站内搜索
SK0-002 问题列表
问题
单选题Two new servers are purchased and need to be installed to allow sharing of a single external hard drive enclosure. One server is configured as a local file server, and the other as a database server for a different network. The onsite technician notices that when both servers are running at the same time, they each receive SCSI errors. When they are running individually, no errors are reported. Which of the following is the BEST source of information to use for troubleshooting this problem?()A
the server vendor’s FAQ websiteB
the SCSI controller vendor’s user manualC
the drive enclosure vendor’s user manualD
the network operating system vendor’s website
问题
单选题The latest SCSI adaptor card is purchased from a vendor. Drivers for the operating system cannot be obtained. The SCSI adapter card is added to an existing server. Upon booting, the operating system does not detect the card. Which of the following is the MOST likely cause of the problem?()A
The SCSI card is not seated correctly.B
The termination is incorrectly set on the SCSI card.C
The SCSI card is not listed on the operating system HCL (Hardware Compatibility List).D
Operating system patches were not updated before installing the card.
问题
单选题Which action increases server availability?()A
configuring a second network card with a different IP addressB
replacing the existing 100 Mbps NIC with a gigabit Ethernet NICC
using adapter teaming and configuring the second network card with the same IP address as the first network cardD
installing a dual-port network card that can handle the future growth and setting one NIC to 10 Mbps and one NIC to 100 Mbps
问题
单选题What is the MOST accurate way to determine a project’s duration before execution?()A
The project manager performs all estimatesB
Incorporate each individual worker’s estimatesC
Acquire expert estimatesD
There is no way to determine the duration
问题
单选题If the organizational spending plan has allocated $100,000 for a project, and the high level budget estimate for that project is $200,000; which of the following is accurate?()A
The high level budget estimates are inaccurateB
The organizational spending plan is inaccurateC
The budget is not aligned with the spending plan of the organizationD
The detailed bottom up budget will need to be adjusted
问题
单选题Within Information Technology projects, communications between the project manager and the project team members should take place:()A
by written and oral communication.B
via a weekly status report.C
through the formal chain of command.D
with approved template forms.
问题
单选题Which throughput does a 33 MHz, 33-bit bus have?()A
132 MbpsB
256 MbpsC
264 MbpsD
450 Mbps
问题
单选题As a rule of thumb for QA (Quality Assurance) activities, how many hours of downstream QA (Quality Assurance) costs are saved for each hour spent on technical reviews early in the project?()A
Up to 5B
Up to 10C
Up to 15D
Up to 20
问题
单选题Acceptance of deliverables to multiple locations requires which type of sign off?()A
Design AcceptanceB
Code AcceptanceC
Module AcceptanceD
Site Acceptance
问题
单选题What is the role of the line manager in a project plan?()A
Provide resources to a projectB
Request requirements changesC
Resolve team conflictsD
Control the project budget
问题
单选题Why does a project manager need an executive sponsor?()A
To keep the project team focused on its workB
To provide behind-the-scenes assistance with organizational commitment and supportC
To sign-off on user requirementsD
To negotiate contracts with outside vendors
问题
单选题A large corporation is concerned about the amount of time it takes to back up their main file server. They are also concerned that their IT technician frequently forgets to change the backup tapes, thereby leaving the company open to data loss. Which backup system would solve both problems?()A
RAIDB
tape libraryC
optical storageD
disk to disk to tape
问题
单选题The current data center has run out of space. A room that is located next to the existing data center is then used to house two racks containing six servers. Six months later, physical housekeeping is performed as part of a mid-year maintenance plan. Which environmental condition discovered in the room is LEAST critical?()A
There are discolored ceiling tiles near the middle of the room.B
Large amounts of dust have accumulated in the corners of the room.C
The anti-static carpet has been removed resulting in a bare painted concrete floor.D
A wet pipe water-based sprinkler system has been installed above the racks.
问题
单选题After upgrading a server motherboard to the latest firmware revision, configuring LAN access in the SSU (System Setup Utility) fails. Which action should be taken FIRST to correct this problem?()A
replace the NICB
install the latest SSU (System Setup Utility) versionC
upgrade the firmware on the NICD
assign the NIC a static IRQ in the SSU (System Setup Utility)
问题
单选题What is a reason for reviewing the user requirements document with the client?()A
To gain the client’s acceptance of the detailed designB
To verify mutual understanding of project resourcesC
To verify mutual understanding of the detailed project planD
To verify mutual understanding of targeted product performanceE
To verify mutual understanding of the tests that will be done after the product is completed