站内搜索
IBM(000-151) 问题列表
问题
单选题A large customer CIO mentions a friend has used BR to tremendously improve their operations. Which resources would assist the sales professional to develop this opportunity of the following?()A
Storage SpecialistB
System ArchitectC
Resilience SpecialistD
Techline
问题
单选题A customer is considering BladeCenter H and S chassis. Which of the following is a reason to implement BladeCenter H?()A
Support for10Gb internal networkB
Support for SSDC
Support for integrated disk drivesD
Support for8Gb FC Switch Modules
问题
单选题A manufacturing customer has an IBM BladeCenter H chassis with four, HX5 with MAX5 4-socket blades installed. Each blade has the optional Fibre Channel Expansion card. The customer wants redundancy and is going to install the following configuration: (1)two Brocade 20-Port SAN Switch Modules (2)two Nortel Networks 1/10 GB Uplink ESM (3)a redundant AMM What is the minimum number of power supplies needed for this configuration to have full redundancy?()A
4B
3C
2D
8
问题
单选题A prospect is considering a BladeCenter H chassis with the Multi-Switch Interconnect Modules. The number of Ethernet ports is important to them. What is the maximum number of Ethernet ports of an HS22 blade server can support if the blade does not have any expansion blades attached?()A
8B
6C
4D
2
问题
单选题A retail company plans to consolidate 180 existing dual processor Xeon servers, all running a web server application on Windows Server 2003. They are planning consolidating to a single x3950 X5 running vSphere. Which of the following should be discussed with this customer?()A
Consider two servers for redundancy and failoverB
Web content static or dynamic informationC
Processor utilization of the existing web serversD
SCSI orFibre Channel storage solution
问题
单选题When selling against competition, which focus on the iDataPlex value proposition of the following?()A
Superior chip densityB
Balance performance, cost, and power and cooling efficiencyC
Flexible configurations ready for integration and testing at the customer locationD
Standard rack mounting
问题
单选题A prospective client needs to combine Ethernet, FCOE, and iSCSI.They have not been able to practically combine these in the past.Which IBM products meets this need of the following?()A
BladeCenter Open Fabric Manager (BOFM)B
SAN Volume Controller (SVC)C
Virtual Fabric forBladeCenterD
Network Provisioning on Demand in the AMM
问题
单选题A client is experiencing bottlenecks in their IT environment. Which response address this issue of the following?()A
Meet with Operations ManagerB
Perform Scorpion StudyC
Meet with CFOD
Perform CDAT Study
问题
单选题A University customer has a BladeCenter H fully populated with LS21 Blades, a single AMM, and four power modules. The BladeCenter has been running flawlessly for three months. One day an administrator discovers that they cannot view video on blades 9-12 either locally or remotely even though they still appear to be running. The video works on all of the other blades. Which of the following is the cause of the video problem?()A
A power module has failed and there is not enough power to see video on all blades.B
MUX 3 on theBladeCenter backplane has failed.C
A firmware update is required on the AMM.D
A second AMM is required to view video on blades 9-14.
问题
单选题A customer has the following equipment installed in their data center: (1)an IBM BladeCenter H chassis (2)two power supplies (3)six HS22V blades (4)three Nortel 1/10 GB ESMs The retail customer purchased a new HX5 with MAX5. Which of the following must be added to install the HX5 with MAX5?()A
Two additional power suppliesB
Fibre Channel (FC) switches and SAN storageC
A Nortel 1/10 GB ESMD
SSD for the HX5
问题
单选题A customer has successfully upgraded their System x servers. Now the are very concerned about their applications. They have a historical collection of various applications that do not interact. Which of the following should the sales professional suggest?()A
Rewrite applications using Linux to limit licensing feesB
Port applications toanAIX or UNIX server to conserve energy and floor spaceC
SAP or similar all encompassing applicationsD
Webenable all applications
问题
单选题A System x administrator is considering new storage subsystems. Which is a benefit of SAS over Solid State of the following?()A
Higher transfer speedsB
Increased power consumption with Solid StateC
Increased bandwidthD
Cost per MB
问题
单选题A prospective customer has selected Fiber Channel (FC) for performance reasons. The prospect does not appear to understand the terminology and options of the fiber channel but is very interested in learning before investing money in this technology. What steps should be taken to make sure the customer is satisfied with the solution?()A
Send customer links to documentation for the FC components included in the solutionB
Direct the customer to Red Books and White Papers on FC technologiesC
Work with business partner to include Lab Services engagement to setup FC environment and perform knowledge transferD
Switch toiSCSI
问题
单选题An insurance customer installs two BladeCenter chassis in a rack with glass doors. After a short time, the blowers in both BladeCenters increase to full speed, and then one fails. Apart from replacing the broken blower, which additional action is required for a long term fix of the following?()A
Add Rear Door HeateXchangerB
Add fans to the top of the racksC
Increase circulation from Data Center raised floorD
Change to perforated doors
问题
单选题A customer is concerned that the Windows server virtualization solution discussed with them seems to be too leading edge. They are not comfortable with new technology. What information could be supplied to provide industry trends and directions of the solution of the following?()A
Server ProvenB
xREFC
Client referencesD
IBM White Papers