单选题
Emergency generator is installed on board mainly to ()
A

connect to the busbar when the load increasing

B

supply power specially to charging panel

C

be put into operation during the ship arriving at or leaving port

D

ensure the power supply to critical equipment after the main switchboard out of power


参考答案

参考解析
解析: 暂无解析
更多 “单选题Emergency generator is installed on board mainly to ()A connect to the busbar when the load increasingB supply power specially to charging panelC be put into operation during the ship arriving at or leaving portD ensure the power supply to critical equipment after the main switchboard out of power” 相关考题
考题 describe the procedure to start an emergency generator ?

考题 The emergency generator or emergency battery is connected to _______on most large ships.A.distribution boardsB.section boardsC.emergency switch boardsD.main switch boards

考题 It ______ for an emergency generator to require paralleling.A.is not usualB.is usualC.is necessaryD.is not impossible

考题 Shipboard Oil Pollution Emergency Plan shall be carried on board by ______.A.Oil tanker of 150 gross tonnage and aboveB.Bulk carrierC.Container vesselD.Passenger ship

考题 A person may operate an air compressor in which of the following areas on board a tank barge ________.A.PumproomB.Generator roomC.A space adjacent to a cargo tankD.A space two meters from a cargo valve

考题 ()(除了) the fire drill, there are also boat drill and emergency drill on board.A、ExceptB、AlthoughC、In addition toD、But

考题 单选题()is not installed on the emergency switchboard.A Ammeter and changeover switchB Speed governor deviceC SynchroscopeD Wattmeter

考题 单选题()is not installed on the emergency switchboard.A AmmeterB VoltmeterC WattmeterD Synchroscope

考题 单选题Each emergency generator on a mobile offshore drilling unit,when tested,must be run under a full load for at least().A one hourB two hoursC ten hoursD four hours

考题 单选题For most diesel propulsion and generator engines, the over-speed trip device will stop the engine by ()A moving the governor control to stopB shutting off the lubricating oil supplyC tripping the governor emergency stop leverD shutting off the fuel supply

考题 单选题Prior to getting underway,the Master or person in charge of a vessel must().A conduct a fire drillB conduct a boat drillC log the fore and aft draft marksD test the emergency generator

考题 单选题A diesel driven emergency generator is prevented from being paralleled with the ships service generators by ()A an electrical interlock systemB an automatic paralleling trip switchC the synchronizing oscilloscopeD the reverse current relay

考题 单选题An emergency diesel generator should automatically shut down in the event of ()A dangerous over-speedingB a loss of lube oil pressureC activation of the fixed CO2 system for the emergency generator spaceD all of the above

考题 单选题Metal detectors were installed in 88 city schools, mainly to keep ______ out of Schools.A cell phonesB weaponsC alcoholD drugs

考题 单选题An emergency generator, driven by an internal combustion engine, shall be tested under load for a minimum of 2 hours at least once every ()A weekB 2 weeksC monthD 3 months

考题 单选题Which of the listed sections of an emergency switchboard is used to supply power for alarm signals under emergency conditions?()A The generator and bus transfer sectionB The 450 volt, 60 cycle, 3 phase busC The 120 volt, 3 phase, 60 cycle busD The 24 volt DC bus

考题 单选题The booster pump, which supplies diesel oil to() , should have a possibility of being powered by compressed air or by emergency power.A the main enginesB the auxiliary enginesC the emergency generator engineD the auxiliary engines and the main engine(s)

考题 单选题Shipboard Emergency Drills must be carried out at least()on board cargo ship.A Once every third yearB Once a monthC Once a yearD Once a week

考题 单选题()is not installed on the emergency switchboard.A Control panelB Paralleling panelC Load panelD Busbar

考题 单选题Standby or emergency diesel generator day tanks should always be kept full to reduce the possibility of()A sediment contaminationB fuel filter cloggingC moisture formationD inadequate transfer pump suction head

考题 单选题()is not a part of the main switch board.A Control panel of main generatorB Control panel of emergency generatorC Paralleling panelD Load panel of main generator

考题 单选题The emergency generator or emergency battery is connected to() on most large ships.A distribution boardsB section boardsC emergency switch boardsD main switch boards

考题 单选题Usually, emergency electricity supplies to on board()A Cargo winchB WindlassC Steering gearD Main air compressor

考题 单选题During the watch keeping at sea, at appropriate intervals inspection should be made of (), auxiliary machinery and steering gear spaces by the duty engineer.A the main propulsion plantB lifesaving jacketsC lifeboat engineD state of emergency generator

考题 单选题()(除了) the fire drill, there are also boat drill and emergency drill on board.A ExceptB AlthoughC In addition toD But

考题 单选题It () for an emergency generator to require paralleling.A is usualB is not usualC is necessaryD is not impossible

考题 单选题On a ship,each emergency generator must be tested at least once each().A weekB monthC three monthsD six months