网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

A customer has a requirement for a single AIX LPAR to be highly available. The customer only has enough funding to purchase a single system. Which would be the most critical option to mitigate AIX availability?()

  • A、Dual power supplies.
  • B、Twice the amount of disk.
  • C、Two dual-port LHEA adapters.
  • D、Two dual-port fibre channel adapters.

参考答案

更多 “ A customer has a requirement for a single AIX LPAR to be highly available. The customer only has enough funding to purchase a single system. Which would be the most critical option to mitigate AIX availability?()A、Dual power supplies.B、Twice the amount of disk.C、Two dual-port LHEA adapters.D、Two dual-port fibre channel adapters.” 相关考题
考题 The customer is considering an IBM System Storage DS8000. Which of the following indicates a requirement for the Business Partner to perform a TDA?() A. capacity above 500 TBB. first in customer locationC. a new model has been releasedD. sold without implementation service

考题 Your customer wants to build a network for a financial trading floor that has a requirement for multiple high-value transactions, which are also vital to the customer. What are the two most critical requirements? ()(Choose two.)A. no single point of failureB. trading database server locationC. redundant application servers locationD. deterministic response to all failuresE. determine which protocol to use

考题 What type of experience is NOT listed as a requirement for the job?A.Word processing B.Landscape design C.Customer service D.Marketing

考题 Which service component within the prepare phase recommends the appropriate technology strategy to address a business requirement of the customer?()A、 identifying what a customer requires from a proposed solutionB、 analyzes the customer s business requirements and recommends the appropriate Cisco technologies to meet business requirementsC、 determining what end-user training a customer requiresD、 addressinga customer s physical requirements

考题 The customer is considering an IBM System Storage DS8000. Which of the following indicates a requirement for the Business Partner to perform a TDA?()A、capacity above 500 TBB、first in customer locationC、a new model has been releasedD、sold without implementation service

考题 One of your customers has decided to deploy location-based services in addition to existingwireless services. The customer requires that the additional access points to be deployed in monitor-onlymode. The most likely reason for this requirement is that the customer has which of these existingwireless devices?()A、Data CollectionB、802.11b/g VoIPC、802.11b and g clientsD、RFID tags

考题 A healthcare customer has an IBM System i server and an HP-UX server. They have high performance I/O, image-based, and archival applications. The customer has asked the IBM team  for guidance on IBM DS8000 disk technologies.  Which DS8000 disk technology would provide the best performance without regard to cost to meet the customer requirement()A、73 GB 15k and 300 GB 15k drivesB、73 GB SSD and 2TB 7.2k drivesC、146 GB 15k and 300 GB 15k drivesD、146 GB 15k and 2TB 7.2k drives

考题 A customer has two DS8000 systems in their environment. One DS8000 has FlashCopy licensed while the other does not. The customer wishes to license FlashCopy on the second DS8000.  Which of the following describes the TDA requirement in this situation()A、a pre-sale TDA is mandatoryB、a pre-install TDA is mandatoryC、a pre-install TDA is not mandatory since it is not FirstIn Customer Location (FICL)D、both pre-sale and pre-install TDAs are mandatory

考题 A customer has a Power 770 running an SAP ERP workload on AIX 7. It has a single partition with 12 cores and 48GB of memory and the CPU is underutilized at 46% with 1000 users. Memory utilization is at 80%. The number of users will increase to 1700, increasing memory utilization by 37%. Which of the following supports this requirement?()A、Active Memory ServerB、Active Memory SharingC、Active Memory PoolingD、Active Memory Expansion

考题 A customer has a key application running in a logical partition on a POWER5 system. The customer wants the ability to run the application with minimal down time using Live Partition Mobility.  Which of the following is the minimum PowerVM edition and hardware configuration that will support the customer requirement?()A、 PowerVM Standard Edition on POWER6 hardwareB、 PowerVM Standard Edition with POWER5 hardware C、 PowerVM Enterprise Edition with POWER6 hardwareD、 PowerVM Enterprise Edition with POWER5 hardware

考题 单选题A customer has a 32-core Power 770 with 4 AIX partitions and 2 IBM i partitions. They want to improve network availability and allow for concurrent maintenance. What will support the customer requirement at least cost?()A Build the logical partition infrastructure based on 6 or more VLANs.B Build the logical partition infrastructure based on two or more IVEs.C Build the logical partition infrastructure based on Partition Mobility.D Build the logical partition infrastructure based on redundant VIO Servers.

考题 单选题A customer has a requirement to eliminate single points of failure for an application.  They have allocated one Ethernet adapter to each VIO server on the system. Which features of PowerVM and AIX will support the customer requirement?()A Etherchannel and trunkingB Network Interface Backup and EtherchannelC Shared Ethernet Adapter (SEA) Failover and EtherchannelD Network Interface Backup and Shared Ethernet Adapter failover

考题 单选题A customer has four AIX partitions that require a SAN. The disk subsystem must replicate to aremote site via an IP network. Each site has two Cisco MDS 9509 directors with fibre channel linecards. Which of the following must be added to each director to meet the IP requirement?()A tri-rate SFPB update to the latest Cisco IOSC FCIP activation on the existing 16 FC line cardsD Multiprotocol Services Module with FCIP activation

考题 单选题A customer has a requirement to build a 4 node cluster. Disk heartbeating will be used as the non-IP network.What is the maximum number of disk heartbeat point-to-point links one would need to implement in order toachieve the highest level of availability?()A 4B 6C 8D 12

考题 单选题Your customer has converted from traditional servers to BladeCenter technology and has a requirement for an RSA adapter on a new BladeCenter server.  Which of the following options would you use? ()A Remote Supervisor Adapter II (RSA II Slimline)B Management Module, which comes standard on the BladeCenterC Acoustic Attenuation ModuleD Ethernet NICs

考题 单选题The customer is considering an IBM System Storage DS8000. Which of the following indicates a requirement for the Business Partner to perform a TDA?()A capacity above 500 TBB first in customer locationC a new model has been releasedD sold without implementation service

考题 单选题A pharmaceutical company has a requirement for 8.5 TB of usable storage for a new data center. The customer has multiple host applications running on Solaris, Windows 2003, HP-U/X, Linux, and IBM System i platforms.  Which IBM System Storage DS8000 volume configuration providesthe best performance and highest availability for this customer()A RAID 3B RAID 5C RAID 6D RAID 10

考题 单选题One of your customers has decided to deploy location-based services in addition to existingwireless services. The customer requires that the additional access points to be deployed in monitor-onlymode. The most likely reason for this requirement is that the customer has which of these existingwireless devices?()A Data CollectionB 802.11b/g VoIPC 802.11b and g clientsD RFID tags

考题 单选题One of your customers has decided to deploy location-based services in addition to existing wireless services. The customer requires that the additional access points to be deployed in monitor-only mode. The most likely reason for this requirement is that the customer has which of these existing wireless devices?()A 802.11b/g VoIPB Data CollectionC 802.11b and g clientsD RFID tags

考题 单选题A customer has a mixed environment of AIX on POWER4 and POWER5, and x86 based systems running a supported distribution of Linux. There is a total of 7 partitions and three standalone x86 servers. The customer wants to consolidate their applications using a single 4-core POWER6 server.  What is the minimum PowerVM edition that supports the customer requirement?()A  PowerVM Lx86B  PowerVM Express EditionC  PowerVM Standard EditionD  PowerVM Enterprise Edition

考题 多选题Your customer wants to build a network for a financial trading floor that has a requirement formultiple high-value transactions, which are also vital to the customer. What are the two mostcritical requirements?() (Choose two.)Ano single point of failureBtrading database server locationCredundant application servers locationDdeterministic response to all failuresEdetermine which protocol to use

考题 单选题A customer has a requirement for a storage solution that meets the following criteria:       (1)Heterogeneous hosts attached       (2)Support for block I/O       (3)High Speed       (4)Scalable  Which solution would satisfy the customer’s requirement?()A SANB NASC SCSID iSCSI