网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
In the event of minor emergencies when the machinery spaces unattended () will be informed of malfunction in the machinery by his cabin monitor.
A

the chief engineer

B

the engineer on cabin watch

C

the bridge officer on watch

D

the master


参考答案

参考解析
解析: 暂无解析
更多 “单选题In the event of minor emergencies when the machinery spaces unattended () will be informed of malfunction in the machinery by his cabin monitor.A the chief engineerB the engineer on cabin watchC the bridge officer on watchD the master” 相关考题
考题 But an event in my life when I was 17 years old changed my perspective on what it takes to be inspirational.

考题 The researchers have conducted an experiment to prove that people will act in emergencies when ______A) they are in pairsB) they are in groupsC) they are aloneD) they are with their friends

考题 The officer in charge of the engineering watch shall notify the chief engineer without delay ____.A.in any emergency or if in any doubt as to what decision or measures to takeB.in the event of any impending action in machinery spaces that may cause reduction in ship's speedC.when isolating and bypassing machinery to be worked onD.co-operating with any engineer in charge of maintenance work

考题 In the event of fire in a machinery space,______.A.the fixed carbon dioxide system should be used only when all other means of extinguishment have failedB.the fixed carbon dioxide system should be used immediately,as it is the most efficient means of extinguishmentC.water in any form should not be used as it will spread the fireD.the space should be opened 5 minutes after flooding CO2 to prevent injury to personnel

考题 For which three events can web application event listeners be registered?()A、When a session is createdB、After a servlet is destroyedC、When a session has timed outD、When a cookie has been createdE、When a servlet has forwarded a requestF、When a session attribute value is changed

考题 单选题When to remove scale from the cooling spaces, acid solution () in the system can be tested from time to time by putting some on to a piece of lime.A strengthB denseC percentageD velocity

考题 单选题When under maneouvring conditions with the machinery being manually operated the control unit or console should be ()A automatically controlledB continuously mannedC off powerD none of the above is true

考题 单选题The officer in charge of the engineering watch shall notify the chief engineer without delay ().A in any emergency or if in any doubt as to what decision or measures to takeB in the event of any impending action in machinery spaces that may cause reduction in ship’s speedC when isolating and bypassing machinery to be worked onD co-operating with any engineer in charge of maintenance work

考题 单选题To receive oil residues from the purification of fuel and lubricating oils in the machinery spaces, what kind of tank(s) should be provided on board?()A bilge tankB sludge tankC overflow tankD oil collecting tank

考题 单选题Explosive and flammable gasses are most likely to be encountered on a vessel().A at any locationB on the drill floor and liquid mud handling areasC in bulk storage tanksD in machinery spaces

考题 单选题An Information Technology (IT) staff has many calls from users who are unable to print or who lose print jobs.  After investigation, the IT staff has determined that the print spooler is stopping sporadically.  Which of the following actions in IBM Director would best resolve the issue?()A Create an Event Action Plan to monitor the NT Event Log for Print Spooler errors.Set a task to restart the print spooler when stopped.Apply this plan to print servers.B Using Event Management, create an Event Action Plan with a print spooler filter and set a task to restart the print spooler when stopped.  Apply this plan to print servers.C Using Resource Manager, create a threshold to monitor the print spooler queue.Create an Event Action Plan with a print spooler filter and set a task to restart the print spooler when the queue gets above 10 jobs.Apply this plan to print servers.D Using Process Management, create a threshold to monitor to set an error condition when the print spooler has stopped.Create an Event Action Plan using this filter and create a task to restart the print spooler when stopped. Apply plan to print servers.

考题 单选题When the vessel arrives, the cargo of machinery to be unloaded is().A transpored to the ships sideB transported into the shedC lashed and securedD delivered to the consignor

考题 单选题During inspection of oil and oily mixtures from machinery spaces, which of the following factors should be taken into account by the PSCO? ()A The quantity of oil residues generatedB The capacity of sludge and bilge water holding tankC The capacity of the oily water separatorD All of the above

考题 单选题Regulations require that pumprooms on tank vessels carrying grade C liquid cargo with machinery spaces below the freeboard deck be ventilated with().A power ventilationB gooseneck vents and flame screensC at least two ducts extending to the weather deckD a vent header system

考题 单选题Each fire hydrant serving machinery spaces containing oil fired boilers,internal combustion machinery,or oil fuel units must be equipped with a().A fireman's outfitB low-velocity spray applicatorC marine strainerD pick axe

考题 单选题When the chief engineer is in the machinery spaces, the officer in charge of the engineering watch shall()A continue to be responsible for machinery space operations despite the presence of the CEB hand over the responsibility activelyC be responsible for the watching together with the chief engineerD assistant the chief engineer to control the machinery

考题 单选题When the machinery spaces are in the periodic unmanned condition, shall be immediately available and on call to attend the machinery space().A the chief engineerB the designated engineer from shipyardC the designated duty officer in charge of the engineering watchD the designated surveyor from classification society

考题 单选题The guard, fencing or shielding for moving parts or machinery can be removed for repair only when the machinery it belongs to()A stays at restB is working stablyC is worn outD is in good operation

考题 单选题Before wore is commenced()the officer responsible should ensure that power is shut off and warning notices posted on the bridge and in the machinery spaces.A near the ship’s whistleB on the funnelC in the vicinity of radio aerialsD near the radar scanner

考题 单选题Which of the following operations must be entered on the Oil Record Book Part Ⅰ? () Ⅰ.Routine discharge at sea of bilge water containing oil from the machinery spaces Ⅱ.Bunkering of fuel oilA Ⅰ onlyB Ⅱ onlyC both Ⅰ and ⅡD neither Ⅰ nor Ⅱ

考题 单选题Long hair should always be covered by()when working with or near moving machinery.A a helmentB safety capC an ear plugD face mask

考题 单选题The sections of an Oil Record Book proceeding the log pages contain a ().A damage control plan for isolating fire main valvesB list of machinery space operation itemsC complete classification of hazardous materialsD detailed listing of all organizations to call in the event of an accidental oil spill

考题 单选题按照SOLAS的油船货油舱的隔离的要求:Cargo pump-rooms, cargo tanks, slop tanks and cofferdams shall be positioned forward of machinery spaces. However, oil fuel bunker tanks need not be forward of machinery spaces. Cargo tanks and slop tanks shall be isolated from machinery spaces by cofferdams, cargo pump-rooms, oil bunker tanks or ballast tanks. Pump-rooms containing pumps and their accessories for ballasting those spaces situated adjacent to cargo tanks and slop tanks and pumps for oil fuel transfer, shall be considered as equivalent to a cargo pump-room within the context of this regulation provided that such pump rooms have the same safety standard as that required for cargo pump-rooms.问:对于某29.7万载重吨的VLCC船型,关于货油舱的隔离,下列哪一项不必位于机器处所的前方:()A 货油泵舱;B 货油舱;C 污油舱(SLOP TANK);D 燃油舱

考题 单选题There shall be()into sleeping rooms from cargo and machinery spaces or from galleys,storerooms,drying rooms or communal sanitary areas.A no direct openingsB direct openingsC no more than one direct openingD up to one direct opening

考题 单选题When the engine room is put in standby condition, the engineer in charge of the watch need not to()A ensure all machinery which may be used during maneuvering is in readyB ensure an adequate reserve of power is available for steering gear and other requirementsC keep the main propulsion unit controls continuously attended when in the manual mode of operationD ensure all machinery which may be used during maneuvering is running stably

考题 单选题During the watch keeping at sea, at appropriate intervals inspection should be made of (), auxiliary machinery and steering gear spaces by the duty engineer.A the main propulsion plantB lifesaving jacketsC lifeboat engineD state of emergency generator

考题 单选题Deck machinery, which is also known as hull machinery, includes all power driven equipment located ()the machinery spaces that is () with the main propulsion plant.A inside;associatedB inside;not associatedC outside;associatedD outside;not associated