网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
A system administrator has just applied an update to an AIX system to correct a problem, The APAR number is IX49035 and was shipped as part of the PTF number U437542. After applying the APAR fix, the administrator wants to ensure that the fix is applied before informing the system users of the corrected problem. Which of the following commands should the system administrator run to verify that the APAR fix has been applied to the system?()
A

lslpp -f IX49035

B

lslpp -fB U437542

C

instfix -f IX49035

D

instfix -ik IX49035


参考答案

参考解析
解析: 暂无解析
更多 “单选题A system administrator has just applied an update to an AIX system to correct a problem, The APAR number is IX49035 and was shipped as part of the PTF number U437542. After applying the APAR fix, the administrator wants to ensure that the fix is applied before informing the system users of the corrected problem. Which of the following commands should the system administrator run to verify that the APAR fix has been applied to the system?()A lslpp -f IX49035B lslpp -fB U437542C instfix -f IX49035D instfix -ik IX49035” 相关考题
考题 A system administrator has just applied an update to an AIX system to correct a problem, The APAR number is IX49035 and was shipped as part of the PTF number U437542. After applying the APAR fix, the administrator wants to ensure that the fix is applied before informing the system users of the corrected problem. Which of the following commands should the system administrator run to verify that the APAR fix has been applied to the system?()A.lslpp -f IX49035B.lslpp -fB U437542C.instfix -f IX49035D.instfix -ik IX49035

考题 A system administrator has just migrated a system from AIX V.4 x to Aix V5.x. The system is up and running and appears to be functioning properly. The following error message was received when running lppchk -vbos.rte V =4 R is 4 bos.rte V5bos.rte not installed. 5.1.0lslpp -l | grep bos.rte shows 5.1.0 Which of the following options is the most likely solution to this problem?()A.bos.rte is corrupted and needs to be reinstalled.B.The system administration needs to reboot the system.C.The /root part of bos.rte was installed but not the user part. Reinstall the missing software.D.The update CD needs to be applied with the smitty update_all command.

考题 A System p administrator has determined that a recently applied APAR needs to be removed.  Which of the following installp options will remove the APAR()A、cleanupB、uninstallC、deinstallD、reject

考题 After installing a new p5 595, the system performs poorly. Which of the following services would provide updates needed to fix the problem?()A、AlertB、Fix CentralC、Software MaintenanceD、Performance Monitoring

考题 An administrator has added a new device to a system and wants to determine if it has been correctly added to the ODM database. Which command would the system administrator use?()A、odmgetB、odmaddC、odmshowD、odmcreate

考题 After a server has been installed into a rack, an administrator must ensure which of the following?()A、Warm air flow is permitted through the front bezelB、The system is labeled so that it can be identifiedC、Verify the change control process can be implementedD、Determine the correct power requirements

考题 A server administrator implements a solution that should fix an issue. Which of the following should the administrator do NEXT in the troubleshooting process?()A、Notify users impacted by the problemB、Verify full system functionalityC、Document the actions and outcomesD、Identify the scope of the problem

考题 A system administrator has been asked to install an APAR but wants to be able to easily remove it. Which install option should be used?()A、applyB、cleanupC、commitD、reject

考题 After updating the system, the system administrator runs the lppchk-v command. During this process, the bos.rte.libc is in a broken state. Which of the following procedures should be performed to fix this problem?()A、Reinstall the systemB、Use installp -r to reject the broken filesetC、Use installp -acgFXd to reinstall the fileset at the same levelD、Use install -u to remove this broken fileset and reinstall it again

考题 During system boot, the system hangs at LED 0C31. What is the first step the system administrator should take to correct the problem?()A、Check system console connectionsB、Check system network connectionsC、Boot in service mode and change the bootlistD、Boot from the AIX installation media and mount rootvg filesystems

考题 A system administrator has just finished upgrading a system to AIX 5.2. If there are future problems, the system administrator would like to add an entry to the AIX errorlog to record this event. Which of the following commands can be issued for this purpose?()A、/usr/bin/errmsg "System upgraded to AIX 5.2"B、/usr/bin/errlog "System upgraded to AIX 5.2"C、/usr/bin/errupdate "System upgraded to AIX 5.2"D、/usr/bin/errlogger "System upgraded to AIX 5.2"

考题 The boot .net.tcp.client fileset is broken. Which of the following procedures must be performed to fix the problem?()A、Reinstall with the Force Overwrite optionB、Update the fileset at a lower levelC、Install the update in the commit stateD、Reboot the system to fix the broken filelist

考题 Companycom has successfully established their p5 LPAR environment on a POWER5 p5 590 running AIX 5.2. They are now ready to move to Virtual IO. What would be required to do Virtual IO?()A、Apply APAR IY62262 to the current AIX 5.2 Maintenance level 04. Virtual IO Server is not required. B、Purchase Advanced POWER Virtualization software, upgrade to AIX 5.3 maintenance level 1 and apply APAR IY60349. Virtual IO Server is not required. C、Verify that there are enough resources to add a Virtual IO Server, upgrade to AIX 5.3 with APAR IY60349, create a Virtual IO Server after applying APAR IY62262. D、Verify that there are enough resources to add a Virtual IO Server, create a Virtual IO Server and apply APAR IY62262, verify that the system is at AIX 5.2 with Maintenance level 04.

考题 A system administrator has determined that a recently applied APAR needs to be removed. Which of the following installp options will remove the APAR?()A、cleanupB、commitC、deinstallD、reject

考题 A system administrator has just applied an update to an AIX system to correct a problem, The APAR number is IX49035 and was shipped as part of the PTF number U437542. After applying the APAR fix, the administrator wants to ensure that the fix is applied before informing the system users of the corrected problem. Which of the following commands should the system administrator run to verify that the APAR fix has been applied to the system?()A、lslpp -f IX49035B、lslpp -fB U437542C、instfix -f IX49035D、instfix -ik IX49035

考题 单选题A system administrator has just finished upgrading a system to AIX 5.2. If there are future problems, the system administrator would like to add an entry to the AIX errorlog to record this event. Which of the following commands can be issued for this purpose?()A /usr/bin/errmsg System upgraded to AIX 5.2B /usr/bin/errlog System upgraded to AIX 5.2C /usr/bin/errupdate System upgraded to AIX 5.2D /usr/bin/errlogger System upgraded to AIX 5.2

考题 单选题Companycom has successfully established their p5 LPAR environment on a POWER5 p5 590 running AIX 5.2. They are now ready to move to Virtual IO. What would be required to do Virtual IO?()A Apply APAR IY62262 to the current AIX 5.2 Maintenance level 04. Virtual IO Server is not required. B Purchase Advanced POWER Virtualization software, upgrade to AIX 5.3 maintenance level 1 and apply APAR IY60349. Virtual IO Server is not required. C Verify that there are enough resources to add a Virtual IO Server, upgrade to AIX 5.3 with APAR IY60349, create a Virtual IO Server after applying APAR IY62262. D Verify that there are enough resources to add a Virtual IO Server, create a Virtual IO Server and apply APAR IY62262, verify that the system is at AIX 5.2 with Maintenance level 04.

考题 单选题After updating the system, the system administrator runs the lppchk-v command. During this process, the bos.rte.libc is in a broken state. Which of the following procedures should be performed to fix this problem?()A Reinstall the systemB Use installp -r to reject the broken filesetC Use installp -acgFXd to reinstall the fileset at the same levelD Use install -u to remove this broken fileset and reinstall it again

考题 单选题During system boot, the system hangs at LED 0C31. What is the first step the system administrator should take to correct the problem?()A Check system console connectionsB Check system network connectionsC Boot in service mode and change the bootlistD Boot from the AIX installation media and mount rootvg filesystems

考题 单选题A server administrator implements a solution that should fix an issue. Which of the following should the administrator do NEXT in the troubleshooting process?()A Notify users impacted by the problemB Verify full system functionalityC Document the actions and outcomesD Identify the scope of the problem

考题 单选题After a server has been installed into a rack, an administrator must ensure which of the following?()A Warm air flow is permitted through the front bezelB The system is labeled so that it can be identifiedC Verify the change control process can be implementedD Determine the correct power requirements

考题 单选题A system administrator has just migrated a system from AIX V.4 x to Aix V5.x. The system is up and running and appears to be functioning properly. The following error message was received when running lppchk -v bos.rte V =4 R is 4 bos.rte V5 bos.rte not installed. 5.1.0 lslpp -l | grep bos.rte shows 5.1.0 Which of the following options is the most likely solution to this problem?()A bos.rte is corrupted and needs to be reinstalled.B The system administration needs to reboot the system.C The /root part of bos.rte was installed but not the user part. Reinstall the missing software.D The update CD needs to be applied with the smitty update_all command.

考题 单选题A System p administrator has determined that a recently applied APAR needs to be removed.  Which of the following installp options will remove the APAR()A cleanupB uninstallC deinstallD reject

考题 单选题The boot .net.tcp.client fileset is broken. Which of the following procedures must be performed to fix the problem?()A Reinstall with the Force Overwrite optionB Update the fileset at a lower levelC Install the update in the commit stateD Reboot the system to fix the broken filelist

考题 单选题A system administrator has been asked to install an APAR but wants to be able to easily remove it. Which install option should be used?()A applyB cleanupC commitD reject

考题 单选题A system administrator has determined that a recently applied APAR needs to be removed. Which of the following installp options will remove the APAR?()A cleanupB commitC deinstallD reject

考题 单选题An administrator has added a new device to a system and wants to determine if it has been correctly added to the ODM database. Which command would the system administrator use?()A odmgetB odmaddC odmshowD odmcreate