哪些人可以报考英国的特许公认会计师资格,快来了解!

发布时间:2020-04-15


ACCA(特许公认会计师公会Association of Chartered Certified Accountants)是全球最具规模的国际专业会计师组织,为全世界有志投身于财务、会计以及管理领域的专才提供首选的资格认证,同时也是最早进入中国的国际专业会计师组织。ACCA目前在中国大陆拥有6,000多名会员及63,300多名学员,并在北京、上海、成都、广州、深圳、沈阳、青岛、武汉、长沙、香港以及澳门共设有11个代表处。

ACCA以国际会计准则为基础,运用统一的考试标准以培养符合国际需求的财会人士。据统计,中国境内企业约有1800万家,其中外资企业约有100余万家。而中国国内符合条件的人才仅为几万人。巨大的人才缺口这使得ACCA证书在我国国内非常有途。目前,ACCA中国区认可雇主超过700家,已涵盖了很多知名的中资、合资、外资企业,ACCA的认可度更是远高于中国注册会计师。ACCA不仅能为全球商业发展提供强有力的支持,还能满足渴望成功的国际化人才的需求。

ACCA含金量这么高的情况下,哪些人才有资格报考ACCA呢?具备以下条件之一即可:

1、教育部认可的高等院校在校生(本科在校),顺利完成大一的课程考试,即可报名成为ACCA的正式学员;

2、凡具有教育部承认的大专以上学历,即可报名成为ACCA的正式学员;

3、未符合12项报名资格的申请者,年满16周岁的可以先申请参加FIA(Foundations in Accountancy)基础财务资格考试。在完成FAB(基础商业会计)FMA(基础管理会计)FFA(基础财务会计)3门课程后,可以豁免ACCA AB-FA三门课程的考试,直接进入ACCA技能课程的考试。

如何追加免试?

一、追加方式

将新得到的学历或资格证明文件的复印件和盖章翻译件发送至 students@accaglobal.com info@accaglobal.com,告知学员号,并要求追加免试,请用英文编辑邮件。如果学历或资格证明本身是英文,则不需翻译件。

二、有效时间

追加免试一年有2次机会,针对每年6月份或12月份考试,截止日分别为每年115日及715日。

注册网页出现Error怎么办?

这可能是由于英国网络系统不稳定造成的。如遇到此情况,可以换个时间或换一个不同IP地址的电脑进行注册。如果仍不成功,可以将出错的页面截图,直接发至官方查询账户的状态。(官方邮件地址students@accaglobal.com

今日分享时间到此结束啦,如果大家觉得意犹未尽,还想了解更多内容的话,敬请关注51题库考试学习网。


下面小编为大家准备了 ACCA考试 的相关考题,供大家学习参考。

(b) You are the audit manager of Jinack Co, a private limited liability company. You are currently reviewing two

matters that have been left for your attention on the audit working paper file for the year ended 30 September

2005:

(i) Jinack holds an extensive range of inventory and keeps perpetual inventory records. There was no full

physical inventory count at 30 September 2005 as a system of continuous stock checking is operated by

warehouse personnel under the supervision of an internal audit department.

A major systems failure in October 2005 caused the perpetual inventory records to be corrupted before the

year-end inventory position was determined. As data recovery procedures were found to be inadequate,

Jinack is reconstructing the year-end quantities through a physical count and ‘rollback’. The reconstruction

exercise is expected to be completed in January 2006. (6 marks)

Required:

Identify and comment on the implications of the above matters for the auditor’s report on the financial

statements of Jinack Co for the year ended 30 September 2005 and, where appropriate, the year ending

30 September 2006.

NOTE: The mark allocation is shown against each of the matters.

正确答案:
(b) Implications for the auditor’s report
(i) Corruption of perpetual inventory records
■ The loss of data (of physical inventory quantities at the balance sheet date) gives rise to a limitation on scope.
Tutorial note: It is the records of the asset that have been destroyed – not the physical asset.
■ The systems failure in October 2005 is clearly a non-adjusting post balance sheet event (IAS 10). If it is material
(such that non-disclosure could influence the economic decisions of users) Jinack should disclose:
– the nature of the event (i.e. systems failure); and
– an estimate of its financial effect (i.e. the cost of disruption and reconstruction of data to the extent that it is
not covered by insurance).
Tutorial note: The event has no financial effect on the realisability of inventory, only on its measurement for the
purpose of reporting it in the financial statements.
■ If material this disclosure could be made in the context of explaining how inventory has been estimated at
30 September 2005 (see later). If such disclosure, that the auditor considers to be necessary, is not made, the
audit opinion should be qualified ‘except for’ disagreement (over lack of disclosure).
Tutorial note: Such qualifications are extremely rare since management should be persuaded to make necessary
disclosure in the notes to the financial statements rather than have users’ attention drawn to the matter through
a qualification of the audit opinion.
■ The limitation on scope of the auditor’s work has been imposed by circumstances. Jinack’s accounting records
(for inventory) are inadequate (non-existent) for the auditor to perform. tests on them.
■ An alternative procedure to obtain sufficient appropriate audit evidence of inventory quantities at a year end is
subsequent count and ‘rollback’. However, the extent of ‘roll back’ testing is limited as records are still under
reconstruction.
■ The auditor may be able to obtain sufficient evidence that there is no material misstatement through a combination
of procedures:
– testing management’s controls over counting inventory after the balance sheet date and recording inventory
movements (e.g. sales and goods received);
– reperforming the reconstruction for significant items on a sample basis;
– analytical procedures such as a review of profit margins by inventory category.
■ ‘An extensive range of inventory’ is clearly material. The matter (i.e. systems failure) is not however pervasive, as
only inventory is affected.
■ Unless the reconstruction is substantially completed (i.e. inventory items not accounted for are insignificant) the
auditor cannot determine what adjustment, if any, might be determined to be necessary. The auditor’s report
should then be modified, ‘except for’, limitation on scope.
■ However, if sufficient evidence is obtained the auditor’s report should be unmodified.
■ An ‘emphasis of matter’ paragraph would not be appropriate because this matter is not one of significant
uncertainty.
Tutorial note: An uncertainty in this context is a matter whose outcome depends on future actions or events not
under the direct control of Jinack.
2006
■ If the 2005 auditor’s report is qualified ‘except for’ on grounds of limitation on scope there are two possibilities for
the inventory figure as at 30 September 2005 determined on completion of the reconstruction exercise:
(1) it is not materially different from the inventory figure reported; or
(2) it is materially different.
■ In (1), with the limitation now removed, the need for qualification is removed and the 2006 auditor’s report would
be unmodified (in respect of this matter).
■ In (2) the opening position should be restated and the comparatives adjusted in accordance with IAS 8 ‘Accounting
Policies, Changes in Accounting Estimates and Errors’. The 2006 auditor’s report would again be unmodified.
Tutorial note: If the error was not corrected in accordance with IAS 8 it would be a different matter and the
auditor’s report would be modified (‘except for’ qualification) disagreement on accounting treatment.

3 The directors of Panel, a public limited company, are reviewing the procedures for the calculation of the deferred tax

provision for their company. They are quite surprised at the impact on the provision caused by changes in accounting

standards such as IFRS1 ‘First time adoption of International Financial Reporting Standards’ and IFRS2 ‘Share-based

Payment’. Panel is adopting International Financial Reporting Standards for the first time as at 31 October 2005 and

the directors are unsure how the deferred tax provision will be calculated in its financial statements ended on that

date including the opening provision at 1 November 2003.

Required:

(a) (i) Explain how changes in accounting standards are likely to have an impact on the provision for deferred

taxation under IAS12 ‘Income Taxes’. (5 marks)

正确答案:

(a) (i) IAS12 ‘Income Taxes’ adopts a balance sheet approach to accounting for deferred taxation. The IAS adopts a full
provision approach to accounting for deferred taxation. It is assumed that the recovery of all assets and the settlement
of all liabilities have tax consequences and that these consequences can be estimated reliably and are unavoidable.
IFRS recognition criteria are generally different from those embodied in tax law, and thus ‘temporary’ differences will
arise which represent the difference between the carrying amount of an asset and liability and its basis for taxation
purposes (tax base). The principle is that a company will settle its liabilities and recover its assets over time and at that
point the tax consequences will crystallise.

Thus a change in an accounting standard will often affect the carrying value of an asset or liability which in turn will
affect the amount of the temporary difference between the carrying value and the tax base. This in turn will affect the
amount of the deferred taxation provision which is the tax rate multiplied by the amount of the temporary differences(assuming a net liability for deferred tax.)

 


The town of Brighttown in Euraria has a mayor (elected every five years by the people in the town) who is responsible for, amongst other things, the transport policy of the town.

A year ago, the mayor (acting as project sponsor) instigated a ‘traffic lite’ project to reduce traffic congestion at traffic lights in the town. Rather than relying on fixed timings, he suggested that a system should be implemented which made the traffic lights sensitive to traffic flow. So, if a queue built up, then the lights would automatically change to green (go). The mayor suggested that this would have a number of benefits. Firstly, it would reduce harmful emissions at the areas near traffic lights and, secondly, it would improve the journey times for all vehicles, leading to drivers ‘being less stressed’. He also cited evidence from cities overseas where predictable journey times had been attractive to flexible companies who could set themselves up anywhere in the country. He felt that the new system would attract such companies to the town.

The Eurarian government has a transport regulation agency called OfRoad. Part of OfRoad’s responsibilities is to monitor transport investments and it was originally critical of the Brighttown ‘traffic lite’ project because the project’s benefits were intangible and lacked credibility. The business case did not include a quantitative cost/benefit analysis. OfRoad has itself published a benefits management process which classifies benefits in the following way.

Financial: A financial benefit can be confidently allocated in advance of the project. Thus if the investment will save $90,000 per year in staff costs then this is a financial benefit.

Quantifiable: A quantifiable benefit is a benefit where there is sufficient credible evidence to suggest, in advance, how much benefit will result from the project. This benefit may be financial or non-financial. For example, energy savings from a new building might be credibly predicted in advance. However, the exact amount of savings cannot be accurately forecast.

Measurable benefit: A measurable benefit is a benefit which can only be confidently assessed post-implementation, and so cannot be reliably predicted in advance. Increase in sales from a particular initiative is an example of a measurable benefit. Measurable benefits may either be financial or non-financial.

Observable benefit: An observable benefit is a benefit which a specific individual or group will decide, using agreed criteria, has been realised or not. Such benefits are usually non-financial. Improved staff morale might be an example of an observable benefit.

One month ago, the mayoral elections saw the election of a new mayor with a completely distinct transport policy with different objectives. She wishes to address traffic congestion by attracting commuters away from their cars and onto public transport. Part of her policy is a traffic light system which gives priority to buses. The town council owns the buses which operate in the town and they have invested heavily in buses which are comfortable and have significantly lower emissions than the conventional cars used by most people in the town. The new mayor wishes to improve the frequency, punctuality and convenience of these buses, so that they tempt people away from using their cars. This will require more buses and more bus crews, a requirement which the mayor presents as ‘being good for the unemployment rate in this town’. It will also help the bus service meet the punctuality service level which it published three years ago, but has never yet met. ‘A reduction in cars and an increase in buses will help us meet our target’, the mayor claims.

The mayor has also suggested a number of initiatives to discourage people from taking their cars into the town. She intends to sell two car parks for housing land (raising $325,000) and this will reduce car park capacity from 1,000 to 800 car spaces per day. She also intends to raise the daily parking fee from $3 to $4. Car park occupancy currently stands at 95% (it is difficult to achieve 100% for technical reasons) and the same occupancy rate is expected when the car park capacity is reduced.

The new mayor believes that her policy signals the fact that Brighttown is serious about its green credentials. ‘This’, she says, ‘will attract green consumers to come and live in our town and green companies to set up here. These companies and consumers will bring great benefit to our community.’ To emphasise this, she has set up a Go Green team to encourage green initiatives in the town.

The ‘traffic lite’ project to tackle congestion proposed by the former mayor is still in the development stage. The new mayor believes that this project can be modified to deliver her vision and still be ready on the date promised by her predecessor.

Required:

(a) A ‘terms of reference’ (project initiation document, project charter) was developed for the ‘traffic lite’ project to reduce traffic congestion.

Discuss what changes will have to be made to this ‘terms of reference’ (project initiation document, project charter) to reflect the new mayor’s vision of the project. (5 marks)

(b) The new mayor wishes to re-define the business case for the project, using the benefits categorisation suggested by OfRoad. Identify costs and benefits for the revised project, classifying each benefit using the guidance provided by OfRoad. (14 marks)

(c) Stakeholder management is the prime responsibility of the project manager.

Discuss the appropriate management of each of the following three stakeholders identified in the revised (modified) project.

(i) The new mayor;

(ii) OfRoad;

(iii) A private motorist in Brighttown who uses his vehicle to commute to his job in the town. (6 marks)

正确答案:

(a) Objectives and scope

From the perspective of the ‘traffic lite’ project, the change in mayor has led to an immediate change in the objectives driving the project. This illustrates how public sector projects are susceptible to sudden external environmental changes outside their control. The project initially proposed to reduce traffic congestion by making traffic lights sensitive to traffic flow. It was suggested that this would improve journey times for all vehicles using the roads of Brighttown. However, the incoming mayor now wishes to reduce traffic congestion by attracting car users onto public transport. Consequently she wants to develop a traffic light system which will give priority to buses. This should ensure that buses run on time. The project is no longer concerned with reducing journey times for all users. Indeed, congestion for private cars may get worse and this could further encourage car users to switch to public transport.

An important first step would be to confirm that the new mayor wishes to be the project sponsor for the project, because the project has lost its sponsor, the former mayor. The project scope also needs to be reviewed. The initial project was essentially a self-contained technical project aimed at producing a system which reduced queuing traffic. The revised proposal has much wider political scope and is concerned with discouraging car use and improving public bus services. Thus there are also proposals to increase car parking charges, to reduce the number of car park spaces (by selling off certain car parks for housing development) and to increase the frequency, quality and punctuality of buses. The project scope appears to have been widened considerably, although this will have to be confirmed with the new project sponsor.

Only once the scope of the revised project been agreed can revised project objectives be agreed and a new project plan developed, allocating the resources available to the project to the tasks required to complete the project. It is at this stage that the project manager will be able to work out if the proposed delivery date (a project constraint) is still manageable. If it is not, then some kind of agreement will have to be forged with the project sponsor. This may be to reduce the scope of the project, add more resources, or some combination of the two.

(b) Cost benefit

The re-defined project will have much more tangible effects than its predecessor and these could be classified using the standard approach suggested in the scenario. Benefits would include:

– One-off financial benefit from selling certain car parks

– this appears to be a predictable financial benefit of $325,000 which can be confidently included in a cost/benefit analysis.

– Increased income from public bus use – this appears to be a measurable benefit, in that it is an aspect of performance which can be measured (for example, bus fares collected per day), but it is not possible to estimate how much income will actually increase until the project is completed. – Increased income from car parks

– this appears to be a quantifiable benefit if the assumption is made that usage of the car parks will stay at 95%. There may indeed be sufficient confidence to define it as a financial benefit. Car park places will be reduced from 1,000 to 800, but the increase in fees will compensate for this reduction in capacity. Current expected daily income is 1,000 x $3 x 0·95 = $2,850. Future expected income will be 800 x $4 x 0·95 = $3,040.

– Improved punctuality of buses – this will again be a measurable benefit. It will be defined in terms of a Service Level promised to the residents of Brighttown. Improved punctuality might also help tempt a number of vehicle users to use public transport instead.

– Reduced emissions – buses are more energy efficient and emit less carbon dioxide than the conventional vehicles used by most of the inhabitants of Brighttown. This benefit should again be measurable (but non-financial) and should benefit the whole of the town, not just areas around traffic lights.

– Improved perception of the town – the incoming mayor believes that her policy will help attract green consumers and green companies to the town. Difficulties in classifying what is meant by these terms makes this likely to be an observable benefit, where a group, such as the Go Green team, established by the council itself can decide (based on their judgement) whether the benefit has been realised or not.

The costs of implementing the project will also have to be re-assessed. These costs will now include:

– The cost of purchasing more buses to meet the increased demand and frequency of service.

– The operational costs of running more buses, including salary costs of more bus drivers.

– Costs associated with the disposal of car parks.

– Costs associated with slowing down drivers (both economic and emotional).

The technical implementation requirements of the project will also change and this is almost certain to have cost implications because a solution will have to be developed which allows buses to be prioritised. A feasibility study will have to be commissioned to examine whether such a solution is technically feasible and, if it is, the costs of the solution will have to be estimated and entered into the cost-benefit analysis.

(c) A stakeholder grid (Mendelow) provides a framework for understanding how project team members should communicate with each stakeholder or stakeholder group. The grid itself has two axes. One axis is concerned with the power or influence of the stakeholder in this particular project. The other axis is concerned with the stakeholder’s interest in the project.

The incoming mayor: High power and high interest. The mayor is a key player in the project and should be carefully and actively managed throughout. The mayor is currently enthusiastic about the project and this enthusiasm has to be sustained. As the likely project sponsor, it will be the mayor’s responsibility to promote the project internally and to make resources available to it. It will also be up to her to ensure that the promised business benefits are actually delivered. However, she is also the person who can cancel the project at any time.

OfRoad – a government agency: OfRoad were critical of the previous mayor’s justification for the project. They felt that the business case was solely based on intangible benefits and lacked credibility. It is likely that they will be more supportive of the revised proposals for two reasons. Firstly, the proposal uses the classification of benefits which it has suggested. Secondly, the proposal includes tangible benefits which can confidently be included in a cost-benefit analysis. OfRoad is likely to have high power (because it can intervene in local transport decisions) but relatively low interest in this particular project as the town appears to be following its guidelines. An appropriate management strategy would be to keep watch and monitor the situation, making sure that nothing happens on the project which would cause the agency to take a sudden interest in it.

The private motorist of Brighttown: Most of these motorists will have a high interest in the project, because it impacts them directly; but, individually, they have very little power. Their chance to influence policy has just passed, and mayoral elections are not due for another five years. The suggested stakeholder management approach here is to keep them informed. However, their response will have to be monitored. If they organise themselves and band together as a group, they might be able to stage disruptive actions which might raise their power and have an impact on the project. This makes the point that stakeholder management is a continual process, as stakeholders may take up different positions in the grid as they organise themselves or as the project progresses.


声明:本文内容由互联网用户自发贡献自行上传,本网站不拥有所有权,未作人工编辑处理,也不承担相关法律责任。如果您发现有涉嫌版权的内容,欢迎发送邮件至:contact@51tk.com 进行举报,并提供相关证据,工作人员会在5个工作日内联系你,一经查实,本站将立刻删除涉嫌侵权内容。