网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
()loading has not been completed,the Charterer is entitled to delay the vessel’s sailing until the expiration of lay time.
A

As long so

B

So long

C

As long

D

So long as


参考答案

参考解析
解析: 暂无解析
更多 “单选题()loading has not been completed,the Charterer is entitled to delay the vessel’s sailing until the expiration of lay time.A As long soB So longC As longD So long as” 相关考题
考题 Which of the following networking methods allows us to show that the last % of one element cannot be completed until % of a previous element has been completed?A.PERTB.ADMC.PDMD.All of the above.E.A and C only.

考题 161 Which of the following networking methods allows us to show that the last 10% of one element cannot be completed until 62% of a previous element has been completed?A. PERTB. ADMC. PDMD. All of the above.E. A and C only

考题 43 Which of the following networking methods allows us to show that the last 10% of one element cannot be completed until 62% of a previous element has been completed?A. PERTB. ADMC. PDMD. All of the above.E. A and C only.

考题 It has been over a century _______ the railway was completed. (A)when(B) once(C) which(D) since

考题 The loss has not yet been accurately, but it is believed to be well beyond a hundred million dollars.A. calculated B. considered C. completed D. controlled

考题 After a fire has been extinguished in a closed space, personnel may safely enter the space whenA.smoke density has been decreased sufficiently to see the bulkhead opposite the compartment's entranceB.a lifeline and explosion proof flash light are usedC.all smoke and toxic fumes are removed and an adequate oxygen supply is presentD.overhaul has been completed to remove any possible source of re-ignition

考题 If it________fine tomorrow,we shall start loading.A.to beB.isC.will beD.has been

考题 The mere fact that free pratique has not been obtained ________ mean that the ship is not ready to load, if, in fact, free pratique can be obtained at any time and without the possibility of delaying the loading.A.does notB.is notC.are notD.has not

考题 The Master of a vessel may tender a Notice of Readiness to the charterer when the vessel ______.A.has completed the terms of the charter partyB.is in all respects ready to loadC.is in all respects ready to sailD.is safely moored or at a suitable anchorage

考题 The Charterer is entitled to the benefit of the excepted perils during the transit of the goods from storing place to the actual place of loading,provided such transit substantially ______ part of the operation of loading.A.has the form of aB.formsC.is in the form of aD.is to form a

考题 A vessel has completed loading cargo in the port of San Francisco. What document is signed by the Master stating the terms that goods were delivered by the shipper and were received by the ship? ______.A.Bill of GoodsB.Bill of LadingC.Cargo ManifestD.Cargo Receipt

考题 Sometimes charter-party expressly prohibit the loading of dangerous goods,but sometimes a Charterer is entitled by an express term to load them provided that due notice is given ______.A.to the masterB.the chartererC.the merchantD.receiver

考题 ______ the Charterer seeks to say that the contract has been frustrated or that there has been an anticipatory breach which entitles him to rescind,then he has such rights as are given him at common law.A.WhereB.As a fact thatC.In so far asD.In no case that

考题 The charterer has completed loading the vessel in 3 days instead of the 5 days agreed to in the charter party.As a result of this,the ______.A.Shipowner may charge for two laydaysB.Charterer may receive dispatch moneyC.Stevedore may collect demurrageD.Consignee may be required to pay a ceaser fee

考题 There has been a positive response to the export promotion()?A、hasn’t itB、hasn’t thereC、doesn’t itD、has there

考题 So far the construction of the two new bridges over the river ().A、have been completedB、has been completedC、has completedD、have completed

考题 单选题If the Shipowner makes an innocent misrepresentation which induces the Charterer to sign the contract,the Charterer may be entitled to()the charter-party.A rescindB changeC alterD amend

考题 单选题A breach of the()undertaking of seaworthiness at the port of loading entitles the Charterer to refuse to load.A suppliedB compliedC providedD implied

考题 单选题A vessel has completed loading cargo in the port of San Francisco. What document is signed by the Master stating the terms that goods were delivered by the shipper and were received by the ship?().A Bill of GoodsB Bill of LadingC Cargo ManifestD Cargo Receipt

考题 单选题()the Charterer seeks to say that the contract has been frustrated or that there has been an anticipatory breach which entitles him to rescind,then he has such rights as are given him at common law.A WhereB As a fact thatC In so far asD In no case that

考题 单选题After a fire has been extinguished in a closed space, personnel may safely enter the space when ().A smoke density has been decreased sufficiently to see the bulkhead opposite the compartments entranceB a lifeline and explosion proof flash light are usedC all smoke and toxic fumes are removed and an adequate oxygen supply is presentD overhaul has been completed to remove any possible source of re-ignition

考题 单选题A continuous sounding of a fog-signal apparatus indicates().A the vessel is in distressB the vessel has completed loading dangerous cargoC it is safe to passD the vessel is anchored

考题 单选题Should it appear that war or blockade would prevent the vessel from safely reaching the port of destination and / or discharging the goods thereat,the Carrier().A is entitled to discharge the goods at the port of loading or any other safe and convenient place and terminate the contract of carriageB is not entitled to terminate the contract of carriageC is not entitled to claim against the shipper or charterer any damage that he will suffer with the cargo on boardD is entitled to claim freight with the cargo on board

考题 单选题The Charterer is entitled to the benefit of the excepted perils during the transit of the goods from storing place to the actual place of loading,provided such transit substantially ()part of the operation of loading.A has the form of aB formsC is in the form of aD is to form a

考题 单选题Sometimes charter-party expressly prohibit the loading of dangerous goods,but sometimes a Charterer is entitled by an express term to load them provided that due notice is given ().A to the masterB the chartererC the merchantD receiver

考题 单选题The distance a vessel moves at right angles to the original course,when a turn of 180°has been completed,is called the().A advanceB pivoting pointC tactical diameterD kick

考题 单选题—It’s said that the new highway has been completed.—Yes, but we don’t know ______it’s to be opened to traffic soon.A whichB whenC whetherD since