网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
A customer has a requirement for a single AIX LPAR to be highly available. The customer only has enough funding to purchase a single system. Which would be the most critical option to mitigate AIX availability?()
A

Dual power supplies.

B

Twice the amount of disk.

C

Two dual-port LHEA adapters.

D

Two dual-port fibre channel adapters.


参考答案

参考解析
解析: 暂无解析
更多 “单选题A customer has a requirement for a single AIX LPAR to be highly available. The customer only has enough funding to purchase a single system. Which would be the most critical option to mitigate AIX availability?()A Dual power supplies.B Twice the amount of disk.C Two dual-port LHEA adapters.D Two dual-port fibre channel adapters.” 相关考题
考题 Your customer wants to build a network for a financial trading floor that has a requirement for multiple high-value transactions, which are also vital to the customer. What are the two most critical requirements? ()(Choose two.)A. no single point of failureB. trading database server locationC. redundant application servers locationD. deterministic response to all failuresE. determine which protocol to use

考题 A customer has a mixed environment of AIX on POWER4 and POWER5, and x86 based systems running a supported distribution of Linux. There is a total of 7 partitions and three standalone x86 servers. The customer wants to consolidate their applications using a single 4-core POWER6 server.  What is the minimum PowerVM edition that supports the customer requirement?()A、 PowerVM Lx86B、 PowerVM Express EditionC、 PowerVM Standard EditionD、 PowerVM Enterprise Edition

考题 A customer has an 8-way p5-570 with eight internal disk drives and AIX 5.2.  Which of the following must be added, if anything, to the configuration to support four LPARs, assuming each LPAR requires twodisk drives?()A、7311-D20 drawer with four disksB、Upgrade to AIX 5.3C、Fiber adapters to attach to SAND、Nothing

考题 A customer has a failing HBA adapter and needs to identify the location of the adapter.  Which of the following AIX commands should the specialist recommend the customer review?()A、rmdevB、chdevC、drslotD、cfgmgr

考题 An AIX LPAR has been reconfigured to use direct-attached disks. What is the best way to fully remove and delete the Virtual IO volumes?()A、On the AIX LPAR: rmdev -dl hdisk#, rmdev -dl vscsi#B、On the VIO Server: rmdev -dev rootvg_disk, rmlv rootlv_nameC、On the AIX LPAR: rmdev -dl hdisk#, rmdev -dl vscsi# On the VIO Server: rmdev -dev rootvg_disk, rmlv rootlv_nameD、On the VIO Server: rmdev -dev rootvg_disk, rmlv rootlv_name On the AIX LPAR: rmdev -dl hdisk#, rmdev -dl vscsi#

考题 A customer has a Power 770 running an SAP ERP workload on AIX 7. It has a single partition with 12 cores and 48GB of memory and the CPU is underutilized at 46% with 1000 users. Memory utilization is at 80%. The number of users will increase to 1700, increasing memory utilization by 37%. Which of the following supports this requirement?()A、Active Memory ServerB、Active Memory SharingC、Active Memory PoolingD、Active Memory Expansion

考题 A customer has a requirement for a single AIX LPAR to be highly available. The customer only has enough funding to purchase a single system. Which would be the most critical option to mitigate AIX availability?()A、Dual power supplies.B、Twice the amount of disk.C、Two dual-port LHEA adapters.D、Two dual-port fibre channel adapters.

考题 A p5 570 12 way was purchased with the plan to install six LPARs running AIX 5.2. The machine has 12 disks spread evenly over the internal server drawers. The customer would now like to add a seventh LPAR. Which of the following should be added for the seventh LPAR boot device?()A、An additional 7311-D10 drawerB、An adapter to boot off a SAN deviceC、An additional disk to the media bayD、Two disks to the internal configuration

考题 Which of the following environments is most closely addressed by the N series N3600?()A、a customer that requires block level storage B、a customer that requires CIFS and AIX NFS environments C、a customer that requires good scalability and performance D、a customer that needs to consolidate multiple storage controllers under a single interface

考题 A customer has an LPAR with 4 dedicated cores on a POWER7 server with SMT4 enabled. How many logical processors are presented to an application running on this LPAR?()A、4B、8C、16D、32

考题 Companycom wants the application server LPAR to communicate with the database LPAR on a p5 590 without using network adapters. What does the customer need to install?()A、VIO ServerB、AIX 5.2 ML4C、Shared Ethernet AdapterD、AIX 5.3 with Advanced Power Virtualization

考题 A large customer is consolidating their pSeries systems onto a p5 590. They will have a requirement for a single device (disk, lun) to have multiple paths through different  adapters in a single LPAR. The primary applications were written for AIX 5.2. Which of the following would be the recommended solution to satisfy this requirement?()A、Assign the adapters to a Virtual IO partitionB、Use the MPIO function included in AIX 5.2C、Migrate the application to AIX 5.3 and use the MPIO functionD、Set up two Virtual IO partitions and attach both partitions to the device

考题 A customer has several small AIX applications that are expected to grow over the next several years.  The biggest challenge facing the customer is determining the growth rate of the applications and the I/T requirements needed to support the growth.  They are also concerned about the under-utilization of their IT resources.  What should the pSeries technical specialist recommend to address this challenge?()A、Install a p615 per application.B、Install a p650 with AIX 5.2 and dynamic LPAR and CUoD.C、Install the appropriate solution once the requirements are understood.D、Install a POWER5 system with AIX 5.3, Advanced POWER Virtualization, and CoD.

考题 Companycom has plans to deploy a large database solution. Their primary requirement is minimal user access downtime. They are comparing a single server implementation with a two server deployment. What solution would they use to avoid downtime for OS software maintenance?()A、Apply OS updates once a yearB、Utilize a GPFS cluster solutionC、Implement a two server deployment with HACMPD、Install a single server implementation with HACMP failover to a second LPAR

考题 A customer has a pSeries that needs to be upgraded from AIX Version 5.1 to AIX Version 5.2. The customer wants to retain /etc/passwd. Which of the following installation types should be used?()A、Preservation InstallB、Retention InstallC、Overwrite InstallD、Migration Install

考题 Companycom has a requirement for an LPAR in their p5 595 to run SUSE Linux. They also require an adapter that is not currently supported in Linux. Which of the following would be the best solution to recommend?()A、Assign the adapter to an IO Hosting partitionB、Use AIX 5L affinity to move the application from SUSE to AIXC、Use AIX 5.3 drivers to install the adapter in the Linux LPARD、Assign the adapter to an AIX 5.3 partition running Linux Affinity

考题 Companycom is considering a partitioned solution with one of the LPARs utilizing 12 CPUs. Multiple applications will be loaded on this large LPAR. However, the customer wants to ensure some tasks will have higher priority access to the CPU and memory resources. Which of the following solutions would best satisfy the requirement?()A、LoadlevelerB、AIX Workload ManagerC、Partition Load ManagerD、Tivoli Provisioning Manager

考题 单选题A p5 570 12 way was purchased with the plan to install six LPARs running AIX 5.2. The machine has 12 disks spread evenly over the internal server drawers. The customer would now like to add a seventh LPAR. Which of the following should be added for the seventh LPAR boot device?()A An additional 7311-D10 drawerB An adapter to boot off a SAN deviceC An additional disk to the media bayD Two disks to the internal configuration

考题 单选题A customer has a requirement to eliminate single points of failure for an application.  They have allocated one Ethernet adapter to each VIO server on the system. Which features of PowerVM and AIX will support the customer requirement?()A Etherchannel and trunkingB Network Interface Backup and EtherchannelC Shared Ethernet Adapter (SEA) Failover and EtherchannelD Network Interface Backup and Shared Ethernet Adapter failover

考题 单选题A customer has four AIX partitions that require a SAN. The disk subsystem must replicate to aremote site via an IP network. Each site has two Cisco MDS 9509 directors with fibre channel linecards. Which of the following must be added to each director to meet the IP requirement?()A tri-rate SFPB update to the latest Cisco IOSC FCIP activation on the existing 16 FC line cardsD Multiprotocol Services Module with FCIP activation

考题 单选题Companycom has just purchased a p5 570 with AIX 5.3. The customer would like to add a training LPAR to the system, but no processors are available. All of the partitions are using dedicated resources. The test LPAR is using one processor and has a 90% CPU idle rate. What can be done to setup this training LPAR quickly without disabling their current environment?()A Use AIX 5.3 which supports micro-partitioning for both the test and training LPARSB Use DLPAR to move resources from the test LPAR to training when training is activeC Install Partition Load Manager to share resources between the test and training environmentsD Install Advanced Power Virtualization and then use micro-partitioning for both the test and training LPARs

考题 单选题Companycom has the following: 8 x 1.65GHz CPUs 16GB Memory 4 LPARs LPAR 1: Test/Dev 1 CPU, 2GB Memory, 1 Fibre Channel HBA, AIX 5.3 LPAR 2: QA 1 CPU, 2GB Memory, 1 Fibre Channel HBA, AIX 5.3 LPAR 3: Prod 3 CPUs, 6GB Memory, 1 Fibre Channel HBA, AIX 5.3 LPAR 4: Web App 3 CPUs, 6GB Memory, 1 Fibre Channel HBA, SUSE Linux Utilization over a 30 day period LPAR 1: Average utilization was 15%, Peak utilization was 100% LPAR 2: Average utilization was 25%, Peak utilization was 100% LPAR 3: Average utilization was 50%, Peak utilization was 90% LPAR 4: Average utilization was 35%, Peak utilization was 100% If the customer has a requirement for all four LPARs moved to a p5 590 and to have dedicated CPU resources. Which of the following would best describe the profile requirements?()A LPARs 1 and 2, SMT on, min CPU 1.0, max CPU 1.0, desired CPU 1.0 LPARs 3 and 4, SMT on, min CPU 1.0, max CPU 3.0, desired CPU 2.0 B LPARs 1 and 2, SMT on, min CPU 1.0, max CPU 1.0, desired CPU 1.0 LPARs 3 and 4, SMT on, min CPU 2.0, max CPU 3.0, desired CPU 3.0 C LPARs 1 and 2, SMT on, min CPU 1.0, max CPU 3.0, desired CPU 3.0 LPARs 3 and 4, SMT on, min CPU 1.0, max CPU 3.0, desired CPU 2.0 D LPARs 1 and 2, SMT off, min CPU 1.0, max CPU 1.0, desired CPU 1.0 LPARs 3 and 4, SMT off, min CPU 1.0, max CPU 3.0, desired CPU 3.0

考题 单选题A customer has a mixed environment of AIX on POWER4 and POWER5, and x86 based systems running a supported distribution of Linux. There is a total of 7 partitions and three standalone x86 servers. The customer wants to consolidate their applications using a single 4-core POWER6 server.  What is the minimum PowerVM edition that supports the customer requirement?()A  PowerVM Lx86B  PowerVM Express EditionC  PowerVM Standard EditionD  PowerVM Enterprise Edition

考题 单选题Companycom wants to reduce the number of copper, Ethernet adapters on their 4 way p5 570 running AIX 5.3 used in each of the four LPARs. Companycom has one database LPAR, two application LPARs, and one web LPAR. Only the Web LPAR needs to communicate with the outside world. What is the minimum number of Ethernet adapters that should be provided to ensure redundancy and no single point of failure?()A One single port Ethernet adapterB Four dual port Ethernet adaptersC Two single port Ethernet adaptersD Eight single port Ethernet adapters

考题 多选题Your customer wants to build a network for a financial trading floor that has a requirement formultiple high-value transactions, which are also vital to the customer. What are the two mostcritical requirements?() (Choose two.)Ano single point of failureBtrading database server locationCredundant application servers locationDdeterministic response to all failuresEdetermine which protocol to use

考题 单选题An AIX LPAR has been reconfigured to use direct-attached disks. What is the best way to fully remove and delete the Virtual IO volumes?()A On the AIX LPAR: rmdev -dl hdisk#, rmdev -dl vscsi#B On the VIO Server: rmdev -dev rootvg_disk, rmlv rootlv_nameC On the AIX LPAR: rmdev -dl hdisk#, rmdev -dl vscsi# On the VIO Server: rmdev -dev rootvg_disk, rmlv rootlv_nameD On the VIO Server: rmdev -dev rootvg_disk, rmlv rootlv_name On the AIX LPAR: rmdev -dl hdisk#, rmdev -dl vscsi#

考题 单选题A customer has a requirement for a storage solution that meets the following criteria:       (1)Heterogeneous hosts attached       (2)Support for block I/O       (3)High Speed       (4)Scalable  Which solution would satisfy the customer’s requirement?()A SANB NASC SCSID iSCSI