The rate of heat transfer in a water-tube auxiliary boiler can be increased by ().
A

operating the boiler at less than normal water level

B

installing fins on the firesides of water-tubes

C

increasing the amount of excess air to the burners

D

treating the boiler water with chemical oxygen scavengers


参考答案

参考解析
解析: 暂无解析
更多 “单选题The rate of heat transfer in a water-tube auxiliary boiler can be increased by ().A operating the boiler at less than normal water levelB installing fins on the firesides of water-tubesC increasing the amount of excess air to the burnersD treating the boiler water with chemical oxygen scavengers” 相关考题
考题 A bypass line provided around a waste heat auxiliary boiler in a diesel engine exhaust system, may be used to avoid boiler ______.A.corrosion at low engine loadsB.erosion at high engine loadsC.overload at high engine loadsD.scaling at all exhaust temperatures

考题 单选题One advantage of dry cylinder liners used in a diesel engine is the()A lower thermal expansion rates than wet linersB greater heat transfer rate than wet linersC greater wear resistance than wet linersD procedure to replace dry liners is simpler than for wet liners

考题 单选题What is NOT a function of the steam drum of a marine water-tube boiler().A Receives saturated steam from the generating tubesB Serves as a reservoir of boiler feed waterC Holds internal fittings for separation of moisture from steamD Collects steam exhausted from the turbines

考题 单选题In readying an auxiliary water-tube boiler for a routine hydrostatic test, which of the following procedures should be undertaken prior to filling the boiler with fresh water?()A The safety valve escape piping should be disconnected from the valve body and a blank insertedB The boiler vent valves should be openedC All hand-hole/manhole covers should be tightened up as much as possible to preclude any leaksD All of the above

考题 单选题In the event of a flame failure in an auxiliary water-tube boiler, you must()A relight the boiler immediately to prevent loss of steam pressureB relight the fire off the brickwork as the bricks are cherry redC purge the furnace of any combustible gases before attempting to relight the fireD speed up the feed pump to prevent dry firing when the burner flame is reestablished

考题 单选题In readying an auxiliary water-tube boiler for a routine hydrostatic test, which of the following procedures should be undertaken prior to filling the boiler with fresh water?()A The safety valve escape piping should be disconnected from the valve body and a blank insertedB The boiler vent valves should be openedC All handhole/manhole covers should be tightened up as much as possible to preclude any leaksD All of the above

考题 单选题Bottom blow valves are installed on auxiliary water-tube boilers to ()A remove suspended and precipitated solids from the boiler waterB completely drain the boiler in an emergency situationC prevent hardened scale deposits in the water drumD remove floating impurities from the oily water surface

考题 单选题Which of the statements listed concerning heat transfer is correct?()A Heat is always transferred at a constant rateB Heat transfer rate increases as temperature difference increasesC The rate of heat transfer is not affected by temperature differenceD The high temperature region is known as a heat sink

考题 单选题The rate of heat transfer from a hot region to a cold region is affected most by the ().A size of the heat sinkB temperature difference between the regionsC size of the heat sourceD total heat of the system

考题 单选题Which of the following statements is correct concerning heat transfer?()A Heat is given off from a high temperature region known as a heat sinkB Heat transfer rate is affected most by the size of the heat sink involvedC Heat transfer rate is affected most by the temperature difference between the heat source and the heat sinkD Heat transfer by radiation will occur only by mass motion of a fluid substance

考题 单选题The rate of heat transfer between the hot and cold fluids passing through a shell-and-tube type heat exchanger will ().A remain constant along the tubes lengthB be greatest in a single pass counter flow heat exchangerC remain constant throughout the heat exchangerD vary from section to section through out the heat exchanger

考题 单选题The purpose of designing some waste heat boilers with sinuous fire tubes, is to()A increase exhaust gas velocity through the boilerB reduce accumulations of carbon deposits on the heat transfer surfacesC eliminate exhaust gas pulsations and noiseD increase the rate of heat transfer to the waterside

考题 单选题The water in an auxiliary boiler should be tested daily for ().A dissolved oxygenB chloridesC sludgeD dissolved nitrogen

考题 单选题Diesel engine waste heat boiler construction is usually of the fire-tube or()A cyclone furnace boiler typeB dry back boiler typeC water-tube typeD critical circulation boiler type

考题 单选题The fuel supply system to an automatic auxiliary boiler, will be automatically shutdown if the boiler ()A salinity is abnormally highB steam demand is too highC water level is abnormally lowD feedwater flow is low

考题 单选题Generating tubes in waste heat boilers are finned to ().A reduce gas flow turbulenceB prevent exhaust gas corrosionC increase the rate of combustionD increase the rate of heat transfer

考题 单选题The fuel oil supply system to an automatic auxiliary boiler, will automatically shutdown if the boiler ()A steam demand is highB salinity is highC safety valve simmersD burner flame is extinguished

考题 单选题Exhaust pipes for separate diesel engines can be combined only when ()A space limitations prevent separately run pipesB the engines are small auxiliary unitsC they are arranged to prevent gas backflow to each engineD a waste heat boiler is installed

考题 单选题Fins are installed on the fireside of water-tubes used in waste boiler to()A decrease the velocity of gases flowing past the tubesB increase the rate of heat transferC reduce accumulations carbon depositsD direct the flow of gases

考题 单选题A () boiler is an auxiliary boiler sometimes included in a steamships installation for supplying steam to auxiliaries in port.A monkeyB donkeyC waste heatD main

考题 单选题Fins are installed on the generating tube surfaces in waste heat boilers to ().A prevent soot fires in the exhaust systemB prevent exhaust gas erosion of the tubesC increase the velocity of exhaust gas flowD increase the rate of heat transfer

考题 单选题Which of the lists forms of heat transfer, if any, is illustrated by the flow of combustion gases through a boiler?()A Natural convection onlyB Forced convection onlyC Both natural convection and forced convectionD None

考题 单选题The boiler water alkalinity in a coil-type auxiliary boiler should be maintained at the pH recommended by the boiler manufacturer to()A precipitate silica from solutionB reduce corrosion in the heating coilC prevent clogging and erosion in the coilD maintain zero water hardness

考题 单选题Excessive alkalinity of the water in an auxiliary boiler can cause ().A caustic embrittlement of the boiler metalB acidic corrosion of the boiler metalC hard scale deposits on the boiler tubesD etching of the heat exchange surfaces

考题 单选题Bottom blow valves are installed on auxiliary water-tube boilers to ()A completely drain the boiler in an emergencyB prevent sludge from forming in the drumC remove floating impurities from the boiler water surfaceD remove settled solids from the water drum

考题 单选题If the feed pump for an auxiliary boiler fails to deliver the feed water to the boiler, the cause maybe ().A high steam pressure in the boilerB abnormally high feed water temperatureC abnormally high boiler water temperatureD steam demand exceeding feed pump capacity

考题 单选题Before an auxiliary boiler is shutdown for an extended period of time, the water in the boiler should have a pH value of ().A 10B 7C 4D 1