网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
According to the SOLAS convention, the bilge water system ()
A

must connect the bilge well suction directly

B

should not pump out the water accumulated in the cargos

C

should not used for emergency drainage in case of ship collision

D

should connect to the fire fighting system directly


参考答案

参考解析
解析: 暂无解析
更多 “单选题According to the SOLAS convention, the bilge water system ()A must connect the bilge well suction directlyB should not pump out the water accumulated in the cargosC should not used for emergency drainage in case of ship collisionD should connect to the fire fighting system directly” 相关考题
考题 ()must be familiar with these requirements of bilge water management, particularly those directly involved with such operations involving bilge water. A.All responsible personnelB.All the crew served in engine roomC.The masterD.The chief engineer

考题 How to pump out bilge water in the engine room?

考题 During the PSC inspection, under the provision of SOLAS74, which one may not be regarded as clear grounds for ships' detainment?A.excess amount of oily-water mixtures in bilgesB.insulation of piping including exhaust pipes in engine room contaminated by oilC.improper operation of bilge pumping arrangementsD.paint peeling off the uptake

考题 After being launched from a vessel, totally enclosed survival craft which have been afloat over a long period require ______.A.frequent opening of hatches to permit entry of fresh airB.regular checks of bilge levelsC.use of ear plugs to dampen engine noiseD.frequent flushing of the water spray system with fresh water

考题 Before loading bulk grain, bilge wells must be covered to ______.A.add strength to the bilge well strainerB.permit rapid flow of water to the bilge wellsC.prevent cargo sifting into the bilge wellsD.prevent oil, water, or other liquid from reaching the cargo

考题 Is this a ()(淡水) tank?A、bilge waterB、ballast waterC、fresh waterD、sea water

考题 淡水注入管()A、fresh water filling pipeB、sea water filling pipeC、ballast water filling pipeD、bilge water filling pipe

考题 饮用水注入管()A、fresh water filling pipeB、bilge water filling pipeC、drinking water filling pipeD、sea water filling pipe

考题 污水井()A、bilge wellB、bilge waterC、fresh waterD、sea water

考题 污水井盖()A、bilge well coverB、ballast water coverC、fresh water coverD、sea water well

考题 单选题() is used for washing and drinking.A The ballast systemB The salt water systemC The bilge systemD The domestic system

考题 单选题The coordinated broadcast and automated reception of MSI via the INMARSAT EGC system using English to meet the requirements of the SOLAS Convention:().A international NAVTEX ServiceB FleetNET ServiceC SafetyNet ServiceD WWNWS

考题 单选题Which of the equipment listed is most effective in processing bilge slops for overboard discharge?()A 100PPM oily water separatorB Assembling the lube oil purifier as a separator and aligning bilge overboardC A 15PPM oily water separatorD A magnetic duplex strainer

考题 单选题An emergency bilge pumping system is provided and should be () of the main bilge pumping system, according to the SOLAS 74 Convention.A dependentB in dependentC in seriesD in parallel

考题 单选题After being launched from a vessel,totally enclosed survival craft which have been afloat over a long period require().A frequent opening of hatches to permit entry of fresh airB regular checks of bilge levelsC use of ear plugs to dampen engine noiseD frequent flushing of the water spray system with fresh water

考题 单选题Before loading bulk grain,bilge wells must be covered to().A add strength to the bilge well strainerB permit rapid flow of water to the bilge wellsC prevent cargo sifting into the bilge wellsD prevent oil,water,or other liquid from reaching the cargo

考题 单选题Upon arrival at a port, a vessel is not allowed () her ballast water, tanker washings or bilge water and other oily water at will.A to dischargeB to be dischargedC dischargingD being discharged

考题 单选题The SOLAS convention about “passenger ship and dried food ship damage control” prescribes that the engine room emergency bilge water suction should connect with ()A the main S-W pumpB ballast pumpC air-conditioning water pumpD the main S-W pump or ballast pumps that have the biggest output

考题 单选题The SOLAS convention prescribes that in the fire fighting drill the duty engineer should start the pump and supply deck water in() minute(s).A 5B 3C 2D 1

考题 单选题The SOLAS Convention is the main international convention()A about marine pollution preventionB covering safety of lifeC about marineD about ship and port security

考题 单选题An oil water monitor is required in order to measure ().A the oil content in waterB the water content in fuel oilC the water level in bilge wellD the oil level in bilge well

考题 单选题Ships do not permitted to the TBT paint after 2008,It is required by()A the International Convention for the Safety of the Life at SeaB the International Convention for the Prevention from shipsC the International Convention on control of harmful anti-fouling system on shipsD the International Convention for the Control and Management of Ship’s Ballast Water and Sediments

考题 单选题During the PSC inspection, under the provisions of SOLAS 74, which one may not be regarded as clear grounds for ships’ detainment?()A excess amount of oily-water mixtures in bilgesB insulation of piping including exhaust pipes in engine room contaminated by oilC improper operation of bilge pumping arrangementsD there were an actual emergency

考题 单选题Having studied the INMARSAT document, GMDSS document, SOLAS Convention and other international navigation documents, we all know that the Chapter IV of SOLAS Convention is mainly about().A the radio regulationsB the technical terms and definitionsC how to operate the GMDSS SES equipmentD Maritime Communications

考题 单选题SOLAS stands for()A the International Convention for the Safety of the Life at SeaB the International Convention for the Prevention from shipsC the International Convention on Standards of Training, Certification and Watch keeping for SeafarersD the International Convention for the Control and Management of Ship’s Ballast Water and Sediments

考题 单选题When discharging bilge water, which criteria must be observed?()A The requirement for the oil content of bilge water discharged is 15 ppmB No discharge in sensitive watersC Any discharge in sensitive watersD International, national or local requirements have to be observed

考题 单选题If water is rising in the bilge of a lifeboat,you should FIRST().A abandon the survival craftB check for cracks in the hullC shift all personnel to the sternD check the bilge drain plug