网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
A Customer has a functional server deployment solution that uses a combination of disk imaging and application pushing technology. They need to get a working Windows 2003 image for their new servers as soon as possible. What method can achieve this?()
A

Install Windows 2003 using the F6 supply Mass Storage Controller option

B

Replace Customer’s deployment solution with Tivoli Provisioning Manager for OS Deployment Director Edition

C

Deploy Customer’s existing image and use UXSPi to update IBM specific drivers

D

Use ServerGuide to install Windows 2003


参考答案

参考解析
解析: 暂无解析
更多 “单选题A Customer has a functional server deployment solution that uses a combination of disk imaging and application pushing technology. They need to get a working Windows 2003 image for their new servers as soon as possible. What method can achieve this?()A Install Windows 2003 using the F6 supply Mass Storage Controller optionB Replace Customer’s deployment solution with Tivoli Provisioning Manager for OS Deployment Director EditionC Deploy Customer’s existing image and use UXSPi to update IBM specific driversD Use ServerGuide to install Windows 2003” 相关考题
考题 A customer has a very large number of physical Windows-based servers and no centralized storage. Which technology solution will help the customer to reduce the footprint of their existing server estate?()A. z/OS, DS8000, TSMB. TSM, LTO-5, VMwareC. System x, VMware, XIVD. System p, VMware, DS5000

考题 An SMB customer requires a tower server with 2TB of internal storage. The customer has requested a low cost solution.  What IBM System x server would satisfy this criteria?()A、x3250B、x3200C、x3650D、x3400

考题 A customer wants to deploy the Cisco Business Ready Teleworker solution, but is currently using a traditional (non-IP) PBX for voice services. What would you recommend to this customer?()A、Deployment of Business Ready Teleworker with VoIP is not recommended.B、The customer’s existing PBX must first be replaced with Cisco IP Telephony solution.C、Business Ready Teleworker and Cisco IP Telephony can be deployed in parallel to the existing PBX, integrating the two with trunking.D、Deployment is recommended only for full-time Teleworkers who have no other corporate phone.

考题 Computers on a small network are not able to receive new addresses from the DHCP server. However, the administrator has checked the server and ensured it is connected, responding, and functional. Which of the following is the MOST likely problem in this scenario?()A、The DHCP server has an incorrect gateway configured.B、The DHCP server was incorrectly configured with a six hour lease time on addresses.C、The DHCP server was incorrectly configured with no-expiring lease time on addresses.D、The DNS server is no longer functional and internal name-address resolution is down.

考题 During consultation, you find that a customer has only a single asset closet and is looking for a solution that is easy to deploy. Which NAS physical deployment model would you suggest to this customer?()A、edgeB、centralC、Layer2D、Layer3

考题 A customer has just purchased six x346 servers running Windows 2003 Web Edition.They are expecting to add six additional x346’s in three months.They have a requirement to automatically deploy the current server image upon the new servers. What TWO actions are required to complete this task?()A、Ensure Director Agent is installed on the new servers.B、Ensure a DHCP Sever is installed and configured in the environment.C、Ensure Server Plus Pack option has been installed and configured.D、Ensure Software Distribution has been installed on the IBM Director Server and an image has been created.E、Ensure Remote Deployment Manager has been installed on the IBM Director Server and an image has been created.

考题 A customer has a very large number of physical Windows-based servers and no centralized storage. Which technology solution will help the customer to reduce the footprint of their existing server estate?()A、z/OS, DS8000, TSMB、TSM, LTO-5, VMwareC、System x, VMware, XIVD、System p, VMware, DS5000

考题 A customer is interested in a power efficient server solution. The Sales Specialist has recommended a BladeCenter solution. The customer debates the price is high compared to rack servers.  Which of the following should the Sales Specialist emphasize to address the pricing difference?()A、Higher rack density that reduces data center footprintsB、Internal upgrades that only IBM can offerC、Total Cost of Ownership (TCO) related to innovative components such as Integrated Switches D、The Rear Door Heat eXchanger that only IBM can offer

考题 A solution provider has proposed a pSeries solution to a new customer.  The solution is complex with a number of technologies that are new to the customer. They have a tight timeline for implementation.  The solution provider has not been able to get a clear understanding as to how the customer will backup the system.  What would be the most appropriate action to address the risks with this solution?()A、Sell SysbackB、Conduct a SARC、Sell SupportlineD、Provide a project timeline

考题 A customer has been working with your company to purchase an iDataPlex cluster. They have a configuration from IBM and are getting ready to place an order. Which should be done of the following?()A、A solution sizing questionnaireB、Verify the customer has the proper racksC、A Technical Delivery AssessmentD、Verify the customer has enough cooling in the computer room

考题 A customer has asked the System x Sales Specialist to provide a solution that meets the following requirements:   -- 4U rack-dense server   -- 4 quad-core processors  -- 32 GB of memory   -- 4 Internal SAS hard drives with RAID 5 support   -- Redundant Power Supplies  -- 7 PCI-E slots available   A competitor presented the customer with a solution comparable to a Dell PowerEdge 4-socket server.  Which of the following should the System x Sales Specialist present as an advantage over the competitor’s solution? ()A、x3255B、x3655C、x3755D、x3850 M2

考题 A customer is installing a new x3850 X5 server and has purchased a warranty upgrade on the server to 24 x 7 four hour response. The customer requested IBM help with setting up the RAID adapter. The customer was told IBM would not help them. Which of the following should be verified first?()A、The customer used their IBM Customer NumberB、The customer has activated their base warrantyC、The customer purchased Remote Technical Support ServicepacD、The customer escalated the issue to the Duty Manager

考题 A medium-sized company with 500 employees has a rapidly growing storage infrastructure with clustered mail, database, and file and print core business applications running on six servers.  Using current direct attached SCSI storage pools to each server leads to inefficient utilization of storage space.They also have a backup device attached to each server.  They want to consolidate their storage and backup infrastructure into a scalable, high availability and high performance solution.  The customer’s top priorities are performance, cost, and availability.   Which of the following backup solutions best satisfies the customer requirements?()A、A DS4000 SAN with flash copy enabled for volume mirroringB、An iSCSI solution with dedicated backup server with SCSI attached tape libraryC、A NAS solution with SCSI direct attached tape library with dedicated backup networkD、A DS4000 SAN with fibre channel attached tape library solution with dedicated backup zone

考题 Companycom has plans to deploy a large database solution. Their primary requirement is minimal user access downtime. They are comparing a single server implementation with a two server deployment. What solution would they use to avoid downtime for OS software maintenance?()A、Apply OS updates once a yearB、Utilize a GPFS cluster solutionC、Implement a two server deployment with HACMPD、Install a single server implementation with HACMP failover to a second LPAR

考题 A solution provider has identified a number of risks with a configuration in a customer’s request for bid.  What is the most appropriate action to take to mitigate those risks for the customer?()A、Decide not to bid.B、Provide a solution in the bid.C、Provide a disclaimer in the bid.D、Discuss options with the customer.

考题 A customer has a development environment that uses the auto-deployment feature. The customer  claims the application is not redeployed even if the new version is copied to an application  subdirectory. Which two parameters of the configuration should you check?()A、Check if archive file in the compressed version has a new REDEPLOY file.  B、If server was started in the Development Mode. Auto-deployment is not supported in production  mode.  C、If the application includes an EJB 3 module. Auto-deployment is not supported for EJBs.D、You change JVM from HotSpot to JRockit. Auto-deployment is not supported in HotSpot auto  deployment.  E、If the domain is a single-server domain. Auto-deployment is not supported in multiserver  domains.

考题 单选题An SMB customer requires a tower server with 2TB of internal storage. The customer has requested a low cost solution.  What IBM System x server would satisfy this criteria?()A x3250B x3200C x3650D x3400

考题 多选题A customer has a development environment that uses the auto-deployment feature. The customer  claims the application is not redeployed even if the new version is copied to an application  subdirectory. Which two parameters of the configuration should you check?()ACheck if archive file in the compressed version has a new REDEPLOY file.BIf server was started in the Development Mode. Auto-deployment is not supported in production  mode.CIf the application includes an EJB 3 module. Auto-deployment is not supported for EJBs.DYou change JVM from HotSpot to JRockit. Auto-deployment is not supported in HotSpot auto  deployment.EIf the domain is a single-server domain. Auto-deployment is not supported in multiserver  domains.

考题 单选题Upon announcement,the specific details surrounding the Virtual I/O Server requirements and performance are still being defined.  The customer has engaged IBM to provide a server consolidation solution and would like to take advantage of the VIO Server benefits. How should the pSeries technical specialist best address this?()A Design the solution and present it confidently so the customer does not question it.B Design the solution and ensure the customer understands the unknowns with the new technology.C Explain to the customer that the VIO Server does not benefit them when doing server consolidation so it has not been configured.D Explain to the customer that the details surrounding the VIO Server have not been clearly defined so designing a solution is premature.

考题 单选题A Customer has a proprietary server deployment solution that uses a combination of disk imaging and application pushing technology. They need to get a working Windows 2003 image for their new servers as soon as possible for deployment with their provisioning system. Which of the following methods can achieve this?()A UseServerGuide to install Windows 2003rchase PowerVM Standard Edition for the entire systemB Install Windows 2003 using the F6 supply Mass Storage Controller optionC Replace Customer’s deployment solution with Tivoli Provisioning Manager for OS Deployment Director EditionD Deploy Customer’s existing image and useUXSPi to update IBM specific drivers

考题 单选题During consultation, you find that a customer has only a single asset closet and is looking for a solution that is easy to deploy. Which NAS physical deployment model would you suggest to this customer?()A edgeB centralC Layer2D Layer3

考题 单选题A customer has been working with your company to purchase an iDataPlex cluster. They have a configuration from IBM and are getting ready to place an order. Which should be done of the following?()A A solution sizing questionnaireB Verify the customer has the proper racksC A Technical Delivery AssessmentD Verify the customer has enough cooling in the computer room

考题 单选题A Customer has a proprietary server deployment solution that uses a combination of disk imaging and application pushing technology.  They need to get a working Windows 2003 image for their new servers as soon as possible for deployment with their provisioning system. Which of the following methods can achieve this? ()A Install Windows 2003 using the F6 supply Mass Storage Controller option B Replace Customers deployment solution with Tivoli Provisioning Manager for OS Deployment Director Edition C Use ServerGuide to install Windows 2003 D Deploy Customers existing image and use UXSPi to update IBM specific drivers 

考题 单选题You need to recommend an automated deployment solution for the new servers in the finance department.   What should you include in the recommendation?()A Microsoft Hyper-V Server 2008 R2B Microsoft System Center Virtual Machine Manager (VMM)C Windows Deployment Services (WDS)D Windows Server Migration Tools

考题 单选题A customer has a requirement for a storage solution that meets the following criteria:       (1)Heterogeneous hosts attached       (2)Support for block I/O       (3)High Speed       (4)Scalable  Which solution would satisfy the customer’s requirement?()A SANB NASC SCSID iSCSI

考题 单选题What is the correct stage in the sales process for a Pre-Sales Technical  Delivery Assessment (TDA)? ()A Before the first solution design meeting with the customerB After the solution design proposal is submitted to manufacturing for reviewC Once the customer has supplied the solution design specifications to the sales teamD After the solution design is completed and before the proposal is submitted to the customer

考题 单选题A customer has recently purchased some IBM x445 servers running Red Hat Enterprise AS 3 and wants to connect them to their existing EMC Clarion SAN controller.  Which of the following steps must be taken in order to validate the solution?()A Download the latest drivers from EMC for Red Hat Advanced Server.B Ensure that the EMC storage server is configured properly and has the latest firmware levels.C Verify the equipment is on the ServerProven list and complete a Solution Assurance Review (SAR).D Ensure that the systems are connected to the EMC SAN controller.