网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
A chain stripper is used to ______.
A.prevent chain from clinging to the wildcat
B.clean the marine debris from the chain
C.flake chain from a boat's chain locker
D.clean chain prior to an x-ray inspection
参考答案
更多 “ A chain stripper is used to ______.A.prevent chain from clinging to the wildcatB.clean the marine debris from the chainC.flake chain from a boat's chain lockerD.clean chain prior to an x-ray inspection ” 相关考题
考题
One advantage of chain over wire rope for a tow bridle is that chain ______.A.is better suited for inland towingB.resists damage from chafingC.handles more easilyD.equalizes towing forces better
考题
The supply chain is the flow of () and services from one business to another.
A、moneyB、intermediate goodsC、ECD、TPN
考题
What are the two main types of stud link chain ________.A.Oil Rig chain and Oil Field Stud Link chainB.Flash-butt welded chain and Di-Lok chainC.Flash-butt welded chain and Oil Rig chainD.Oil Field Stud Link chain and Flash-butt welded chain
考题
What may NOT be used when securing heavy vehicles aboard Ro-Ro vessels ________.A.Chain leverB.TurnbuckleC.WebbingD.Chain
考题
Buckler plates are ______.A.Triangular-shaped plates connecting the bull chain to the topping liftB.Metal plates secured over the tops of the hawsepipesC.Faired shell plates with curvature in two directionsD.Sheets of dunnage used to prevent heavy cargo from buckling the deck plates
考题
A chain bridle is used when towing astern because it ______.A.is easy to connectB.provides an effective catenary and absorbs shock due to its weightC.makes rigging a swivel unnecessaryD.prevents the tow from yawing by the drag of the chains in a seaway
考题
In anchor orders, “Up and down” means “()”.A、The chain is not uprightB、The chain is uprightC、The chain is slackD、The chain is not slack
考题
Which two statements are true about a job chain?()A、 A job chain can contain a nested chain of jobsB、 The jobs in a job chain cannot have more than one dependencyC、 A job of the CHAIN type can be run using event-based or time-based schedulesD、 The jobs in a job chain can be executed only by using the events generated by the Scheduler
考题
单选题A permanent chain chasing system is used to().A
clean anchor chain as it's hauled inB
recover anchors which have lost their buoysC
run and retrieve anchorsD
prepare anchor chain for inspection
考题
单选题A grapnel is a().A
device for securing a chain topping liftB
hook to prevent the anchor cable from slippingC
device used to drag for a submerged cable or lineD
type of clam bucket used for discharging bulk cargo
考题
单选题The purpose of a devil’s claw is to().A
act as a chain stopperB
prevent the windlass from engagingC
prevent the chain from fouling on deckD
control the wildcat
考题
单选题One advantage of chain over wire rope for a tow bridle is that chain().A
is better suited for inland towingB
resists damage from chafingC
handles more easilyD
equalizes towing forces better
考题
单选题In anchoring orders, up and down means().A
the chain is not uprightB
the chain is tightC
the chain is uprightD
the chain is slack
考题
单选题What are the two main types of stud link chain().A
Oil Rig chain and Oil Field Stud Link chainB
Flash-butt welded chain and Di-Lok chainC
Flash-butt welded chain and Oil Rig chainD
Oil Field Stud Link chain and Flash-butt welded chain
考题
单选题A chain bridle is used when towing astern because it().A
is easy to connectB
provides an effective catenary and absorbs shock due to its weightC
makes rigging a swivel unnecessaryD
prevents the tow from yawing by the drag of the chains in a seaway
考题
单选题The purpose of the stripping bar on an anchor windlass is to().A
clean off any mud that may have accumulated on the chainB
engage or disengage the wildcatC
fairlead the chain from the hawse pipe to the wildcatD
prevent the chain from fouling the wildcat
考题
单选题After deploying the anchor,a permanent chain chaser is().A
removed from the anchor chainB
connected to a buoy at the anchorC
stripped back to the rig and securedD
connected to a buoy halfway down the chain
考题
单选题A chain bridle is preferable to a wire rope towing bridle on a long ocean tow because chain().A
is more flexible and has the ability to absorb shock because of its weightB
is less subject to wear and damage from abrasionC
requires little maintenanceD
All of the above
考题
单选题A chain stripper is used to().A
prevent chain from clinging to the wildcatB
clean the marine debris from the chainC
flake chain from a boat's chain lockerD
clean chain prior to an x-ray inspection
考题
单选题What color is used to indicate the last shot of anchor chain?()A
RedB
WhiteC
BlueD
Yellow
考题
单选题What is meant by veering the anchor chain? ()A
Bringing the anchor to short stayB
Heaving in all the chainC
Locking the windlass to prevent more chain from running outD
Paying out more chain
考题
多选题Which two statements are true about a job chain?()AA job chain can contain a nested chain of jobsBThe jobs in a job chain cannot have more than one dependencyCA job of the CHAIN type can be run using event-based or time-based schedulesDThe jobs in a job chain can be executed only by using the events generated by the Scheduler
考题
单选题The fire extinguishing action of CO2 comes mostly from ().A
breaking the fire chemical chain reactionB
smotheringC
coolingD
isolating the heat from the fuel
考题
单选题A sufficient amount of chain must be veered when anchoring a vessel to ensure().A
the vessel has enough room to swing while at anchorB
the anchor flukes bite into the ocean bottomC
there is sufficient weight from the anchor and chain to prevent draggingD
there is more chain out than there is in the chain locker
考题
单选题Buckler plates are().A
triangular-shaped plates connecting the bull chain to the topping liftB
metal plates secured over the tops of the hawsepipesC
faired shell plates with curvature in two directionsD
sheets of dunnage used to prevent heavy cargo from buckling the deck plates
考题
单选题Which type of link is generally used to connect shots of anchor chain().A
DetachableB
OpenC
Pear shapedD
Stud link
热门标签
最新试卷