网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
Consideration should be given in planning for the mooring orientation in a new location so that in adverse weather a crane is available to off-load the supply vessel on what side of the unit?()
A

Weather side

B

Leeward side

C

Upwind side

D

Crosswind side


参考答案

参考解析
解析: 暂无解析
更多 “单选题Consideration should be given in planning for the mooring orientation in a new location so that in adverse weather a crane is available to off-load the supply vessel on what side of the unit?()A Weather sideB Leeward sideC Upwind sideD Crosswind side” 相关考题
考题 Lesson planning should be done at two levels: _____. A.macro planning and micro planningB.day by day and one week

考题 (d) Explain to the management of Bailey’s why consideration should be given to resolving the problems through:(i) job rotation; (5 marks)

考题 ideally, lesson planning should be done at two levels: _______________. A. before-class planning and after-class planningB. before-class preparation and after-class feedbackC. before-class planning and after-class reflectionD. macro planning and micro planning

考题 Your speech given at the meeting, ______ everyone is taking into careful consideration, means much to us all.() A、 whereB、 whatC、 asD、 which

考题 Mooring winch should be equipped with mechanical brakes capable of holding ______.A.half the breaking strength of the mooring lineB.the full breaking strength of the mooring lineC.the maximum expected tension of the mooring lineD.50% over the working tension of the mooring line

考题 Mooring winch should be equipped with mechanical brakes which are capable of holding ______.A.half the breaking strength of the mooring lineB.the full breaking strength of the mooring lineC.the maximum expected tension of the mooring lineD.50% over the working tension of the mooring line

考题 A storm is forecast for the area where your vessel is moored. For its safety you should put ______.A.more slack in the mooring linesB.a strain on the mooring linesC.chafing gear on the mooring linesD.grease on the mooring lines

考题 If a mooring line should part while you are tying up at a dock,you should make a temporary eye by tying a ______.A.becket bendB.clove hitchC.bowlineD.square knot

考题 When planning the loading or discharging of a VLCC(100,000 DWT+)what is the most important consideration ________.A.Draft and trimB.Limits of the bending momentsC.Rate of dischargingD.Rate of loading

考题 Given the same water depth and line tension, the holding power of a 19 pound / foot wire rope mooring system in comparison to the holding power of a 90 pound / foot chain mooring system will be ______.A.weakerB.equalC.greaterD.Indeterminable

考题 他们应该照看系泊缆绳。()A、They should take care of the mooring lines.B、They should take care of the gangway.C、They should take care of anchors.D、They should take care of anchor chains.

考题 他们应该注意装卸货情况。()A、They should pay attention to the safety of the ship.B、They should pay attention to the rise and fall of tide.C、They should pay attention to the conditions of loading and unloading.D、They should pay attention to take care of the mooring lines.

考题 单选题If a mooring line should part while you are tying up at a dock,you should make a temporary eye by tying a().A becket bendB clove hitchC bowlineD square knot

考题 单选题他们应该照看系泊缆绳。()A They should take care of the mooring lines.B They should take care of the gangway.C They should take care of anchors.D They should take care of anchor chains.

考题 单选题In the design of hydraulic piping and equipment consideration is given to minimize turbulence in the hydraulic fluid, as this will cause()A molecular fluid vibrationB energy lossesC wide pressure variationsD mechanical damage to control valves

考题 填空题What should you take into consideration when choosing a life insurance policy?Both your needs and the ____.

考题 单选题After repair, the voyage trial of the M-E should be done ()A after the mooring trial has passedB before the mooring trialC under the surveyors supervisionD after repair

考题 单选题If you are given the job of adding hydraulic fluid to a mooring winch, and are not certain as to the type of fluid to use, you should ().A add fluid that is the same color as the fluid in the reservoirB add turbine oil because it is always a good substituteC add any oil that has the same viscosity as the hydraulic fluidD check the winch manufacturers instruction book

考题 单选题You should ()the mooring lines at the same time when the wind is big.A fastenB slackC fastD slacken

考题 单选题When planning the loading or discharging of a VLCC (100,000 DWT+) what is the most important consideration?()A Draft and trimB Limits of the bending momentsC Rate of dischargingD Rate of loading

考题 单选题You should adjust the mooring lines according to the changes of()(吃水).A waterB draftC tideD sea

考题 单选题An anchor winch should be equipped with mechanical brakes capable of holding().A half the breaking strength of the mooring lineB the full breaking strength of the mooring lineC the maximum expected tension of the mooring lineD 50% over the working tension of the mooring line

考题 单选题In selecting a tug for moving a vessel,consideration should be given to its().A indicated horsepower,bollard pull,and displacementB indicated horsepower,maneuverability,and displacementC indicated horsepower,bollard pull,and maneuverabilityD bollard pull,displacement,and maneuverability

考题 单选题You are mooring to a buoy.You should approach the buoy with the current from().A aheadB broad on the bowC abeamD astern

考题 单选题When the order given by bridge may have bad results, the duty engineer should()A inform the captain for a further consideration, then perform itB inform the captain, and not perform itC stop the M/E immediately, and then inform the chief engineerD stop the M/E immediately, and then inform the captain

考题 单选题A storm is forecast for the area where your vessel is moored. For its safety you should put ().A more slack in the mooring linesB a strain on the mooring linesC chafing gear on the mooring linesD grease on the mooring lines

考题 单选题Given the same water depth and line tension,the holding power of a 19 pound/foot wire rope mooring system in comparison to the holding power of a 90 pound/foot chain mooring system will be().A weakerB equalC greaterD indeterminable