A wooden float placed between a ship and a dock to prevent damage to both is called a().
A

camel

B

dolphin

C

rat guard

D

wedge


参考答案

参考解析
解析: 暂无解析
更多 “单选题A wooden float placed between a ship and a dock to prevent damage to both is called a().A camelB dolphinC rat guardD wedge” 相关考题
考题 The logical relationship that communicates a delay between the start/finish of one activity and the start/finish of another activity is referred to as:A.SlackB.Free float.C.Restricted float.D.Level float.E.Lag

考题 22 The logical relationship that communicates a delay between the start/finish of one activity and the start/finish of another activity is referred to as:A. SlackB. Free float.C. Restricted float.D. Level float.E. Lag

考题 Although a ship usually has repair in a shipyard, ________ is also necessaryA.the general repair on boardB.the voyage repairC.the annual repairD.the dock repair

考题 A spring line leads ______.A.fore and aft from the ship’s sideB.to the dock at a right angle to the vesselC.through the bull nose or chock at the bowD.through the chock at the stern

考题 A wooden float placed between a ship and a dock to prevent damage to both is called a ______.A.camelB.dolphinC.rat guardD.wedge

考题 ______ is not an item of the communication between the ship and shore.A.agreed procedure to STOP cargo operationsB.Personnel responsible for terminal cargo operationsC.agreed procedure for draught checkingD.agreement between the ship's Master and the terminal representative

考题 On a ship,a door that is required to be marked KEEP CLOSED is designed to ______.A.prevent the passage of flammable gasesB.prevent the passage of poisonous vaporsC.delay the spread of heat and flamesD.maintain watertight integrity

考题 A deck beam does NOT ______.A.act as a beam to support vertical deck loadsB.lessen the longitudinal stiffness of the vesselC.act as a tie to keep the sides of the ship in placeD.act as a web to prevent plate wrinkling due to twisting action on the vessel

考题 Cribbing is ______.A.wooden blocks or dunnage placed between a deck load and the deckB.the chains and shackles used to secure a deck cargoC.a crate in which a deck cargo is packagedD.cardboard separation pieces placed between deck loads to prevent chafing

考题 class super {   public float getNum() {return 3.0f;}   }   public class Sub extends Super {   }   Which method, placed at line 6, will cause a compiler error?()A、 Public float getNum() {return 4.0f; }B、 Public void getNum (){}C、 Public void getNum (double d){}D、 Public double getNum (float d) {retrun 4.0f; }

考题 The ship is to ()to buoys.A、moorB、berthC、anchorD、dock

考题 单选题A carling is used aboard ship().A as a connecting strap between the butted ends of platingB to stiffen areas under points of great stress between beamsC to prevent the anchor from fouling when the brake is releasedD to provide an extra heavy fitting in a heavy lift cargo rig

考题 单选题To prevent a wooden hull from leaking you caulk it().A after drydocking,while the hull is moistB after drydocking,and the hull has driedC afloat,where it is leakingD afloat,in all accessible areas

考题 单选题The officer in charge of the engineering watch shall ensure that all machinery involved with the maneuvering of the ship can immediately be placed in the () of operation when notified that the ship is in congested waters.A manual modeB automatic modeC remote modeD follow-up mode

考题 单选题The emergency bilge suction or bilge injection valve is used to prevent () of the ship.A proceedingB overloadingC collisionD flooding

考题 单选题When a ship is fully loaded, it needs to prevent the main engine to be().While a ship is fully empty, it needs to prevent the main engine to be().A overspeed;overloadB overload;overspeedC over mechanical load;over thermal loadD over torque;overspeed

考题 单选题When ship in the dock repairing, engine department should emphasize on the inspection of()A sea valve chest, sect valve, thrusterB bilge motherboard, steering and the shaft systemC sea water systemD fresh water system

考题 单选题In a river subject to tidal currents,the best time to dock a ship without the assistance of tugs is().A at high waterB when there is a following currentC at slack waterD at flood

考题 单选题You are docking a vessel starboard side to with the assistance of two tugs.You are attempting to hold the vessel off by operating both tugs at right angles to the vessel and at full power.You must ensure that().A steerageway is not taken offB the bow doesn't close the dock firstC the bow closes the dock firstD the ship has no headway at the time

考题 单选题What is placed on the underside of an inflatable liferaft to help prevent it from being skidded by the wind or overturned? ()A Ballast bagsB A keelC StrikesD Sea anchor

考题 单选题Vessel shall be placed at the()of the Charterers in such dock or at such berth or place as the Charterers may direct.A disposalB controlC operationD option

考题 单选题A wooden plug fitted tightly in the vent of a damaged tank may prevent the tank from().A filling completelyB developing free surfaceC developing free surface momentD collapsing

考题 单选题Cribbing is().A wooden blocks or dunnage placed between a deck load and the deckB the chains and shackles used to secure a deck cargoC a crate in which a deck cargo is packagedD cardboard separation pieces placed between deck loads to prevent chafing

考题 单选题A carling is used aboard ship().A as a connecting strap between the butted ends of platingB to stiffen areas under points of great stress between beamsC to prevent the anchor from fouling when the brake is releasedD to provide an extra heavy fitting in a lift cargo released

考题 单选题The wooden plug inserted in the vent of a damaged tank of a ship should be removed in case it is decided to().A pump from the damaged tankB fight a fireC abandon the rigD use the crossover system

考题 单选题Which of the following precautions should always be carried out in dry dock?()A Liquids should never be transferred between tanks without consulting the dock masterB If sea valves have been disassembled, all bonnets must be checked for leakage when the ship is re-floatedC Before re-floating, all sea chest strainers should be verified as having been replacedD All of the above

考题 单选题When checking a mooring line,you should().A ensure the bight is not fouled between the ship and the dock by taking up slackB pay out slack smartly and keep free for runningC secure more turns to hold the line against any strain,then clear the areaD surge the line so that it maintains a strain without parting