网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
Company.com  with limited AIX skills has purchased a p5-520 2-way which will run Micro-Partitions. To reduce the initial cost of purchase, the customer will be sharing the system resources using a VIO server. The customer is concerned about managing the installation of the operating system. Which of the following should the customer perform?()
A

Use alt_disk_install to install AIX on all logical partitions.

B

Configure the DVD as a desired resource on all partitions.

C

Configure all resources as shared resources between all partitions.

D

Create a separate NIM server to manage the installation of all partitions.


参考答案

参考解析
解析: 暂无解析
更多 “单选题Company.com  with limited AIX skills has purchased a p5-520 2-way which will run Micro-Partitions. To reduce the initial cost of purchase, the customer will be sharing the system resources using a VIO server. The customer is concerned about managing the installation of the operating system. Which of the following should the customer perform?()A Use alt_disk_install to install AIX on all logical partitions.B Configure the DVD as a desired resource on all partitions.C Configure all resources as shared resources between all partitions.D Create a separate NIM server to manage the installation of all partitions.” 相关考题
考题 An IBM XIV system with nine modules and 2 TB disks is being proposed to a customer who needs to increase disk capacity in the data center. The customer is concerned about data growth andcost after the initial purchase. Which of the following factors of the solution should be stressed to the customer to address data growth?()A. the XIV system can be scaled by the addition of modulesB. XIV offers thin provisioning for all available host operating systemsC. reduced operating costs will pay for another XIV system in less than two yearsD. the management GUI allows the administrator tovirtualize the entire storage system quickly

考题 A customer has requested a proposal for a p5-520 with AIX 5.2 and Sysback.  There are no plans to run LPARs or Micro-Partitions on the p5-520 in the near future.  The customer has asked the pSeries technical specialist to recommend anything else that may be needed.  Which of the following should be recommended in this situation?()A、HMCB、DVD-ROMC、Tape driveD、Network switch

考题 A customer has a requirement to eliminate single points of failure for an application.  They have allocated one Ethernet adapter to each VIO server on the system. Which features of PowerVM and AIX will support the customer requirement?()A、Etherchannel and trunkingB、Network Interface Backup and EtherchannelC、Shared Ethernet Adapter (SEA) Failover and EtherchannelD、Network Interface Backup and Shared Ethernet Adapter failover

考题 Companycom has just purchased a p5 570 with AIX 5.3. The customer would like to add a training LPAR to the system, but no processors are available. All of the partitions are using dedicated resources. The test LPAR is using one processor and has a 90% CPU idle rate. What can be done to setup this training LPAR quickly without disabling their current environment?()A、Use AIX 5.3 which supports micro-partitioning for both the test and training LPARSB、Use DLPAR to move resources from the test LPAR to training when training is activeC、Install Partition Load Manager to share resources between the test and training environmentsD、Install Advanced Power Virtualization and then use micro-partitioning for both the test and training LPARs

考题 A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system.  How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()A、 Install a VIO server as an additional partition and DLPAR the resources from the existing partition to the VIO server.B、 Create a service partition and install a VIO server. This will automatically move resources to the VIO server on reboot of the managed system.C、 Delete all the existing LPARs, create a new LPAR and assign all the system resources to this LPAR and then install the VIO server on this LPAR.D、 Reset the machine to Manufacturing Default Configuration and install the VIO server on the resulting partition created, which will own all system resources.

考题 An IBM XIV system with nine modules and 2 TB disks is being proposed to a customer who needs to increase disk capacity in the data center. The customer is concerned about data growth andcost after the initial purchase. Which of the following factors of the solution should be stressed to the customer to address data growth?()A、the XIV system can be scaled by the addition of modulesB、XIV offers thin provisioning for all available host operating systemsC、reduced operating costs will pay for another XIV system in less than two yearsD、the management GUI allows the administrator tovirtualize the entire storage system quickly

考题 A customer has budget sign-off to purchase a new p5-550 2-way server to replace their aging 2-way 7025-6F0. They like the advantages of the Simultaneous Multi Processing (SMT) ability of this server.  Their application is certified at AIX 5.2 and is scheduled for AIX 5.3 certification in six months. The Chief Information Officer is concerned that they will lose the budget if they do not purchase the server this fiscal year.  What is the most relevant and cost-effective advice the pSeries technical specialist can offer?()A、Purchase a 4-way p630 to compensate for not using SMT.B、Purchase the p5-550 server and install AIX 5.2, which can be upgraded to AIX 5.3 later.C、Purchase the p5-550 server and install AIX 5.2 and enable SMT.D、Suspend the purchase of a new machine at this time and upgrade the current server to a 4-way server.

考题 A proposed server architecture includes SAN LUNs being presented to client LPARs using shared HBAs to reduce infrastructure cost. The customer requires minimal management efforts for the dual VIO Servers.   Which technology is recommended for this proposal?()A、NPIVB、vSCSIC、Arbitrated loopD、Converged adapter

考题 Companycom is currently using a p690 and has just ordered a p5 590. They prefer to run in full system partition mode, since their application will utilize all the resources in the machine, and they don't want the overhead of an LPAR. What is the best response to the customer about the POWER5 capabilities?()A、POWER5 runs in an SMP mode as defaultB、POWER5 can run in a full system mode the same as the p690C、POWER5 can run in full system mode with the purchase of PLMD、POWER5 can run in a full system mode, but it is in LPAR mode

考题 Company.com has a two-way p5-520 that will be running three shared processor Micro-Partitions consuming 60 percent of system resources. Immediately prior to shipment, the customer discovered they need to run a fourth server that requires AIX 5L V5.2. Which of the following will satisfy this requirement?()A、Change to a 4-way p5-550B、Use Capacity on DemandC、Configure a fourth logical partitionD、Add memory to the configuration

考题 A customer is consolidating seven IBM i partitions onto a POWER7 system, using VIO Server to virtualize resources.Which of the following PowerVM editions is appropriate for this customer?()A、IBM i EditionB、Express EditionC、Standard EditionD、Enterprise Edition

考题 A customer has a requirement for a single AIX LPAR to be highly available. The customer only has enough funding to purchase a single system. Which would be the most critical option to mitigate AIX availability?()A、Dual power supplies.B、Twice the amount of disk.C、Two dual-port LHEA adapters.D、Two dual-port fibre channel adapters.

考题 A customer has Symantec NetBackup installed and is concerned about restore times for a line ofbusiness server. Which IBM Tivoli Storage Manager feature addresses this customer’s concerns?()A、migrationB、collocationC、compressionD、subfile backup

考题 单选题An IBM XIV system with nine modules and 2 TB disks is being proposed to a customer who needs to increase disk capacity in the data center. The customer is concerned about data growth andcost after the initial purchase. Which of the following factors of the solution should be stressed to the customer to address data growth?()A the XIV system can be scaled by the addition of modulesB XIV offers thin provisioning for all available host operating systemsC reduced operating costs will pay for another XIV system in less than two yearsD the management GUI allows the administrator tovirtualize the entire storage system quickly

考题 单选题A customer has budget sign-off to purchase a new p5-550 2-way server to replace their aging 2-way 7025-6F0. They like the advantages of the Simultaneous Multi Processing (SMT) ability of this server.  Their application is certified at AIX 5.2 and is scheduled for AIX 5.3 certification in six months. The Chief Information Officer is concerned that they will lose the budget if they do not purchase the server this fiscal year.  What is the most relevant and cost-effective advice the pSeries technical specialist can offer?()A Purchase a 4-way p630 to compensate for not using SMT.B Purchase the p5-550 server and install AIX 5.2, which can be upgraded to AIX 5.3 later.C Purchase the p5-550 server and install AIX 5.2 and enable SMT.D Suspend the purchase of a new machine at this time and upgrade the current server to a 4-way server.

考题 单选题Company.com has a two-way p5-520 that will be running three shared processor Micro-Partitions consuming 60 percent of system resources. Immediately prior to shipment, the customer discovered they need to run a fourth server that requires AIX 5L V5.2. Which of the following will satisfy this requirement?()A Change to a 4-way p5-550B Use Capacity on DemandC Configure a fourth logical partitionD Add memory to the configuration

考题 单选题A customer is consolidating seven IBM i partitions onto a POWER7 system, using VIO Server to virtualize resources.Which of the following PowerVM editions is appropriate for this customer?()A IBM i EditionB Express EditionC Standard EditionD Enterprise Edition

考题 单选题A customer has Symantec NetBackup installed and is concerned about restore times for a line ofbusiness server. Which IBM Tivoli Storage Manager feature addresses this customer’s concerns?()A migrationB collocationC compressionD subfile backup

考题 单选题A customer has a requirement for a single AIX LPAR to be highly available. The customer only has enough funding to purchase a single system. Which would be the most critical option to mitigate AIX availability?()A Dual power supplies.B Twice the amount of disk.C Two dual-port LHEA adapters.D Two dual-port fibre channel adapters.

考题 单选题A proposed server architecture includes SAN LUNs being presented to client LPARs using shared HBAs to reduce infrastructure cost. The customer requires minimal management efforts for the dual VIO Servers.   Which technology is recommended for this proposal?()A NPIVB vSCSIC Arbitrated loopD Converged adapter

考题 单选题Company.com has purchased a 2-way p5-520 and would like to create three Micro-Partitions on the server. Which feature of Advanced POWER Virtualization would allow them to create the desired number of partitions?()A Virtual EthernetB Shared Ethernet AdapterC Dedicated ProcessorsD Shared Processor Pool

考题 单选题A customer has a requirement to eliminate single points of failure for an application.  They have allocated one Ethernet adapter to each VIO server on the system. Which features of PowerVM and AIX will support the customer requirement?()A Etherchannel and trunkingB Network Interface Backup and EtherchannelC Shared Ethernet Adapter (SEA) Failover and EtherchannelD Network Interface Backup and Shared Ethernet Adapter failover

考题 单选题A customer has requested a proposal for a p5-520 with AIX 5.2 and Sysback.  There are no plans to run LPARs or Micro-Partitions on the p5-520 in the near future.  The customer has asked the pSeries technical specialist to recommend anything else that may be needed.  Which of the following should be recommended in this situation?()A HMCB DVD-ROMC Tape driveD Network switch

考题 单选题The customer requests a proposal for three high-availability 4-socket servers with the capability to connect to their existing DS4000 storage server. The customer will make the decision based on the lowest initial purchase price.  Which of the following IBM System x solutions would be the most competitive?()A x3950B x3850C x3650D LS41

考题 单选题Companycom is currently using a p690 and has just ordered a p5 590. They prefer to run in full system partition mode, since their application will utilize all the resources in the machine, and they don't want the overhead of an LPAR. What is the best response to the customer about the POWER5 capabilities?()A POWER5 runs in an SMP mode as defaultB POWER5 can run in a full system mode the same as the p690C POWER5 can run in full system mode with the purchase of PLMD POWER5 can run in a full system mode, but it is in LPAR mode

考题 单选题A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system.  How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()A  Install a VIO server as an additional partition and DLPAR the resources from the existing partition to the VIO server.B  Create a service partition and install a VIO server. This will automatically move resources to the VIO server on reboot of the managed system.C  Delete all the existing LPARs, create a new LPAR and assign all the system resources to this LPAR and then install the VIO server on this LPAR.D  Reset the machine to Manufacturing Default Configuration and install the VIO server on the resulting partition created, which will own all system resources.

考题 单选题Companycom has just purchased a p5 570 with AIX 5.3. The customer would like to add a training LPAR to the system, but no processors are available. All of the partitions are using dedicated resources. The test LPAR is using one processor and has a 90% CPU idle rate. What can be done to setup this training LPAR quickly without disabling their current environment?()A Use AIX 5.3 which supports micro-partitioning for both the test and training LPARSB Use DLPAR to move resources from the test LPAR to training when training is activeC Install Partition Load Manager to share resources between the test and training environmentsD Install Advanced Power Virtualization and then use micro-partitioning for both the test and training LPARs

考题 单选题Company.com  with limited AIX skills has purchased a p5-520 2-way which will run Micro-Partitions. To reduce the initial cost of purchase, the customer will be sharing the system resources using a VIO server. The customer is concerned about managing the installation of the operating system. Which of the following should the customer perform?()A Use alt_disk_install to install AIX on all logical partitions.B Configure the DVD as a desired resource on all partitions.C Configure all resources as shared resources between all partitions.D Create a separate NIM server to manage the installation of all partitions.