180 A summary WBS is usually developed in the
A. Conceptual phase
B. implementation phase
C. planning phase
D. close-out phase
E. All of the above phases
参考答案
更多 “ 180 A summary WBS is usually developed in theA. Conceptual phaseB. implementation phaseC. planning phaseD. close-out phaseE. All of the above phases ” 相关考题
考题
A summary WBS is usually developed in theAConceptual phaseBimplementation phaseCplanning phaseDclose-out phaseEAll of the above phases
考题
Project life cycles provide a better means of measurement of progress and control. The four phases of a project are conceptual development, _____, _____, and _____.APreliminary planning, detail planning, closeoutBImplementation, reporting, terminationCDevelopment, implementation, terminationDExecution, reporting, finishingEImplementation, termination, post-audit review
考题
The project life-cycle can be described as:A.project concept, project planning, project execution, and project close-out.B.project planning, work authorization, and project reporting.C.project planning, project control, project definition, WBS development, and project termination.D.project concept, project execution, and project reporting.E.All of the above.
考题
Project management/project planning is most closely aligned with:A.Long range/strategic planning ( years or more).B.Intermediate range planning ( to years)C.Short range/tactical planning ( year or less).D.All of the above.E.B and C.
考题
Network schedules are prepared during the _____ phase and updated during the _____ phase.A.Conceptual, execution.B.Development, implementation.C.Development, close-out.D.Implementation, close-out.E.Planning, finishing.
考题
Response Planning is the responsibility of the functional areas and considersA mitigation.B deflection.C contingency planning.D unforeseen occurrences.E All of the above.
考题
A contract originated bilaterally may be developed by _____ .A quotation request from suppliersB proposal requestC bid invitation releaseD B and CE All of the above.
考题
121 Project management/project planning is most closely aligned with:A. Long range/strategic planning (5 years or more).B. Intermediate range planning (1 to 5 years)C. Short range/tactical planning (1 year or less).D. All of the above.E. B and C
考题
92 The main player in project communication is theA. sponsorB. project managerC. functional managerD. functional teamE. All of the above
考题
148 Network schedules are prepared during the _____ phase and updated during the _____ phase. A. Conceptual, execution.B. Development, implementation.C. Development, close-out.D. Implementation, close-out.E. Planning, finishing
考题
167 The project life-cycle can be described as:A. project concept, project planning, project execution, and project close-out.B. project planning, work authorization, and project reporting.C. project planning, project control, project definition, WBS development, and project termination. D. project concept, project execution, and project reporting.E. All of the above
考题
92 Project life cycles provide a better means of measurement of progress and control. The four phases of a project are conceptual development, _____, _____, and _____.A. Preliminary planning, detail planning, closeoutB. Implementation, reporting, terminationC. Development, implementation, terminationD. Execution, reporting, finishingE. Implementation, termination, post-audit review
考题
93 Response Planning is the responsibility of the functional areas and considersA. mitigation.B. deflection.C. contingency planning.D. unforeseen occurrences.E. All of the above
考题
94 The definitive terms of a contract are written during which of the following contract phases? A. Contract PhaseB. Post-Award PhaseC. Award PhaseD. Pre-Award PhaseE. Requirement Phase
考题
183 Configuration (baseline) control monitors performance against theA. scope baselineB. original scheduleC. original budgetD. All of the above.E. None of the above
考题
88 Typically, during which phase in a project life cycle are most of the project expenses incurred. A. Concept phaseB. Development of design phaseC. Execution phase.D. Termination phase.E. None of the above
考题
62 A summary WBS is usually developed in theA. Conceptual phaseB. implementation phaseC. planning phaseD. close-out phaseE. All of the above phases
考题
● A summary WBS is usually developed in theA Conceptual phaseB implementation phaseC planning phaseD close-out phaseE All of the above phases
考题
● Project life cycles provide a better means of measurement of progress and control. The four phases of a project are conceptual development, _____, _____, and _____.A Preliminary planning, detail planning, closeoutB Implementation, reporting, terminationC Development, implementation, terminationD Execution, reporting, finishingE Implementation, termination, post-audit review
考题
● Which of the following planning considerations is often overlooked?A Planning for project termination.B Qualified project manager assignment.C Insuring top management support.D Clearly defined tasks.E All of the above.
考题
● Many of the activities performed during the preliminary investigation are still being conducted in (71) , but in much greater depth than before. During this phase, the analyst must become fully aware of the (72) and must develop enough knowledge about the (73) and the existing systems to enable an effective solution to be proposed and implemented. Besides the (74) for process and data of current system, the deliverable from this phase also includes the (75) for the proposed system.(71)A. analysis phaseB. design phaseC. implementation phaseD. maintenance phase(72)A. main symptomB. root problemC. final blueprintD. data specification(73)A. hardware environmentB. testing environmentC. software environmentD. business environment(74)A. logical modelsB. physical modelsC. design modelsD. implementation models(75)A. hardware and software specificationB. system performance specificationC. formal requirements definitionD. general problem statement
考题
The project life-cycle can be described as(72). A.project concept,project plannin9,project execution,and project close-out B.project planning,work authorization,and project reporting C.project planning,project control,project definition,WBS development,and project termination D.project concept,project execution,and project reporting
考题
●The traditional model for systems development was that an IT department used (71)which is a process-centered technique, and consulted users only when their input or approval was needed. Compared with traditional methods, many companies find that JAD allows key users to participate effectivelyin the (72). When properly used, JAD can result in a more accurate statement of system requirements, a better understanding of common goals and a stronger commitment to the success of the new system. RAD is a team-based technique that speeds up information systems development and produces a functiog.information system. Whilethe end productof jAD is a(an)(73),theendproduct of RAD is the (74) .The RAD model consists offour phases. During the(75),users interact with systems analysts and develop models and prototypes that represent all system processes, outputs, and inputs.(71) A. structured analysisB. object-oriented analysisC. prototype analysisD. process analysis(72) A. initial scope definitionB. requirements modeling processC. object modeling processD. architecture design process(73) A. data flow diagramB. entity relationstip modelC. requirements modelD. object model(74) A. system proposalB. system design modelC. new system architectureD. new information system(75) A. requirements planning phaseB. user design phaseC. construction phaseD. cutover phase
考题
Many of the activities performed during the preliminary investigation are still being conducted in(1), but in much greater depth than before. During this phase, the analyst must become fully aware of the ( )and must develop enough knowledge about the ( ) and the existing systems to enable an effective solution to be proposed and implemented. Besides the ( )for process and data of current system, the deliverable from this phase also includes the ( )for the proposed system.
(1)处应选( )。
A. analysis phase
B. D.esign phase
C. implementation phase
D.. maintenance phase
考题
There are six phases of the Cisco Lifecycle Services framework. In which of the following phases would a proposal be developed and delivered?()A、PrepareB、OperateC、PlanD、Design
考题
Which of these is an accurate list of Cisco Lifecycle Services phases? Select exactly 1 answer(s) from the following:()。A、initiation planning analysis design development implementation operations and maintenanceB、project planning, site assessment risk assessment solution selection and acquisition, testing, and operationsC、prepare, plan, design, implement operate, and optimizeD、analysis, design, deployment testing, implementation, and productionE、presales, project planning, development implementation, operations testing, and operations sign- off
考题
单选题Which of these is an accurate list of Cisco Lifecycle Services phases? Select exactly 1 answer(s) from the following:()。A
initiation planning analysis design development implementation operations and maintenanceB
project planning, site assessment risk assessment solution selection and acquisition, testing, and operationsC
prepare, plan, design, implement operate, and optimizeD
analysis, design, deployment testing, implementation, and productionE
presales, project planning, development implementation, operations testing, and operations sign- off