网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
Before the oily water is installed on board ships, it must have ()
A

IOPP

B

type approval certificate

C

cargo ship safety equipment certificate

D

cargo ship safety certificate


参考答案

参考解析
解析: 暂无解析
更多 “单选题Before the oily water is installed on board ships, it must have ()A IOPPB type approval certificateC cargo ship safety equipment certificateD cargo ship safety certificate” 相关考题
考题 How to operate oily water separator?

考题 During the PSC inspection, under the provision of SOLAS74, which one may not be regarded as clear grounds for ships' detainment?A.excess amount of oily-water mixtures in bilgesB.insulation of piping including exhaust pipes in engine room contaminated by oilC.improper operation of bilge pumping arrangementsD.paint peeling off the uptake

考题 When started, a complete oily water separating unit is first filled ______. The oily water mixture is then pumped through the inlet pipe into the coarse separating compartment.A.with dirty waterB.with clean waterC.by oily waterD.by mixed water

考题 A certificated lifeboatman assigned to command the lifeboat must ______.A.be the first individual to board the craftB.drain the hydraulic pressure before lowering the craftC.have a list of the persons assigned to the liftboatD.all of the above

考题 Under regulation 6(2) of MARPOL Annex VI, ships constructed before 19 May 2005 shall be issued with the IAPP Certificate no later than the first scheduled dry docking after 19 May 2005, but in no case later than 19 May 2008. Ships flying the flag of a State which is not a Party to MARPOL Annex VI and which do not carry an IAPP Certificate after the above dates should be treated in accordance with chapter 3 of these Guidelines. Which deficiency listed below may not cause the detention of the vessel by PSC inspection?()A、Absence of valid IAPP Certificate, EIAPP Certificates or Technical FilesB、A diesel engine, with a power output of more than 130 kW, which is installed on board a ship constructed on or after 1 January 2000, or a diesel engine having undergone a major conversion on or after 1 January 2000, which does not comply with the NOx Technical CodeC、the sulphur content of any fuel oil being used on board exceeds 4.5% m/mD、An incinerator installed on board the ship before 1 January 2000 does not comply with requirements contained in appendix IV to the Annex, or the standard specifications for shipboard incinerators developed by the Organization (resolutions MEPC.76(40) and MEPC.93(45))

考题 An administrator has just finished physically replacing the system board in a Windows domain controller. Which of the following must be done before booting the server back into Windows?()A、Update the time and date in the BIOS.B、Update the firmware on the SCSI controller.C、Update the firmware to the latest version.D、Configure IPMI on the new board.

考题 单选题Placing a filter on the () of an oily water separator will "polish" the discharge but overloading must be avoided.A suction sideB discharge sideC by-pass pipeD sampling pipe

考题 单选题Which of the equipment listed is most effective in processing bilge slops for overboard discharge?()A 100PPM oily water separatorB Assembling the lube oil purifier as a separator and aligning bilge overboardC A 15PPM oily water separatorD A magnetic duplex strainer

考题 单选题Before loading bulk grain,bilge wells must be covered to().A add strength to the bilge well strainerB permit rapid flow of water to the bilge wellsC prevent cargo sifting into the bilge wellsD prevent oil,water,or other liquid from reaching the cargo

考题 单选题Upon arrival at a port, a vessel is not allowed () her ballast water, tanker washings or bilge water and other oily water at will.A to dischargeB to be dischargedC dischargingD being discharged

考题 单选题A new ocean going ship of 2000 gross tons having an inoperative oily water separator may dispose of its bilge slops by ().A holding its slops onboard until they can be pumped into the city sewer systemB circulating them through the lube oil purifier to remove water and debrisC holding its slops onboard until they can be discharged to a shore side reception facilityD pumping them into a settling tank for separation before pumping the oily water residue overboard

考题 单选题An  administrator  must  verify  all  filesets  are  completely  installed  before  an  upgrade.   Which  of  the following commands will perform this task()A Islpp -vB Ippchk -vC installp -vD instfix -v

考题 单选题Bottom blow valves are installed on auxiliary water-tube boilers to ()A remove suspended and precipitated solids from the boiler waterB completely drain the boiler in an emergency situationC prevent hardened scale deposits in the water drumD remove floating impurities from the oily water surface

考题 单选题Before operating a non-oceangoing ship greater than 100 gross tons it must have a fixed piping system to discharge oily mixtures ashore. This system must include().A approved oily-water separating equipmentB a fixed or portable containment system at the shore connectionC a spare pump in case the main pump is inoperativeD at least one outlet accessible from the weather deck

考题 单选题Which of the following is wrong about operation of oily water separator?()A filled with clean water before operationB keep air cushion in oil collecting space during runningC check oil level during runningD clean inner separator with low pressure stream

考题 单选题Before operating a non-oceangoing ship greater than 100 gross tons it must have a fixed piping system to discharge oily mixtures ashore. This system must include().A approved oil-water separating equipmentB a fixed or portable containment system at the shore connectionC a spare pump in case the main pump is inoperativeD at least one outlet accessible from the weather deck

考题 单选题Under regulation 6(2) of MARPOL Annex VI, ships constructed before 19 May 2005 shall be issued with the IAPP Certificate no later than the first scheduled dry docking after 19 May 2005, but in no case later than 19 May 2008. Ships flying the flag of a State which is not a Party to MARPOL Annex VI and which do not carry an IAPP Certificate after the above dates should be treated in accordance with chapter 3 of these Guidelines. Which deficiency listed below may not cause the detention of the vessel by PSC inspection?()A Absence of valid IAPP Certificate, EIAPP Certificates or Technical FilesB A diesel engine, with a power output of more than 130 kW, which is installed on board a ship constructed on or after 1 January 2000, or a diesel engine having undergone a major conversion on or after 1 January 2000, which does not comply with the NOx Technical CodeC the sulphur content of any fuel oil being used on board exceeds 4.5% m/mD An incinerator installed on board the ship before 1 January 2000 does not comply with requirements contained in appendix IV to the Annex, or the standard specifications for shipboard incinerators developed by the Organization (resolutions MEPC.76(40) and MEPC.93(45))

考题 单选题A certificated lifeboatman assigned to command the lifeboat must().A be the first individual to board the craftB drain the hydraulic pressure before lowering the craftC have a list of the persons assigned to the lifeboatD All of the above

考题 单选题During inspection of oil and oily mixtures from machinery spaces, which of the following factors should be taken into account by the PSCO? ()A The quantity of oil residues generatedB The capacity of sludge and bilge water holding tankC The capacity of the oily water separatorD All of the above

考题 单选题The fuel from the bunker tanks must be treated by before entering the service tanks(), from where the fuel enters()A centrifugal separators; the engine cylinderB oily water separators; the engine cylinderC oily water separators; the fuel supply systemD centrifuges; the fuel supply system

考题 单选题Before the oily water separator put into operation, it should be ()A filled with bilge waterB filled with oilC filled with clean waterD be emptied

考题 单选题When started, a complete oily water separating unit is first filled ()The oily water mixture is then pumped through the inlet pipe into the coarse separating compartment.A with dirty waterB with clean waterC by oily waterD by mixed water

考题 单选题The time of discharging oil is short, but oily water separator discharges oil frequentlyThe possible reason is ()A the sensor of low oil level is fully covered by sludgeB the coarse strainer before the pump in suction system is cloggedC the screw pump is worn seriously and volumetric efficiency is decreasedD bilge suction value is clogged

考题 单选题During the PSC inspection, under the provisions of SOLAS 74, which one may not be regarded as clear grounds for ships’ detainment?()A excess amount of oily-water mixtures in bilgesB insulation of piping including exhaust pipes in engine room contaminated by oilC improper operation of bilge pumping arrangementsD there were an actual emergency

考题 单选题()are used to ensure that ships don’t discharge oil when pumping out oily water from any oil contaminated space.A BoilerB IncineratorC Oily water separatorD Sewage treatment unit

考题 单选题When water is used to fight a fire on board a ship,the effect of the weight of the water must be taken into account. How much sea water will increase the weight displacement by one ton?()A 64 cubic feetB 35 cubic feetC 100 gallonsD 500 liters

考题 单选题In which case is the IOPP Certificate of an inspected vessel NOT invalidated? ()A The required oily-water separator malfunctionsB The ship is transferred to Liberian registryC An annual survey is conducted fifteen months after the date of certificate issuanceD A 15 ppm oily-water separator is replaced by a 100 ppm oily-water separator