网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
Why does a project manager need an executive sponsor?()
A
To keep the project team focused on its work
B
To provide behind-the-scenes assistance with organizational commitment and support
C
To sign-off on user requirements
D
To negotiate contracts with outside vendors
参考答案
参考解析
解析:
暂无解析
更多 “单选题Why does a project manager need an executive sponsor?()A To keep the project team focused on its workB To provide behind-the-scenes assistance with organizational commitment and supportC To sign-off on user requirementsD To negotiate contracts with outside vendors” 相关考题
考题
单选题Who is responsible for authorizing closure of the project?()A
Project ManagerB
StakeholderC
CustomerD
Executive Sponsor
考题
单选题What is a reason for reviewing the user requirements document with the client?()A
To gain the client’s acceptance of the detailed designB
To verify mutual understanding of project resourcesC
To verify mutual understanding of the detailed project planD
To verify mutual understanding of targeted product performanceE
To verify mutual understanding of the tests that will be done after the product is completed
考题
单选题If the organizational spending plan has allocated $100,000 for a project, and the high level budget estimate for that project is $200,000; which of the following is accurate?()A
The high level budget estimates are inaccurateB
The organizational spending plan is inaccurateC
The budget is not aligned with the spending plan of the organizationD
The detailed bottom up budget will need to be adjusted
考题
单选题Which RAID standard combines data striping across drives with mirroring?()A
RAID 0+1B
RAID 1+5C
RAID 3D
Hybrid RAID 5+
考题
多选题Which three should be documented after upgrading a SCSI RAID controller?()Adisk utilizationBinstallation dateCadapter baselinesDlocation slot of the RAID controllerEstatus of the adapter card installationFRAID controller information (warranty, specifications etc.)
考题
单选题Which of the following SCSI signaling systems uses one return line for every outgoing line, is less susceptible to interference, signal degradation, crosstalk, and allows a cable length of up to 25 meters?()A
SE (Single Ended)B
DE (Double Ended)C
LVD (Low Voltage Differential)D
HVD (High Voltage Differential)
考题
单选题Within Information Technology projects, communications between the project manager and the project team members should take place:()A
by written and oral communication.B
via a weekly status report.C
through the formal chain of command.D
with approved template forms.
热门标签
最新试卷