网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
Generating tubes in waste heat boilers are finned to ().
A

reduce gas flow turbulence

B

prevent exhaust gas corrosion

C

increase the rate of combustion

D

increase the rate of heat transfer


参考答案

参考解析
解析: 暂无解析
更多 “单选题Generating tubes in waste heat boilers are finned to ().A reduce gas flow turbulenceB prevent exhaust gas corrosionC increase the rate of combustionD increase the rate of heat transfer” 相关考题
考题 5 The directors of Blaina Packaging Co (BPC), a well-established manufacturer of cardboard boxes, are currentlyconsidering whether to enter the cardboard tube market. Cardboard tubes are purchased by customers whoseproducts are wound around tubes of various sizes ranging from large tubes on which carpets are wound, to smalltubes around which films and paper products are wound. The cardboard tubes are usually purchased in very largequantities by customers. On average, the cardboard tubes comprise between 1% and 2% of the total cost of thecustomers’ finished product.The directors have gathered the following information:(1) The cardboard tubes are manufactured on machines which vary in size and speed. The lowest cost machine ispriced at $30,000 and requires only one operative for its operation. A one-day training course is required in orderthat an unskilled person can then operate such a machine in an efficient and effective manner.(2) The cardboard tubes are made from specially formulated paper which, at times during recent years, has been inshort supply.(3) At present, four major manufacturers of cardboard tubes have an aggregate market share of 80%. The currentmarket leader has a 26% market share. The market shares of the other three major manufacturers, one of whichis JOL Co, are equal in size. The product ranges offered by the four major manufacturers are similar in terms ofsize and quality. The market has grown by 2% per annum during recent years.(4) A recent report on the activities of a foreign-based multinational company revealed that consideration was beinggiven to expanding operations in their packaging division overseas. The division possesses large-scale automatedmachinery for the manufacture of cardboard tubes of any size.(5) Another company, Plastic Tubes Co (PTC) produces a narrow, but increasing, range of plastic tubes which arecapable of housing small products such as film and paper-based products. At present, these tubes are on average30% more expensive than the equivalent sized cardboard tubes sold in the marketplace.Required:(a) Using Porter’s five forces model, assess the attractiveness of the option to enter the market for cardboardtubes as a performance improvement strategy for BPC. (10 marks)

考题 第二组The only attention that heat exchanger should require is to ensure that the heat transfer surfaces remain substantially clean and the flow passages generally clear of obstruction. Indication that undue fouling is occurring is given by a progressive increase in the temperature difference between the two fluids, over a period of time, usually accompanied by a noticeable rise in pressure loss at a given flow.Fouling on the sea-water side is the most usual cause of deterioration in performance. The method of cleaning the sea water-side surfaces depends on the type of heat exchanger. With shell-and-tube heat exchangers, the removal of the header covers or, m the case of the smaller heat exchangers, the headers themselves, will provide access to the tubes. Obstructions, dirt, scale etc., can then be removed, using the tools provided by the heat exchanger manufacturer. Flushing through with fresh water is recommended before a heat exchanger is returned to service. In some applications, such as piston oil cooling, progressive fouling may take place on the outside of the tubes. Most manufactures recommend a chemical flushing pr6cess to remove this in situ~ without dismantling the heat exchanger.Plate heat exchangers may be cleaned by unclamping the stack of plates and mechanically cleaning the surface of each plate as recommended by the manufacturers. The plate seals may require replacement from time to time and here the manufacturers instructions should be closely followedBy which of the following indication, can we conclude that the lube oil-sea water heat exchanger is unduly fouled?A.the heat exchanger lube oil inlet temperature loweringB.the heat exchanger sea-water outlet pressure riseC.the heat exchanger temperature difference between lube oil and sea water increasingD.the heat exchanger pressure difference between sea water inlet and outlet decreasing

考题 What is the most usual reason for the fresh water-sea water heat exchanger fouling in the sea side?A.lube oil sludge accumulating in itB.dirt and scale etc , formed on the surfacesC.deformation of the tubes and the shell or the platesD.lube oil leakage into sea-water side

考题 The maximum pressure developed by a waste heat boiler is determined by the main engine exhaust ______.A.gas compositionB.gas temperatureC.pressureD.timing

考题 A bypass line provided around a waste heat auxiliary boiler in a diesel engine exhaust system, may be used to avoid boiler ______.A.corrosion at low engine loadsB.erosion at high engine loadsC.overload at high engine loadsD.scaling at all exhaust temperatures

考题 单选题Before shutting off the fuel supply to stop a medium or high–speed diesel engine, why is it necessary to allow the engine to idle for a few minutes?()A To prevent internal damage form local overheatingB To ensure the fuel nozzles are flushed cleanC To clear the smoke stackD To let the waste heat boiler reduce its rate of steam generation

考题 单选题Which of the following items is necessary for all waste heat boiler installations, regardless of design or manufacturer? ()A Control of evaporationB A separate means to prevent feed-water contaminationC Power circulating pumpD Super-heater

考题 单选题Which of the diesel engine cylinder liners listed has internal cooling water passages?()A Internally finned linerB Externally finned linerC Wet linerD Integral water-jacket liner

考题 单选题An exhaust gas bypass is installed on a waste heat boiler in order to ().A bypass exhaust gas at high loads to prevent excessive back pressureB bypass a portion of the exhaust gas at peak loads for better efficiencyC recycle exhaust gas to the turbochargerD minimize moisture condensation in the boiler gas passages at low loads

考题 单选题The diesel engine exhaust gas bypass, as fitted with some waste heat boilers, is installed to ()A prevent engine back pressure at heavy loadsB increase total engine efficiency at low loadsC prevent boiler corrosion at low engine loadsD improve engine fuel consumption at any load

考题 单选题If the jacket water temperature of an operating diesel engine suddenly rises above normal, the cause can be attributed to ().A an overfilled expansion tankB excess chromate treatment of the jacket waterC a clogged raw water sea suctionD cavitation erosion of the heat exchanger tubes

考题 单选题Waterside scale in a fire-tube boiler may cause ().A increased heat transferB fireside erosionC high steam demandD overheated tubes

考题 单选题The rate of heat transfer between the hot and cold fluids passing through a shell-and-tube type heat exchanger will ().A remain constant along the tubes lengthB be greatest in a single pass counter flow heat exchangerC remain constant throughout the heat exchangerD vary from section to section through out the heat exchanger

考题 单选题The purpose of designing some waste heat boilers with sinuous fire tubes, is to()A increase exhaust gas velocity through the boilerB reduce accumulations of carbon deposits on the heat transfer surfacesC eliminate exhaust gas pulsations and noiseD increase the rate of heat transfer to the waterside

考题 单选题Diesel engine waste heat boiler construction is usually of the fire-tube or()A cyclone furnace boiler typeB dry back boiler typeC water-tube typeD critical circulation boiler type

考题 单选题Which of the following statements concerning fire-tube boilers is correct?()A Combustion gases flow through the tubesB Flames impinge on the tubesC Combustion occurs in the tubesD Water flows through the tubes

考题 单选题The maximum pressure developed by a waste heat boiler is determined by the main engine exhaust ().A gas compositionB gas temperatureC pressureD timing

考题 单选题Exhaust pipes for separate diesel engines can be combined only when ()A space limitations prevent separately run pipesB the engines are small auxiliary unitsC they are arranged to prevent gas backflow to each engineD a waste heat boiler is installed

考题 单选题Fins are installed on the fireside of water-tubes used in waste boiler to()A decrease the velocity of gases flowing past the tubesB increase the rate of heat transferC reduce accumulations carbon depositsD direct the flow of gases

考题 单选题The heat used to change a liquid to a vapor is called ().A latent heat of fusionB latent heat of vaporizationC specific heat of vaporizationD latent heat of the gas

考题 单选题In motor ship, () is often used to recover some of the heat carried in the exhaust gases from the main engine.A an diesel oil heaterB a waste heat boilerC a fresh water generatorD all the above

考题 单选题Fins are installed on the generating tube surfaces in waste heat boilers to ().A prevent soot fires in the exhaust systemB prevent exhaust gas erosion of the tubesC increase the velocity of exhaust gas flowD increase the rate of heat transfer

考题 单选题Which of the following equipment can not be used for the waste heat recovery of the M/E to further improve its thermal efficiency?()A M/E turbochargerB exhaust gas boilerC incineratorD fresh water generator

考题 单选题The PRIMARY function of a waste heat boiler is to ().A reduce engine exhaust noiseB reduce engine back pressureC recover heat which otherwise would be lostD increase turbocharger efficiency

考题 单选题To avoid impingement attack, care must be taken with the water () through the tubes of the heat exchangers.A temperatureB velocityC densityD viscosity

考题 单选题A waste heat boiler is installed on some diesel propelled vessels to ().A provide steam for emergency propulsionB provide steam for the turbo-generatorC heat the waste water tanksD steam for warming engines

考题 单选题A SECONDARY function of a waste heat boiler is to ().A reduce engine exhaust noiseB reduce engine back pressureC increase engine cycle efficiencyD increase turbocharger efficiency