Adapter II (RSA II Slimline)B、Management Module, which comes standard on the BladeCenterC、Acoustic Attenuation ModuleD、Ethernet NICs

考题 A customer recently purchased an HS22 Blade to install into their existing BCH chassis. The customer installed the blade and it was not recognized. Which ofthe following is the first question for this customer?()A、Did you add the redundant AMM?B、What is the processor wattage?C、Is the AMM firmware up to date?D、Is the HS22V memory configuration optimized?

考题 A customer has a requirement to eliminate single points of failure for an application.  They have allocated one Ethernet adapter to each VIO server on the system. Which features of PowerVM and AIX will support the customer requirement?()A、Etherchannel and trunkingB、Network Interface Backup and EtherchannelC、Shared Ethernet Adapter (SEA) Failover and EtherchannelD、Network Interface Backup and Shared Ethernet Adapter failover

考题 A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the full fabric internal fibre switches. Consequently, the customer is considering an N_Port ID Virtualization (NPIV) capable switch. Which of the following should be mentioned to the customer regarding the NPIV switch?()A、Youcan not use an NPIV switch in the same IBM BladeCenter chassis as a Cisco Intelligent Ethernet SwitchB、Using blade servers with the NPIV switch will require morefibre ports on the external fibre switchC、Storage devices likeFibre Channel Tape and Disk cannot be attached to the NPIV Switch but must connect to a core fabric switch.D、The NPIV switch will count against the number of domains in a fabric

考题 A BladeCenter H customer is asking for concurrent Keyboard/Video/Mouse. Select the items required to accomplish this. ()A、Advanced Management Module and cKVM Daughter CardB、HS21, LS21 or JS22 Blade Server and iSCSI Expansion CardC、Redundant Fibre Channel Switch Module and cKVM Daughter CardD、Advanced Management Module and iSCSI Expansion Card

考题 A customer wants to boot from an iSCSI SAN with their IBM BladeCenter infrastructure running Microsoft Windows Server 2000.  What is required for the customer to be able to perform this?()A、Fibre Channel Expansion Card for each Blade ServerB、cKVM Card for each Blade ServerC、iSCSI Expansion Card for each Blade ServerD、4Gb Modular Flash Drive

考题 A customer has a requirement for a single AIX LPAR to be highly available. The customer only has enough funding to purchase a single system. Which would be the most critical option to mitigate AIX availability?()A、Dual power supplies.B、Twice the amount of disk.C、Two dual-port LHEA adapters.D、Two dual-port fibre channel adapters.

考题 A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the full fabric internal fibre switches. Consequently, the customer is considering an N_Port ID Virtualization (NPIV) capable switch.Which of the following should be mentioned to the customer regarding the NPIV switch?()A、You can not use an NPIV switch in the same IBM BladeCenter chassis as a Cisco Intelligent Ethernet Switch B、Using blade servers with the NPIV switch will require more fibre ports on the external fibre switch C、Storage devices like Fibre Channel Tape and Disk cannot be attached to the NPIV Switch but must connect to a core fabric switchD、The NPIV switch will count against the number of domains in a fabric

考题 A banking customer has the following requirements for an IBM BladeCenter solution with high speed fibre channel: (1)four 4-socket Microsoft SQL servers with two hot swap SAS drives  (2)two physical Microsoft Active Directory Servers  (3)twenty-two physical Citrix servers  (4)three physical Web servers (5)one physical vCenter server   (6)eight vSphere hosts  Which configuration minimally satisfies these requirements?()A、Three IBMBladeCenter S chassis, three Brocade Fibre modules, six Ethernet modulesB、Three IBMBladeCenter E chassis, three Brocade Fibre modules, six Ethernet modulesC、Four IBMBladeCenter H chassis, four QLogic Fibre Channel modules, eight Ethernet modulesD、Three IBMBladeCenter H chassis, three QLogic Fibre Channel modules, six Ethernet modules

考题 A customer has the following equipment installed in their data center:  (1)an IBM BladeCenter H chassis (2)two power supplies  (3)six HS22V blades (4)three Nortel 1/10 GB ESMs The retail customer purchased a new HX5 with MAX5.  Which of the following must be added to install the HX5 with MAX5?()A、Two additional power suppliesB、Fibre Channel (FC) switches and SAN storageC、A Nortel 1/10 GB ESMD、SSD for the HX5

考题 A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the internal fibre switches. Consequently. the customer wants to use the Optical Pass-Thru Module (OPM).  What TRUE statement should be mentioned to the customer regarding the OPM?()A、You can not put the Optical Pass-Thru Module in the same IBM BladeCenter chassis as a Cisco Intelligent Ethernet Switch.B、Using blade servers with the Optical Pass-Thru Module will require more fibre ports on the external fibre switch.C、The Optical Pass-Thru Module does not provide the customer with an opportunity to reuse their fibre switch.D、The blade servers do not work with the Optical Pass-Thru Module.

考题 A customer is implementing a POWER Blade solution which requires the VIO Server to be mirrored on internal disk drives. Which Blade supports the requirement?()A、JS21B、JS23C、PS700D、PS701

考题 A customer is deploying a new database on a PS701 Blade in a BladeCenter H, and requires redundant network and SAN adapters. Which configuration supports the customer requirement?()A、Configure 2 CFFh combination fibre channel / gigabit Ethernet adaptersB、Configure 1 CFFh 2-port fibre channel adapter and 1 CIOv 2-port gigabit Ethernet adapterC、Configure 1 CIOv 2-port fibre channel adapter and 1 CFFh combination fibre channel / gigabit Ethernet adapterD、Configure 1 CIOv 2-port gigabit Ethernet adapter and 1 CFFh combination fibre channel / gigabit Ethernet adapter

考题 单选题A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the full fabric internal fibre switches. Consequently, the customer is considering an N_Port ID Virtualization (NPIV) capable switch.Which of the following should be mentioned to the customer regarding the NPIV switch?()A You can not use an NPIV switch in the same IBM BladeCenter chassis as a Cisco Intelligent Ethernet Switch B Using blade servers with the NPIV switch will require more fibre ports on the external fibre switch C Storage devices like Fibre Channel Tape and Disk cannot be attached to the NPIV Switch but must connect to a core fabric switchD The NPIV switch will count against the number of domains in a fabric

考题 单选题A customer is implementing a POWER Blade solution which requires the VIO Server to be mirrored on internal disk drives. Which Blade supports the requirement?()A JS21B JS23C PS700D PS701

考题 单选题A customer is deploying a new database on a PS701 Blade in a BladeCenter H, and requires redundant network and SAN adapters. Which configuration supports the customer requirement?()A Configure 2 CFFh combination fibre channel / gigabit Ethernet adaptersB Configure 1 CFFh 2-port fibre channel adapter and 1 CIOv 2-port gigabit Ethernet adapterC Configure 1 CIOv 2-port fibre channel adapter and 1 CFFh combination fibre channel / gigabit Ethernet adapterD Configure 1 CIOv 2-port gigabit Ethernet adapter and 1 CFFh combination fibre channel / gigabit Ethernet adapter

考题 单选题A customer wants to boot from SAN with their IBM BladeCenter infrastructure.  What is required for the customer to be able to perform this? ()A 4GB Modular Flash Drive for each Blade Server and Dual 15.8GB 2.5 Solid State Drive for each Blade Server B Cisco Intelligent Gb Ethernet Switch Module and IBM BladeCenter Copper Pass-thru Module C Fibre Channel Expansion Card for each Blade Server and Fibre Channel SAN Switch Module D Cisco Intelligent Gb Ethernet Switch Module and Dual 15.8GB 2.5 Solid State Drive for each Blade Server

考题 单选题A customer has a requirement for a single AIX LPAR to be highly available. The customer only has enough funding to purchase a single system. Which would be the most critical option to mitigate AIX availability?()A Dual power supplies.B Twice the amount of disk.C Two dual-port LHEA adapters.D Two dual-port fibre channel adapters.

考题 单选题A customer is deploying a new database on a PS701 Blade in a BladeCenter H, and requires redundant network and SAN adapters. Which configuration supports the customer requirement?()A Configure 2CFFh combination fibre channel / gigabit Ethernet adaptersB Configure 1CFFh 2-port fibre channel adapter and 1 CIOv 2-port gigabit Ethernet adapterC Configure 1CIOv 2-port fibre channel adapter and 1 CFFh combination fibre channel / gigabit Ethernet adapterD Configure 1CIOv 2-port gigabit Ethernet adapter and 1 CFFh combination fibre channel / gigabit Ethernet adapter

考题 单选题A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the internal fibre switches. Consequently. the customer wants to use the Optical Pass-Thru Module (OPM).  What TRUE statement should be mentioned to the customer regarding the OPM?()A You can not put the Optical Pass-Thru Module in the same IBM BladeCenter chassis as a Cisco Intelligent Ethernet Switch.B Using blade servers with the Optical Pass-Thru Module will require more fibre ports on the external fibre switch.C The Optical Pass-Thru Module does not provide the customer with an opportunity to reuse their fibre switch.D The blade servers do not work with the Optical Pass-Thru Module.

考题 单选题A customer uses an IBM xSeries x366 for their network server.They experienced downtime when the NIC failed earlier this year.Their Novell 6.5 server needs to be accessible all the time at the highest speed possible.Slots are available where network adapters can still be added.  High availability is the primary requirement, but increased network bandwidth on the server is also required. Which of the following is the most cost-effective solution to satisfy all of the customer’s requirements?()A Upgrade the network switches to 10Gb speed.B Install a dual port gigabit Ethernet adapter and configure adapter load balancing teaming with the onboard adapters.C Install one extra adapter to team with the internal adapter and configure adapter failover.D Install two additional NICs and configure adapter load balancing teaming with the onboard adapters.

考题 单选题A customer wants to boot from an iSCSI SAN with their IBM BladeCenter infrastructure running Microsoft Windows Server 2000.  What is required for the customer to be able to perform this?()A Fibre Channel Expansion Card for each Blade ServerB cKVM Card for each Blade ServerC iSCSI Expansion Card for each Blade ServerD 4Gb Modular Flash Drive