The trim and stability booklet must be approved by the().
A

International Maritime Organization

B

National Cargo Bureau

C

Society of Naval Architects and Marine Engineers

D

United States Coast Guard


参考答案

参考解析
解析: 暂无解析
更多 “单选题The trim and stability booklet must be approved by the().A International Maritime OrganizationB National Cargo BureauC Society of Naval Architects and Marine EngineersD United States Coast Guard” 相关考题
考题 A contract is legally binding and must comprise all but one of the following:A legal capacityB mutual assentC approved negotiationsD considerationE legality

考题 31 A contract is legally binding and must comprise all but one of the following:A. legal capacityB. mutual assentC. approved negotiationsD. considerationE. legality

考题 The Emergency Position Indicating Radiobeacon on a cargo vessel must be stowed ______.A.in an inside passagewayB.in an approved bracketC.so that it is accessible from the bridge of the vesselD.so that it will float free if the vessel sinks

考题 If your passenger vessel has been issued a stability letter,it must be ______.A.filed in the ship's officeB.posted in a passenger areaC.posted adjacent to the Certificate of InspectionD.posted in the pilothouse

考题 The Chief Mate must ascertain that the deck loads are stowed in such a manner as ______.A.not to affect the draught trimB.not to affect the cargo ventilationC.not to affect the free surfaceD.not to affect the vessel's stability

考题 A vessel has a strong wind on the port beam. This has the same affect on stability as ______.A.weight that is off-center to starboardB.increasing the draftC.reducing the freeboardD.increasing the trim

考题 Each vessel in ocean and coastwise service must have an approved EPIRB.An EPIRB______.A.must be stowed in a manner so that it will float free if the vessel sinksB.is a devise that transmits a radio signalC.must be stowed where it is readily accessible for testing and useD.All of the above

考题 Which narrative regarding loading software is incorrect?()A、The approved Loading Program could substituted the approved Loading Manual and/or Trim and Stability BookletB、A Loading Program is required to have General Approval by classification Society prior to being considered for use on a specific shipC、Following a satisfactory installation test on board the ship the Surveyor will issue a Program Installation TestD、A Loading Program may be provided as a classification requirement or as an Owner’s option

考题 What must be done in order to automatically close the purchase requisition (PR) after one or more purchase orders (PO) have been created?  ()A、 All PR lines must be assigned to a PO.B、 The PR must be in the Approved status.C、 The PR must enter the workflow process.D、 All manual company input fields must be completed.

考题 单选题Your vessel was damaged and initially assumed a significant list and trim; however,further increase has been slow. Based on this data,what should you expect?()A The slowing is only temporary and the vessel will probably suddenly capsize or plunge from loss of stability due to change in the waterplane areaB The vessel can probably be saved if further flooding can be stoppedC The vessel will continue to slowly list and/or trim due to the free surface effect and free communication effectD The vessel will suddenly flop to the same or greater angle of list on the other side and may capsize

考题 单选题Your vessel is damaged with no list,but down by the stern. There is progressive flooding and trim by the stern is increasing. What is the effect on transverse stability after the deck edge at the stern is submerged?()A KB increases,increasing BM and therefore GMB KG increases due to the weight of the added water on deckC BM decreases from loss of water plane and greater volumeD There is no effect on transverse stability

考题 单选题During a stability test on a small passenger vessel().A the vessel must be moored snuglyB each tank must be partially full to show it does not leakC all dunnage,tools,and extraneous items are securedD water under vessel must be deep enough to prevent grounding

考题 单选题If the cause of a sudden severe list or trim is negative initial stability,counter flooding into empty tanks may().A increase the righting momentB cause an increase in the righting armC bring the unit to an upright equilibrium positionD cause the unit to flop to a greater angle

考题 单选题The term SEAWORTHY TRIM means()the ship must be in trim to meet the perils of the passage by sea to the next port not only in the sense that she should be left with an adequate amount of cargo to keep her on an even keel,but also that where necessary part of her cargo should be bagged to stop it shifting while out at sea.A itB thatC whereD while

考题 单选题A vessel has a strong wind on the port beam. This has the same affect on stability as().A weight that is off-center to starboardB increasing the draftC reducing the freeboardD increasing the trim

考题 单选题The Emergency Position Indicating Radiobeacon on a cargo vessel must be stowed().A in an inside passagewayB in an approved bracketC so that it is accessible from the bridge of the vesselD so that it will float free if the vessel sinks

考题 单选题If your passenger vessel has been issued a stability letter,it must be ().A filed in the ship’s officeB posted in a passenger areaC posted adjacent to the Certificate of InspectionD posted in the pilothouse

考题 单选题Master must ascertain that deck loads are stowed in such a manner as().A not to affect the vessel's stability and trimB to affect the vessel's stabilityC to affect the vessel's trimD to affect the vessel's atability or trim

考题 单选题What is NOT a problem area when loading barges on a LASH type vessel? ()A Frequent stability calculations requiredB Thorough pre-planning requiredC Limiting depths alongside berths restrict barge draftsD Minimum trim and 0°list are required for optimum operations

考题 单选题An offshore drilling unit must be equipped with a first aid kit approved by the().A Coast GuardB American Bureau of ShippingC Minerals Management ServiceD Mine Safety and Health Administration

考题 单选题The tendency of a vessel to return to its original trim after being inclined by an external force is().A equilibriumB buoyancyC transverse stabilityD longitudinal stability

考题 单选题The Emergency Position Indicating Radio beacon on a cargo vessel must be stowed().A in an inside passagewayB in an approved bracketC so that it is accessible from the bridge of the vesselD so that it will float free if the vessel sinks

考题 单选题All self-propelled vessels on an international voyage must be equipped with how many Emergency Position Indicating Radio beacons (EPIRB)? ()A One approved Category 1 EPIRBB Three approved Category 1 EPIRBsC One approved Class B EPIRBD Two approved Class B EPIRBs

考题 单选题All self-propelled vessels on an international voyage must be equipped with how many Emergency Position Indicating Radiobeacons (EPIRB)()?A One approved Class A EPIRBB Two approved Class A EPIRBsC One approved Class B EPIRBsD Two approved Class B EPIRBs

考题 单选题What must be done in order to automatically close the purchase requisition (PR) after one or more purchase orders (PO) have been created?  ()A  All PR lines must be assigned to a PO.B  The PR must be in the Approved status.C  The PR must enter the workflow process.D  All manual company input fields must be completed.

考题 单选题Which narrative regarding loading software is incorrect?()A The approved Loading Program could substituted the approved Loading Manual and/or Trim and Stability BookletB A Loading Program is required to have General Approval by classification Society prior to being considered for use on a specific shipC Following a satisfactory installation test on board the ship the Surveyor will issue a Program Installation TestD A Loading Program may be provided as a classification requirement or as an Owner’s option

考题 单选题A ship must have on board a first-aid kit that is approved by the().A Minerals Management ServiceB Occupational Safety and Health AdministrationC Mine Safety and Health AdministrationD American Bureau of Shipping