The creation ofa work breakdown structure (WBS) is the process of()the major project deliverables.
A

subdividing

B

assessing

C

planning

D

integrating


参考答案

参考解析
解析: 该题的关键词为"work breakdown structure、 major project deliverables",其语句结构为"The creation ofa work breakdown structure (WBS)(主语)is(谓语)the processof()the major project deliverables",含义为"创建WBS是怎样主要的项目交付物的过程"。根据WBS定义以及选项,容易识别出应选择分解(subdividing)
更多 “单选题The creation ofa work breakdown structure (WBS) is the process of()the major project deliverables.A subdividingB assessingC planningD integrating” 相关考题
考题 The work breakdown structure (WBS) is first developed in which scope management process?A . InitiationB . Scope planningC . Scope change controlD . Scope DefinitionE . Scope verification

考题 The Work Breakdown Structure (WBS) is the basis for communicating:A.Project scope, cost control, schedule, qualityB.Project objectives, dependencies, plan, cost controlC.Project scope, schedule, staffing, cost controlD.Project scope, quality, schedule, dependenciesE.Project budget, schedule, risk factors, work assignments.

考题 The work breakdown structure (WBS) is an excellent tool for objective control and evaluation. Which of the following is generally NOT validated through the WBS?A.Time, schedule and cost.B.Management coordination and organization structuring.C.Work methods and accountability.D.Quality of work.E.Risk and impact decision-making.

考题 The "control points" in the work breakdown structure used for isolated assignments to work centers are referred to as:A.Work packages.B.Subtasks.C.Tasks.D.Code of accounts.E.Integration points.

考题 106 The "control points" in the work breakdown structure used for isolated assignments to work centers are referred to as:A. Work packages.B. Subtasks.C. Tasks.D. Code of accounts.E. Integration points

考题 141 The work breakdown structure (WBS) is first developed in which scope management process? A. InitiationB. Scope planningC. Scope change controlD. Scope DefinitionE. Scope verification

考题 23 The work breakdown structure (WBS) is first developed in which scope management process? A. InitiationB. Scope planningC. Scope change controlD. ScopeDefinitionE. Scope verification

考题 ● When a project incorporates an Organizational Breakdown Structure (OBS), it is integrated with the WBS at theA taskB level of effortC sub-taskD projectE work package

考题 ● A work breakdown structure is most useful for:A identifying individual tasks for a projectB scheduling the start of tasksC developing a cost estimateD determining potential delaysE A and C

考题 ● A Work Breakdown Structure:A assures all work is identifiedB subdivides the project into manageable segmentsC provides the project sponsor with a time-phase task summaryD both A and BE All of the above.

考题 ● The Work Breakdown Structure (WBS) is the basis for communicating:A Project scope, cost control, schedule, qualityB Project objectives, dependencies, plan, cost controlC Project scope, schedule, staffing, cost controlD Project scope, quality, schedule, dependenciesE Project budget, schedule, risk factors, work assignments.

考题 ● The work breakdown structure (WBS) is an excellent tool for objective control and evaluation. Which of the following is generally NOT validated through the WBS?A Time, schedule and cost.B Management coordination and organization structuring.C Work methods and accountability.D Quality of work.E Risk and impact decision-making.

考题 ● The "control points" in the work breakdown structure used for isolated assignments to work centers are referred to as:A Work packages.B Subtasks.C Tasks.D Code of accounts.E Integration points.

考题 ● A work breakdown structure (WBS) is a tool used to define and group a project's discrete work elements in a way that helps organize and define the total work scope of the project. A WBS is most useful for(72) .(72)A.identifying individual tasks for a projectB.scheduling the start of tasksC.scheduling the end of tasksD.determining potential delays

考题 ● The work breakdown structure comprises several levels of decomposition of the total project. The lowest level of definition is always the (75) .(75)A. planning elementB.work packageC.subtaskD. working interface

考题 A schedule is commonly used in project planning and project portfolio management.(73) on a schedule may be closely related to the work breakdown structure(WBS)terminal elements.the statement of work.or a contract data requirements listA.EssencesB.ElementsC.PurposesD. Issues

考题 The work breakdown structure (WBS) has been widely used in management for software development project, ( ) is generally NOT validated through the WBS.A.Schedule and costB.Organization structuringC.Management coordinationD.Quality of work

考题 The creation of a work breakdown structure (WBS) is the process of______the major project deliverables.A.subdividingB.assessingC.planningD.integrating

考题 he work breakdown structure comprises several levels of decomposition of the total project. The lowest level of definition is always the()A.Planning element B.Work package C.Subtask D.Working interface

考题 A schedule is commonly used in project planning and project portfolio management.( ) on a schedule may be closely related to the work breakdown structure (WBS)terminal elements, the statement of work, or a contract data requirements list. A.Essences B.Elements C.Purposes D.Issues

考题 The creation of a work breakdown structure(WBS)is the process of ( ) the major project deliverables. A.subdividing B.assessing C.planning D.integrating

考题 为了把一个大的项目分解成多个较小的,更易于管理的项目,黑带此时应该选择以下哪个工具:()。A、结构分析图B、流程图C、WBS(Work Breakdown Structure)D、AND(Activity Network Diagram)

考题 组织分解结构(OBS Organizational Breakdown Structure)是一种特殊的WBS。

考题 The SOW (Statement of Work) is another name for the:()A、WBS (Work Breakdown Structure).B、cost benefit analysis.C、requirements specifications.D、narrative description of the work to be accomplished.

考题 Team member listing, scheduled tasks, and risk identification are part of the:()A、project plan.B、project charter.C、communication plan.D、WBS (Work Breakdown Structure).

考题 单选题The SOW (Statement of Work) is another name for the:()A WBS (Work Breakdown Structure).B cost benefit analysis.C requirements specifications.D narrative description of the work to be accomplished.

考题 判断题组织分解结构(OBS Organizational Breakdown Structure)是一种特殊的WBS。A 对B 错