网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
The ()(笨重货) must be handled by jumbo boom or shore crane.
A

awkward cargo

B

drummed cargo

C

cased cargo

D

heavy cargo


参考答案

参考解析
解析: 暂无解析
更多 “单选题The ()(笨重货) must be handled by jumbo boom or shore crane.A awkward cargoB drummed cargoC cased cargoD heavy cargo” 相关考题
考题 ________ is used for heaving up and slacking away the anchor and chainA.A winchB.A windlassC.A craneD.A jumbo boom

考题 What cargo does a jumbo boom or heavy derrick used for lifting?

考题 If our captain is not in his cabin, he must be on the(驾驶台)_______.A.paint lockerB.engine roomC.bridgeD.shore

考题 If your vessel is equipped with a radiotelephone,what must also be aboard?A.Certificate of InspectionB.List of ship stationsC.Copy of ship to shore channelsD.Radio station license

考题 成为尖货商品之后,以下哪个是尖货标?()A、Flash DealsB、Handled by AliExpressC、Hot saleD、Featured Brand

考题 The jumbo boom can lift heavy cargo, the gantry crane can hoist containers.()A、重吊杆吊重货和集装箱货。B、龙门吊能起吊重件货,重吊杆能起吊集装箱。C、重吊杆能起吊重件货,龙门吊能起吊集装箱。D、龙门吊吊重货和集装箱货。

考题 袋装大米、冷藏货和危险货的积载要求是什么?何为笨重货和超长货?在《国际货规》中危险品分为几类?

考题 车站要在笨重货区配备卸车堆码使用的防湿垫木。

考题 If our captain is not in his cabin, he must be on the ().A、paint lockerB、engine roomC、bridgeD、shore

考题 If our captain is not in his cabin, he must be on the(驾驶台)().A、paint lockerB、engine roomC、bridgeD、shore

考题 The()(精致货) must be handled with care.A、bagged cargoB、delicate cargoC、cased cargoD、non-packed cargo

考题 Some general cargo is handled by ().A、shore cranesB、heavy derricksC、containersD、equipment

考题 What is required for proper implementation of jumbo frame support on a Cisco Nexus 2000 Series Fabric Extender?()    A、 The interface configured as FEX fabric requires the MTU to be set to jumbo.B、 The service policy must be applied to the system QoS.C、 The device defaults to jumbo frame support; no changes are required.D、 The switchport in the FEX interface must be set to MTU 9216.

考题 单选题0ur jumbo boom can()20 tons.A liftB riseC elevateD hoist

考题 单选题If your vessel is equipped with a radiotelephone,what must also be aboard?()A Certificate of InspectionB List of ship stationsC Copy of ship to shore channelsD Radio station license

考题 单选题0ur jumbo boom()out of use for a long time.A isB will beC have beenD has been

考题 单选题The jumbo boom can lift heavy cargo, the gantry crane can hoist containers.()A 重吊杆吊重货和集装箱货。B 龙门吊能起吊重件货,重吊杆能起吊集装箱。C 重吊杆能起吊重件货,龙门吊能起吊集装箱。D 龙门吊吊重货和集装箱货。

考题 单选题The connection facilities for the international shore connection must be located to provide access().A on either side of the vesselB as close as possible to the houseC on the main deckD on each level of the accommodation space

考题 单选题The lifeboats on your vessel are stowed on cradles on deck and are handled by sheath-screw boom davits. Which of the following statements about launching a boat is TRUE?()A The boat should be hoisted a few inches clear of the cradle before cranking out the davitsB The inboard gripes should be cast off before the outboard gripesC The outboard section of the cradle must be releasedD The tricing pendants will automatically bring the boat alongside at the embarkation deck

考题 单选题Shore power must be() during dock repair.A disconnectedB switched offC cut offD connected

考题 单选题The greatest strain,when lifting a load with the jumbo purchase,is on().A all of the parts,dividing the load equallyB the hauling part because it must absorb the frictional losses of all the sheavesC the parts in the movable blockD the standing part because it is directly connected to the weight

考题 单选题Most people hate to do clothes-ironing because ______.A it has to be done by one personB it must be handled skillfullyC it involves careful planningD it is time-consuming

考题 单选题What is required for proper implementation of jumbo frame support on a Cisco Nexus 2000 Series Fabric Extender?()A  The interface configured as FEX fabric requires the MTU to be set to jumbo.B  The service policy must be applied to the system QoS.C  The device defaults to jumbo frame support; no changes are required.D  The switchport in the FEX interface must be set to MTU 9216.

考题 单选题我们每航次拆卸一次吊杆。()A We dismantle the jumbo boom twice a voyage.B We dismantle the derricks once a voyage.C We examine the derricks once a voyage.D We dismantle the heavy derricks once a voyage.

考题 单选题The jumbo boom can ().A lift heavy cargoB load and unloadC join ropes togetherD lift light cargo

考题 单选题Our jumbo boom can()20 tons.A liftB riseC elevateD hoist

考题 单选题An oceangoing ship of 400 gross tons and above must be fitted with a standard discharge shore connectionWhat is the size of the bolt circle diameter of the shore connection required to transfer oily ballast to a shore side reception facility?()A 125 mmB 183 mmC 215 mmD It depends on outside pipe diameter