网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
Many of the activities performed during the preliminary investigation are still being conducted in(1), but in much greater depth than before. During this phase, the analyst must become fully aware of the ( )and must develop enough knowledge about the ( ) and the existing systems to enable an effective solution to be proposed and implemented. Besides the ( )for process and data of current system, the deliverable from this phase also includes the ( )for the proposed system.

(1)处应选( )。



A. analysis phase
B. D.esign phase
C. implementation phase
D.. maintenance phase

参考答案

参考解析
解析:本题考查的是初步调研的相关知识,这个考点可以做个了解。经常考

初步调研阶段的许多活动在分析阶段仍然要继续,而且会比以前更深入许多。在分析阶段,分析师必须要完全清楚最终蓝图并且掌握充分的业务环境和目前系统的商业环境,以使一个有效的解决方案被提出并且执行。除了当前系统的过程和数据的逻辑模型,这一阶段的产出物还包括建议系统的正式需求定义。

71、A、分析阶段,B、设计阶段,C、执行阶段,D、维护阶段
更多 “Many of the activities performed during the preliminary investigation are still being conducted in(1), but in much greater depth than before. During this phase, the analyst must become fully aware of the ( )and must develop enough knowledge about the ( ) and the existing systems to enable an effective solution to be proposed and implemented. Besides the ( )for process and data of current system, the deliverable from this phase also includes the ( )for the proposed system. (1)处应选( )。 A. analysis phase B. D.esign phase C. implementation phase D.. maintenance phase ” 相关考题
考题 ● Many of the activities performed during the preliminary investigation are still being conducted in (71) , but in much greater depth than before. During this phase, the analyst must become fully aware of the (72) and must develop enough knowledge about the (73) and the existing systems to enable an effective solution to be proposed and implemented. Besides the (74) for process and data of current system, the deliverable from this phase also includes the (75) for the proposed system.(71)A. analysis phaseB. design phaseC. implementation phaseD. maintenance phase(72)A. main symptomB. root problemC. final blueprintD. data specification(73)A. hardware environmentB. testing environmentC. software environmentD. business environment(74)A. logical modelsB. physical modelsC. design modelsD. implementation models(75)A. hardware and software specificationB. system performance specificationC. formal requirements definitionD. general problem statement

考题 Many of the activities performed during the preliminary investigation are still being conducted in(71) , but in much greater depth than before. During this phase, the analyst must become fully aware of the(72) and must develop enough knowledge about the(73) and the existing systems to enable an effective solution to be proposed and implemented. Besides the(74) for process and data of current system, the deliverable from this phase also includes the(75) for the proposed system.A.analysis phaseB.design phaseC.implementation phaseD.maintenance phase

考题 During inflationary periods, the use of the LIFO method of costing inventory will result in a greater amount of net income than would result from the use of the FIFO method.()

考题 After an IOPP Certificate is issued to an inspected vessel,how many other surveys of the vessel's pollution prevention equipment are conducted during the period of validity of the certificate?A.NoneB.OneC.TwoD.Three

考题 In using Loran-C,skywave reception gives greater range but is ______.A.only accurate during daylight hoursB.much less accurateC.only accurate at twilightD.more accurate than using ground waves

考题 Many of the activities performed during the preliminary investigation are still being conducted in( ), but in much greater depth than before. During this phase, the analyst must become fully aware of the ( )and must develop enough knowledge about the ( ) and the existing systems to enable an effective solution to be proposed and implemented. Besides the ( )for process and data of current system, the deliverable from this phase also includes the (5)for the proposed system. (5)应选( )。 A. hardware and software specification B. system performance specification C. formal requirements definition D. general problem statement

考题 Many of the activities performed during the preliminary investigation are still being conducted in( ), but in much greater depth than before. During this phase, the analyst must become fully aware of the ( )and must develop enough knowledge about the ( ) and the existing systems to enable an effective solution to be proposed and implemented. Besides the (4)for process and data of current system, the deliverable from this phase also includes the ( )for the proposed system. (4)应选( )。 A. logical moD.els B. physical moD.els C. D.esign moD.els D.. implementation moD.els

考题 During the systems planning phase. a systems analyst conducts a( )activity to study the systems request and recommend specific action. After obtaining an authonzation to proceed. the analyst interacts with(请作答此空) to gather facts about the problem of opportunity, project scope and constraints, project benefits, and estimated development time and costs. In many cases. thesystems request does not reveal the underying problem, but only a symptom. A popular technique for investigating causesand effects is called ( )The analyst has analyzed the problem or opportunity. defined the project scope and constraints, and performed ( )to evaluate project usability, costs, benefits, and time constraints. The end product of the activity is ( ) .The main content must include an estimate of time .staffing requrements, costs, benefits, and expected results for the next phase of the SDLCA.system users B.system owner C.managers anD.users D.business analysts

考题 Many of the activities performed during the preliminary investigation are still being conducted in ____, but in much greater depth than before.A.analysis phase B.design phase C.implementation phase D.maintenance phase

考题 During this phase, the analyst must become fully aware of the __请作答该选项__ and must develop enough knowledge about the ____ and the existing systems to enable an effective solution to be proposed and implementeD.A.main symptom B.root problem C.final blueprint D.datA.specification

考题 During the systems planning phase. a systems analyst conducts a(请作答此空)activity to study the systems request and recommend specific action. After obtaining an authonzation to proceed. the analyst interacts with( ) to gather facts about the problem of opportunity, project scope and constraints, project benefits, and estimated development time and costs. In many cases. thesystems request does not reveal the underying problem, but only a symptom. A popular technique for investigating causesand effects is called ( )The analyst has analyzed the problem or opportunity. defined the project scope and constraints, and performed ( )to evaluate project usability, costs, benefits, and time constraints. The end product of the activity is ( ) .The main content must include an estimate of time .staffing requrements, costs, benefits, and expected results for the next phase of the SDLCA.case study B.requirements discovery C.preliminary investigation D.business understanding

考题 The purpose of the systems analysis phase is to build a logical model of the new system.The first step is(71),where you investigate business processes and document what the new system must do to satisfy users. This step continues the investigation that began during the(72). You use the fact-finding results to build business models,data and process models,and object models. The deliverable for the systems analysis phase is the(73),which describes management and user requirements,costs and benefits,and outlines alternative development strategies.The purpose of the systems design phase is to create a physical model that will satisfy all documented requirements for the system. During the systems design phase,you need to determine the(74),which programmers will use to transform the logical design into program modules and code. The deliverable for this phase is the(75),which is presented to management and users for review and approval.A.system charter B.system scope definition C.system blueprint D.system requirements document

考题 During this phase, the analyst must become fully aware of the ____ and must develop enough knowledge about the __请作答该选项__ and the existing systems to enable an effective solution to be proposed and implementeD.A.hardware environment B.testing environment C.software environment D.business environment

考题 During this phase,the analyst must must develop enough knowledge about the ( )and the existing systems to enable an effective solution to be proposed and implemented. A.hardware environment B.testing environment C.software environment D.business environment

考题 Many of the activities performed during the preliminary investigation are still being conducted in ( ), but in much greater depth than before. A.analysis phase B.design phase C.implementation phase D.maintenance phase

考题 During this phase,the analyst must become fully aware of the ( )。 A.main symptom B.root problem C.final blueprint D.datA.specification

考题 Which two service components are performed during the wireless implement phase?()A、project planningB、configuration managementC、wireless readiness assessmentD、systems acceptance testingE、site readiness specification

考题 During which boot phase is the rootvg first activated()A、Phase 1B、Phase 2C、Phase 3D、POST Phase

考题 You work in a company which is named Wiikigo Corp. The company uses SQL Server 2008. You are the administrator of the company database. Now you are in charge of a SQL Server 2008 instance. There is a database named DB1 in the instance. At present about 90 GB of data is stored in DB1. You made some rough calculations that every day about 1 GB of data is modified or inserted. You set the recovery model of DB1 to Simple. According to the company requirements, during business hours, data loss of more than 120 minutes worth of transactions is unacceptable. You have to choose a backup strategy which must comply with the following two requirements: Using as little disk space as possible Complying with the company requirements. So what action should you perform to achieve this goal?()  A、A full database backup should be performed once daily. During business hour, a transaction log backup should be performed every two hours. B、A full database backup should be performed once daily C、A full database backup should be performed once daily. During business hours, a differential backup should be performed every two hours D、Perform a full database backup should be performed once every week. A differential backup should be performed once daily. During business hours a transaction log backup should be performed every two hours.

考题 单选题The purpose of a preventer as it is used on a conventional yard and stay cargo rig is to().A allow greater than normal loads to be handled by the gearB act as an inboard guy in the event the inboard guy parts during cargo handlingC assist the outboard guy in supporting stresses during cargo handlingD prevent the inboard guy from parting due to stresses during cargo handling

考题 单选题During the winter months,the southeast trade winds are().A stronger than during the summer monthsB weaker than during the summer monthsC drier than during the summer monthsD wetter than during the summer months

考题 多选题Which two service components are performed during the wireless implement phase?()Aproject planningBconfiguration managementCwireless readiness assessmentDsystems acceptance testingEsite readiness specification

考题 单选题Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the (2) and must develop enough knowledge about the (3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system. 空白(1)处填()A analysis phaseB designphaseC implementationphaseD maintenancephase

考题 单选题Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the(2)and must develop enough knowledge about the(3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system.A hardware and software specificationB system performance specificationC formal requirements definitionD general problem statement

考题 单选题Hydraulic cranes must be properly warmed-up before being operated because ().A warm-up allows the hydraulic system to become charged with oilB warm-up allows the relief valves to be properly testedC hydraulic strainers operate only during the warm-up periodD hydraulic fluid must be at the proper viscosity

考题 单选题After an IOPP Certificate is issued to an inspected vessel,how many other surveys of the vessel’s pollution prevention equipment are conducted during the period of validity of the certificate?()A NoneB OneC TwoD Three

考题 单选题Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the(2)and must develop enough knowledge about the(3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system.A logical modelsB physical modelsC design modelsD implementation models