网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

Chain nervous system


参考答案

更多 “Chain nervous system” 相关考题
考题 The functions of Minerals don’t include ( ). A、Regulating water balance in the bodyB、Participating in functions of nervous system.C、Comprising the skeletal system.D、Providing energy for cellular reactions.

考题 Dr Frisoni attributed the patients' changing music taste to[A] man's desire to seek novel experience.[B] the damage to the left part of the brain.[C] the shift of predominance from the right lobe to the left.[D] the weakening of some part of the nervous system.

考题 It should ____ that franchising is one of the means available for getting investment money without giving up control of the chain operation and building a distribution system for servicing it. A recognize ;B be recognizing ;C be recognized

考题 Neurons that conduct impulses from the central nervous system to muscles or glands are referred to as()。 A、afferentB、associationC、voluntaryD、efferentE、sensory

考题 中枢神经系统(central nervous system,CNS)感染以()最多见。 A、脑炎B、颅内脓肿C、细菌性脑膜炎D、椎管内感染

考题 A chain stripper is used to ______.A.prevent chain from clinging to the wildcatB.clean the marine debris from the chainC.flake chain from a boat's chain lockerD.clean chain prior to an x-ray inspection

考题 What are the two main types of stud link chain ________.A.Oil Rig chain and Oil Field Stud Link chainB.Flash-butt welded chain and Di-Lok chainC.Flash-butt welded chain and Oil Rig chainD.Oil Field Stud Link chain and Flash-butt welded chain

考题 Given the same water depth and line tension, the holding power of a 19 pound / foot wire rope mooring system in comparison to the holding power of a 90 pound / foot chain mooring system will be ______.A.weakerB.equalC.greaterD.Indeterminable

考题 In a combination chain and wire rope mooring system, the anchor chain is deployed at the anchor end of the line to ______.A.increase fatigue life of the systemB.reduce the time to retrieve the lineC.increase the holding powerD.reduce the catenary

考题 This hypothesis states that environments that are too clean may actually make the __ system develop oversensitive responses.A. mental B. nervous C. immune D. physical

考题 In anchor orders, “Up and down” means “()”.A、The chain is not uprightB、The chain is uprightC、The chain is slackD、The chain is not slack

考题 Where is()(制链器螺杆)?A、compressor barB、chain linkC、chain stopperD、chain locker

考题 Which two statements are true about a job chain?()A、 A job chain can contain a nested chain of jobsB、 The jobs in a job chain cannot have more than one dependencyC、 A job of the CHAIN type can be run using event-based or time-based schedulesD、 The jobs in a job chain can be executed only by using the events generated by the Scheduler

考题 使机长和副驾驶的操纵杆分离的是()A、一个扭力管B、推杆C、A Breakout MechanismD、A Chain andSprocket System

考题 单选题A permanent chain chasing system is used to().A clean anchor chain as it's hauled inB recover anchors which have lost their buoysC run and retrieve anchorsD prepare anchor chain for inspection

考题 单选题The machinery associated with heaving in and running out anchor chain is the().A winchB windlassC draw worksD dynamic pay out system

考题 单选题In anchoring orders, up and down means().A the chain is not uprightB the chain is tightC the chain is uprightD the chain is slack

考题 单选题What is the primary disadvantage of a permanent chain chaser system?()A It requires anchor handling boats with more horsepowerB Chain chasers work in shallow water onlyC Chain chasers will not work with piggyback anchorsD It takes longer to deploy anchors using chain chasers

考题 单选题What are the two main types of stud link chain().A Oil Rig chain and Oil Field Stud Link chainB Flash-butt welded chain and Di-Lok chainC Flash-butt welded chain and Oil Rig chainD Oil Field Stud Link chain and Flash-butt welded chain

考题 单选题An effective braking system for windlasses on rigs in deep water is a(n)().A larger chain stopperB disc backstopping brakeC hydraulic clutchD electrical regenerative braking system

考题 单选题In a combination chain and wire rope mooring system,the anchor chain is deployed at the anchor end of the line to().A increase fatigue life of the systemB reduce the time to retrieve the lineC increase the holding powerD reduce the catenary

考题 单选题A chain stripper is used to().A prevent chain from clinging to the wildcatB clean the marine debris from the chainC flake chain from a boat's chain lockerD clean chain prior to an x-ray inspection

考题 名词解释题autonomic nervous system

考题 多选题Which two statements are true about a job chain?()AA job chain can contain a nested chain of jobsBThe jobs in a job chain cannot have more than one dependencyCA job of the CHAIN type can be run using event-based or time-based schedulesDThe jobs in a job chain can be executed only by using the events generated by the Scheduler

考题 单选题The most doubtful and unpredictable factor in a mooring system is the().A ability of the anchors to hold in a seabedB anchor chain catenary lengthC variability of the fairleadD angle of the flukes

考题 单选题Given the same water depth and line tension,the holding power of a 19 pound/foot wire rope mooring system in comparison to the holding power of a 90 pound/foot chain mooring system will be().A weakerB equalC greaterD indeterminable

考题 单选题What is the best guide for determining the proper scope of anchor chain to use for anchoring in normal conditions?()A One shot of chain for every ten feet of waterB One shot of chain for every fifteen feet of waterC One shot of chain for every thirty feet of waterD One shot of chain for every ninety feet of water