网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
The boom stops are installed on an offshore crane to().
A

prevent the boom from being raised too high

B

prevent the boom from swinging

C

support the boom when not in use

D

prevent the boom from being lowered


参考答案

参考解析
解析: 暂无解析
更多 “单选题The boom stops are installed on an offshore crane to().A prevent the boom from being raised too highB prevent the boom from swingingC support the boom when not in useD prevent the boom from being lowered” 相关考题
考题 On a crane, the boom indicator tells the operator what angle the boom angle is compared to the ______.A.vertical positionB.horizontal positionC.boom stop angleD.minimum radius angle

考题 The electrical components for each single crane are installed in its ______.A.crane houseB.machinery baseC.turntableD.All of the above

考题 The boom stops are installed on an offshore crane to ______.A.prevent the boom from being raised too highB.prevent the boom from swingingC.support the boom when not in useD.prevent the boom from being lowered

考题 The boom stops on a pedestal crane prevent the boom from ______.A.being raised too highB.swinging at seaC.overloading when not in useD.being lowered too low

考题 The signal man assisting a crane operator has his arm extended with his fingers closed and thumb pointing upward.This is the signal to ______.A.raise the boomB.raise the hookC.raise the boom and hookD.check the boom stop

考题 For any given pedestal crane,when the boom is lengthened,the lifting capacity is ______.A.unchangedB.increasedC.eliminatedD.decreased

考题 The load chart of a ship crane enables the operator to combine the load radius with boom length to determine the ______.A.Maximum counter weight requiredB.Minimum horsepower requiredC.Hoist rope strengthD.Allowable load

考题 What does “evel-luffing” accomplish during crane operations ________.A.It prevents the load from swinging when the boom level is adjustedB.Less power is needed when topping the boom with a load on the hookC.It maintains the height of the load above the deckD.All of the above

考题 What is meant by the term“luffing the boom”of a crane ________.A.Stopping the boomB.Topping or lowering the boomC.Moving the boom left or rightD.All of the above

考题 When a cargo boom or crane is rated at varying capacities,there will be a table at the controls which relates safe working load to ______.A.winch speedB.boom strengthC.load radiusD.cable strength

考题 While off-loading from an offshore supply vessel with the crane,the wind increases in strength and changes direction significantly,you should ______.A.Expedite off-loadingB.Stop off-loading,but keep the offshore supply vessel in the present locationC.Continue off-loading with no changesD.Move the offshore supply vessel to the downwind side

考题 单选题The ()(笨重货) must be handled by jumbo boom or shore crane.A awkward cargoB drummed cargoC cased cargoD heavy cargo

考题 单选题Which action(s) is/are included in crane operations?()A Normal boom stowage and shutdown operationsB Emergency shutdown operationC Removing booms from stowageD All of the above

考题 单选题For any given pedestal crane,when the boom is lengthened, the lifing capacity is().A unchangedB increasedC eliminatedD decreased

考题 单选题The signal man assisting a crane operator has his arm extended with his fingers closed and thumb pointing upward. This is the signal to().A raise the boomB raise the hookC raise the boom and hookD check the boom stop

考题 单选题On a ship’s crane,the load chart relates the allowable load to the combination of the boom length and().A winch speedB boom strengthC load radiusD cable strength

考题 单选题The boom stops on a pedestal crane prevent the boom from().A being raised too highB swinging at seaC overloading when not in useD being lowered too low

考题 单选题What is meant by the term“luffing the boom”of a crane().A Stopping the boomB Topping or lowering the boomC Moving the boom left or rightD All of the above

考题 单选题Which of the following statements is FALSE concerning cranes being installed on the centerline of vessels().A A centerline crane can never be operated in tandemB One crane is able to work one end of two adjacent hatchesC These cranes are more economical and weigh less than outboard-mounted cranesD One crane is able to work both sides of the ship

考题 单选题When a cargo boom or crane is rated at varying capacities,there will be a table at the controls which relates safe working load to().A winch speedB boom strengthC load radiusD cable strength

考题 单选题The load chart of a crane enables the operator to combine the load radius with boom length to determine the().A maximum counter weight requiredB minimum horsepower requiredC hoist rope strengthD allowable load

考题 单选题Sudden starts or stops of the boom is likely to cause all of the following except().A breaking a cargo runnerB parting guys topping liftsC carrying away a blockD overheating the resistors and eventually burning out

考题 单选题The load chart of a ship crane enables the operator to combine the load radius with boom length to determine the().A maximum counter weight requiredB minimum horsepower requiredC hoist rope strengthD allowable load

考题 单选题What does “evel-luffing” accomplish during crane operations().A It prevents the load from swinging when the boom level is adjustedB Less power is needed when topping the boom with a load on the hookC It maintains the height of the load above the deckD All of the above

考题 单选题0n a crane ,the boom indicator tells the operator what angle the boom angle is compared to the().A vertical positionB horizontal positionC boom stop angleD minimum radius angle

考题 单选题The boom indicator on a crane will indicate the().A length of the boomB angle of the boomC lifting capacity of the boomD direction of the boom

考题 单选题On a ship crane,the load chart relates the allowable load to the combination of boom length and().A boom angleB boom strengthC load radiusD cable strength