If one of the bilge system manifold valves does not properly seat, the ()
A

bilge well connected to that valve, plus the second bilge well being pumped will be completely emptied

B

bilge system will lose vacuum and prevent the other bilges from being pumped out

C

bilge well aft connected to that valve will siphon its contents to the forward bilge wells

D

discharge pressure will be too high


参考答案

参考解析
解析: 暂无解析
更多 “单选题If one of the bilge system manifold valves does not properly seat, the ()A bilge well connected to that valve, plus the second bilge well being pumped will be completely emptiedB bilge system will lose vacuum and prevent the other bilges from being pumped outC bilge well aft connected to that valve will siphon its contents to the forward bilge wellsD discharge pressure will be too high” 相关考题
考题 Why does the system fall to arrest a wanted person?A.The system is not effective in recognizing people.B.The system doesn't look at skin color or one's gender.C.The system doesn't consider people's specific features.D.The system is highly inaccurate and can be easily fooled.

考题 Accidental flooding of the engine room bilges by the bilge main is prevented by( ).A.stop-check valves installed in the bilge suction manifoldsB.using a positive displacement reciprocating bilge pumpC.installing educators in all bilge rose boxesD.installing a swing check before each bilge valve

考题 An administrator has just installed a new NIC into the server. The system POSTs fine and the NIC is recognized by the OS, but it does not receive an IP address. Which of the following is the MOST likely cause of this?()A. The NIC is not on the HCL.B. The driver is incorrect on the server.C. The patch cable has not been seated properly.D. The NIC is not seated properly.

考题 A fire pump may be used for other purposes if ______.A.the other services are run off a reducing station with a pressure gageB.one of the required pumps is kept available for use on the fire main system at all timesC.no relief valves are installedD.all of the above conditions are met

考题 The system of valves and cargo lines in the bottom piping network of a tank vessel that connects one section of cargo tanks to another section is called a ______.A.crossoverB.runaroundC.come-alongD.manifold

考题 A vessel in ocean service that does not have an approved means of processing oily bilge slops or oily ballast must have ______.A.a fixed piping system for ballast discharge to a reception facilityB.a discharge outlet for the ballast system on each side of the weather deckC.one portable adapter for a shore connection to the ballast lineD.All of the above

考题 The system of valves and cargo lines in the bottom piping network of a tanker that connects one section of cargo tanks to another section is called a ______.A.come-alongB.crossoverC.manifoldD.runaround

考题 What problem does Hanna Sanchez mention?A.The technican's do not have enough time between sessions B.One of the rooms is not fully equipped for the presentations C.One of the presentations will need to be rescheduled D.The lighting in room 106 does not work properly

考题 An administrator has just installed a new NIC into the server. The system POSTs fine and the NIC is recognized by the OS, but it does not receive an IP address. Which of the following is the MOST likely cause of this?()A、The NIC is not on the HCL.B、The driver is incorrect on the server.C、The patch cable has not been seated properly.D、The NIC is not seated properly.

考题 单选题The bilge system has been performing well; however, the aft starboard engine room bilgewell suddenly fails to be pumped outWhich of the following should be done first to determine the cause?()A Open the bilge pump for inspectionB Remove each of the manifold valvesC Remove only the manifold valve to the affected bilge-wellD Attempt to pump out another bilge well to determine if the entire system is affected

考题 单选题One characteristic of a pulse type turbo-charging system is()A high average exhaust manifoldB greatly fluctuating inlet manifold pressureC constant exhaust manifold pressureD multiple exhaust pipes to the turbocharger

考题 单选题An emergency bilge pumping system is provided and should be () of the main bilge pumping system, according to the SOLAS 74 Convention.A dependentB in dependentC in seriesD in parallel

考题 单选题Where an excessive level of contamination is detected an alarm is sounded and diverting valves are operatedThe discharging liquid is then passed to ().A overboardB a bilge wellC a slop tankD a hot well

考题 单选题Accidental flooding of the engine room bilges by the bilge main is prevented by ().A stop-check valves installed in the bilge manifoldsB using a positive displacement reciprocating bilge pumpC installing eductors in all bilge rose boxesD installing a swing check before each bilge valve

考题 单选题The series of valves used to control the return flow in well control operations is called the().A valve assemblyB standpipe manifoldC accumulator manifoldD choke manifold

考题 单选题The refrigeration compressor in a water cooled refrigeration system is short cycling on the high pressure cutout switch, One reason for this could be the ().A system is low on refrigerantB high pressure cutout switch is improperly adjustedC discharge valves are leaking slightlyD discharge valves are leaking excessively

考题 单选题The system of valves and cargo lines in the bottom piping network of a tank vessel that connects one section of cargo tanks to another section is called a().A crossoverB runaroundC come-alongD manifold

考题 单选题In setting the valves on a steam-smothering system on a tank vessel,the master control valve to cargo tanks should be().A open and individual tank valves openB open and the individual tank valves closedC closed and the individual tank valves closedD closed and the individual tank valves open

考题 单选题As a watch officer when bunkering, which of the following does require his individual attention?()A draft of the vesselB rate of deliveryC communication with terminal personnelD observation of manifold valves

考题 单选题Hydraulic cranes must be properly warmed-up before being operated because ().A warm-up allows the hydraulic system to become charged with oilB warm-up allows the relief valves to be properly testedC hydraulic strainers operate only during the warm-up periodD hydraulic fluid must be at the proper viscosity

考题 单选题A compound gauge is typically installed on the ().A suction side of a bilge pumpB exhaust manifold of an auxiliary dieselC discharge line from an air compressorD chemical feed tank of an evaporator

考题 单选题According to the SOLAS convention, the bilge water system ()A must connect the bilge well suction directlyB should not pump out the water accumulated in the cargosC should not used for emergency drainage in case of ship collisionD should connect to the fire fighting system directly

考题 单选题An administrator has just installed a new NIC into the server. The system POSTs fine and the NIC is recognized by the OS, but it does not receive an IP address. Which of the following is the MOST likely cause of this?()A The NIC is not on the HCL.B The driver is incorrect on the server.C The patch cable has not been seated properly.D The NIC is not seated properly.

考题 单选题A vessel in ocean service that does not have an approved means of processing oily bilge slops or oily ballast must have().A a fixed piping system for ballast discharge to a reception facilityB a discharge outlet for the ballast system on each side of the weather deckC one portable adapter for a shore connection to the ballast lineD All of the above

考题 单选题You are unable to pump out the aft starboard engine room bilge well that is fouled, with one foot of water over the top of the bilge well, what actionshould be carried out?()A Send the wiper into the well with only a scoop and pailB Remove the bilge manifold valve and attempt to back flush the lineC Simultaneously operate all available bilge pumpsD It is only necessary to transfer half the contents of a drum of degreaser into the bilge well

考题 单选题In setting the valves on a steam-smothering system on a tanker,the master control valve to cargo tanks should be().A open and individual tank valves openB open and the individual tank valves closedC closed and the individual tank valves closedD closed and the individual tank valves open

考题 单选题The timing of diesel engine air starting valves is controlled by()A the air start valve timing gears and rodsB a cylinder check valveC individual cams and valve gearD an air manifold poppet valve