网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
According to the regulations,to prevent excessive pressure buildup in cargo tanks containing LFG,they are fitted with().
A

pressure vacuum relief valves

B

excess flow valves

C

safety relief valves

D

flame screens


参考答案

参考解析
解析: 暂无解析
更多 “单选题According to the regulations,to prevent excessive pressure buildup in cargo tanks containing LFG,they are fitted with().A pressure vacuum relief valvesB excess flow valvesC safety relief valvesD flame screens” 相关考题
考题 To prevent excessive __ in the transverse girders, the tie bolts are positioned as close to the center of the crankshaft as possibleA.thermal stressesB.bending momentsC.thermal loadsD.surface tensions

考题 Low compressor head pressure in a refrigeration system can be caused by ___.A.insufficient condenser cooling waterB.excessive condenser cooling waterC.air in the refrigeration systemD.excessive refrigerant in the system

考题 Which of the following problems could cause the high pressure cutout switch to shut down the compressor in a refrigeration system?A.A shortage of liquid refrigerant.B.Excessive frost on the evaporator.C.Excessive condenser cooling water.D.Insufficient condenser cooling water flow.

考题 If a diesel engine turned over freely but failed to start, the cause could be ________.A.water in the fuelB.cold lube oilC.excessive starting air pressureD.excessive fuel pressure

考题 If a centrifugal pump is driven by a constant speed electric motor and produces a discharge pressure less than designed, the cause is probably ______.A.excessive pump speedB.excessive suction headC.worn wearing ringsD.gross pump misalignment

考题 According to the regulations,what type of gauging is required for a cargo of butadiene?A.OpenB.RestrictedC.ClosedD.None

考题 When loading a cargo of taconite,proper sequencing of loading by hatch number is necessary to ______.A.Provide the proper trimB.Prevent negative stability from developingC.Prevent excessive longitudinal stressesD.Control list

考题 The Database Resource Manager is automatically enabled in the maintenance window that runs the Automated Maintenance Task. What is the reason for this?()  A、 to prevent the creation of an excessive number of scheduler job classesB、 to allow the Automated Maintenance Tasks to use system resources without any restrictionC、 to allow resource sharing only among the Automated Maintenance Tasks in the maintenance windowD、 to prevent the Automated Maintenance Tasks from consuming excessive amounts of system resources

考题 单选题In () pump a closed discharge valve will not cause excessive pressure to build up.A gearB vaneC screwD centrifugal

考题 单选题An increase in diesel engine crankcase pressure generally indicates excessive()A compression pressureB lube oil header pressureC scavenge air pressureD piston ring blow-by

考题 单选题To avoid excessive surge pressure when bunkering, you should ()A bunker at a normal rateB check for kinks in hoseC close valves slowlyD shut valves before topping off

考题 单选题Excessive diesel engine back pressure may be an indication of ()A carbon buildup in the exhaust manifoldB overcooling of the exhaust manifoldC eroded muffler baffle platesD high injection pressure

考题 单选题Which of the following condition is likely to develop if the thermocouple element of a pyrometer becomes coated with excessive amounts of combustion by-products?()A Indicated exhaust pressure readings will increaseB Pyrometer responses will be retardedC Indicated cylinder temperature readings will increaseD Indicated firing pressure readings will increase

考题 名词解释题压力负荷过度(excessive pressure load)

考题 单选题Which of the following will take place if the clearance of the main bearings are excessive?()A bearing knocksB dropping of pressure of LOC noisesD all the above

考题 单选题Which of the following may take place if the clearance of the main bearings are excessive?()A bearing knocksB dropping of pressure of LOC noisesD all the above

考题 单选题If the head pressure of a reciprocating refrigeration compressor is excessive, ().A the relief valve should open before the high pressure cutoutB the relief valve should open and allow the excess refrigerant to flow to the receiverC the high pressure cutout switch should operate before the relief valve opensD you should close in on the suction valve

考题 单选题According to the regulations,what type of gauging is required for a cargo of butadiene? ()A OpenB RestrictedC ClosedD None

考题 单选题Excessive clearances in the main or crank-pin bearings will sometimes be indicated by () before any bearing knock is heard.A loss of flow in the fuel systemB loss of pressure in the air systemC loss of flow in the lubricating systemD loss of pressure in the lubricating system

考题 单选题An un-loader is installed on an air compressor to ().A bypass the high pressure stage to the low pressure stage on 100% of the air compressors in serviceB prevent excessive inter-stage pressure buildupC control compressor discharge pressureD remove all but the frictional load during starting

考题 单选题A swing check valve is used in a pipeline to ().A maintain a preset pressure on the lineB closely regulate the amount of flowC relieve excessive pressure on the lineD allow flow in one direction only

考题 单选题To prevent excessive () in the transverse girders, the tie bolts are positioned as close to the center of the crankshaft as possible.A thermal stressesB bending momentsC thermal loadsD surface tensions

考题 单选题According to regulations,a cargo hose used for transferring liquefied gases must have a bursting pressure of().A 5 times the maximum working pressure on the hose during cargo transferB one half the designed working pressureC 4 times the pressure of the cargo pump used for transferringD 5 times the minimum working pressure on the hose during cargo transfer

考题 单选题The Database Resource Manager is automatically enabled in the maintenance window that runs the Automated Maintenance Task. What is the reason for this?()A  to prevent the creation of an excessive number of scheduler job classesB  to allow the Automated Maintenance Tasks to use system resources without any restrictionC  to allow resource sharing only among the Automated Maintenance Tasks in the maintenance windowD  to prevent the Automated Maintenance Tasks from consuming excessive amounts of system resources

考题 单选题According to the ship regulations,the capacity of a liferaft is required to be marked().A on the station billB on a sign next to the liferaftC on the Certificate of InspectionD in the Operations Manual

考题 单选题To determine the pressure and temperature limitations under which LFG is required to be transported on a barge,you should look at the().A Certificate of InspectionB loading orderC rules and regulations for tankersD tankerman's document

考题 单选题According to the T-Boat regulations the reason for providing adequate ventilation for a battery storage area is to prevent().A accumulation of carbon dioxide gas that chokes the batteryB accumulation of explosive and toxic gases the battery can generateC mildew or dry rot in the battery boxD battery failure including battery case meltdown caused by excessive heat