It ______ for an emergency generator to require paralleling.

A.is not usual

B.is usual

C.is necessary

D.is not impossible


参考答案

更多 “ It ______ for an emergency generator to require paralleling.A.is not usualB.is usualC.is necessaryD.is not impossible ” 相关考题
考题 For most diesel propulsion and generator engines, the over-speed trip device will stop the engine byA.moving the governor control to stopB.shutting off the lubricating oil supplyC.tripping the governor emergency stop leverD.shutting off the fuel supply

考题 describe the procedure to start an emergency generator ?

考题 The emergency generator or emergency battery is connected to _______on most large ships.A.distribution boardsB.section boardsC.emergency switch boardsD.main switch boards

考题 All of the followings are the detainable deficiencies under the SOLAS Convention except ______.A.failure of proper operation of propulsion and other essential machinery, as well as electrical installationB.failure of the proper operation of the main and auxiliary steering gearC.failure of engineering watch arrangements to conform to the requirements specified for the ship by AdministrationD.failure of the proper operation of emergency generator, lighting, batteries and switches

考题 Fire protection regulations for towing vessels require that drills be conducted on board the vessel as if there were an actual emergency.Drills include all of the following,EXCEPT ______.A.testing all alarm and detection systemsB.breaking out and using the vessel's emergency equipmentC.participation by selected crew membersD.one person putting on protective clothing,if the vessel is so equipped

考题 单选题Each emergency generator on a mobile offshore drilling unit,when tested,must be run under a full load for at least().A one hourB two hoursC ten hoursD four hours

考题 单选题For most diesel propulsion and generator engines, the over-speed trip device will stop the engine by ()A moving the governor control to stopB shutting off the lubricating oil supplyC tripping the governor emergency stop leverD shutting off the fuel supply

考题 单选题Prior to getting underway,the Master or person in charge of a vessel must().A conduct a fire drillB conduct a boat drillC log the fore and aft draft marksD test the emergency generator

考题 单选题Fire protection regulations for towing vessels require that drills be conducted on board the vessel as if there were an actual emergency. Drills include all of the following,EXCEPT().A testing all alarm and detection systemsB breaking out and using the vessel's emergency equipmentC participation by selected crew membersD one person putting on protective clothing,if the vessel is so equipped

考题 单选题Which of the following is NOT true according to the passage?()A Both the main steering gear and the auxiliary steering gear should be operatedB The alarms fitted to the remote control system should be operatedC The emergency generator compartment should be checkedD The communication system between the bridge and the steering gear compartment should be operated

考题 单选题A diesel driven emergency generator is prevented from being paralleled with the ships service generators by ()A an electrical interlock systemB an automatic paralleling trip switchC the synchronizing oscilloscopeD the reverse current relay

考题 单选题An emergency diesel generator should automatically shut down in the event of ()A dangerous over-speedingB a loss of lube oil pressureC activation of the fixed CO2 system for the emergency generator spaceD all of the above

考题 单选题After resolving the trouble of main power supply, main switch of emergency generator should(), if power supply is refreshed.A be switched off by the duty officerB be switched on by the duty officerC be switched off automaticallyD be switched on automatically

考题 单选题An emergency generator, driven by an internal combustion engine, shall be tested under load for a minimum of 2 hours at least once every ()A weekB 2 weeksC monthD 3 months

考题 单选题Emergency generator is installed on board mainly to ()A connect to the busbar when the load increasingB supply power specially to charging panelC be put into operation during the ship arriving at or leaving portD ensure the power supply to critical equipment after the main switchboard out of power

考题 单选题()of the following need not be entered in the official logbook?A The testing of the internal combustion engine driven emergency generator at least once each month the vessel is navigatedB The testing of storage betteries for emergency lighting and systems once each 6 months the vessels is navigatedC The actual draft when the vessel arrives in salt water after department a portD The testing of the line-throwing appliance once every 3 months

考题 单选题Which of the listed sections of an emergency switchboard is used to supply power for alarm signals under emergency conditions?()A The generator and bus transfer sectionB The 450 volt, 60 cycle, 3 phase busC The 120 volt, 3 phase, 60 cycle busD The 24 volt DC bus

考题 单选题The booster pump, which supplies diesel oil to() , should have a possibility of being powered by compressed air or by emergency power.A the main enginesB the auxiliary enginesC the emergency generator engineD the auxiliary engines and the main engine(s)

考题 单选题All of the followings are the detainable deficiencies under the SOLAS Convention expert().A Failure of proper operation of propulsion and other essential machinery, as well as electrical installationB Failure of the proper operation of the main and auxiliary steering gearC Failure of engineering watch arrangements to confirm to the requirements specified for the ship by AdministrationD Failure of the proper operation of emergency generator, lighting, batteries and switches

考题 单选题Standby or emergency diesel generator day tanks should always be kept full to reduce the possibility of()A sediment contaminationB fuel filter cloggingC moisture formationD inadequate transfer pump suction head

考题 单选题()is not a part of the main switch board.A Control panel of main generatorB Control panel of emergency generatorC Paralleling panelD Load panel of main generator

考题 单选题The emergency generator or emergency battery is connected to() on most large ships.A distribution boardsB section boardsC emergency switch boardsD main switch boards

考题 单选题During the watch keeping at sea, at appropriate intervals inspection should be made of (), auxiliary machinery and steering gear spaces by the duty engineer.A the main propulsion plantB lifesaving jacketsC lifeboat engineD state of emergency generator

考题 单选题On a vessel making a voyage more than 48 hours long,regulations require that().A a lifeboat drill be held within 12 hours prior to departureB fire pumps be tested by starting within 12 hours prior to departureC the emergency generator and lighting system be tested by starting and operating within 12 hours prior to departureD the entire steering gear be tested within 12 hours prior to departure

考题 单选题It () for an emergency generator to require paralleling.A is usualB is not usualC is necessaryD is not impossible

考题 单选题On a ship,each emergency generator must be tested at least once each().A weekB monthC three monthsD six months

考题 单选题Coast Guard regulations require a shipboard Oil Pollution Emergency Plan to be reviewed().A annuallyB once every two yearsC once every four yearsD once every five years