问题 单选题A customer requires their application to have high availability within a data center, and also the ability to recover at a data center located 600km away in the event of an outage. Which system software solution component supports the customer requirement?()A PowerHA SystemMirror Basic EditionB PowerHA SystemMirror Express EditionC PowerHA SystemMirror Standard EditionD PowerHA SystemMirror Enterprise Edition

问题 单选题Which operating system can directly host managed storage for IBM i, AIX, Linux, VMware and Windows on a Power Systems server?()A AIXB IBMiC LinuxD VIO Server

问题 单选题A customer has several single partition POWER5 and POWER6 processor-based systems housed in regional data centers and wants to consolidate into a single Power 770. They must minimize overall cost and the number of adapters, while ensuring a reliable infrastructure. Which solution addresses the customer requirements?()A Move the storage into a common SAN and virtualize the I/O using a single VIO Server with dual NIC connectors and dual HBAsB Move the existing physical network and storage adapters to the new system and virtualize the I/O using a single VIO Server.C Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, each with dual NIC connectors and dual HBAs.D Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, one with dual NIC connectors and the other with dual HBAs.

问题 单选题Which of the following provide for higher system availability on a single CEC Power 770 or Power 780?()A Redundant system clockB Redundant service processorC POWER7 cores include redundant L3 cachesD Main memory DIMMs contain an extra DRAM chip for improved redundancy

问题 单选题A customer is unsure how POWER7 processors can outperform POWER6 processors when the clock speeds are slower. What contributes to the improved performance?()A Added Turbo memory switchingB Removed internal OLTP limitsC Moved L3 cache onto the chipD Increased DDR2 memory speeds

问题 单选题A system is being designed with many LPARs which will be clients of dual VIO Servers. The VIO Servers must be redundant so that, in the event of scheduled maintenance, the clients do not need to be shut down. Which of these strategies could be used to ensure that the client LPARs continue to be able to use the network in the event of a VIO Server being shut down?()A ImplementPowerHA SystemMirror on both VIO servers.B ConfigureEtherchannel between the client LPARs and the two VIO serversC Configure Network Interface Backup between the two VIO servers and use each VIO server to access the network.D Implement Shared Ethernet Adapter failover and have all client partitions access the network through the shared adapters.

问题 单选题What is the correct stage in the sales process for a Pre-Sales Technical  Delivery Assessment (TDA)? ()A Before the first solution design meeting with the customerB After the solution design proposal is submitted to manufacturing for reviewC Once the customer has supplied the solution design specifications to the sales teamD After the solution design is completed and before the proposal is submitted to the customer

问题 单选题Using the following information: Performance data from an existing system that a new system will replace; Performance estimates that anticipate future workloads; Micro-partitioning and logical partitioning implementations. Which of the following allows a technical sales representative to create a system design which can be imported into an HMC?()A IBMeConfigB IBM Performance MonitorC IBM Workload Estimator (WLE)D IBM System Planning Tool (SPT)

问题 单选题A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()A All the machines can be connected to the existing HMC, as long as it is updated to code level 7.7.1 or laterB The Power 770 requires an HMC (7042-CR5 or later), so they must buy one. All of the systems can be managed by this new HMCC They should buy a new HMC for the Power 770 system, and leave the POWER5 and POWER6 based systems connected to the existing oneD The Power 770 requires an HMC, so they should connect the Power 770 to the HMC and convert the POWER5 and POWER6 based servers to IVM

问题 单选题A Power 720 customer using IVM wants to implement dual VIO servers, but is unable to create the second server. What is the most likely reason for this?()A An HMC is required for dual VIO servers.B Dual VIO servers require a split backplane.C A dual VIO enablement code must be entered from the ASMI interface.D The second VIO server must be created using the IVM command line interface.

问题 单选题Which of the following is included in IBM Systems Director Express Edition?()A Energy managementB Virtual image deploymentC Virtual resource managementD Networking device management

问题 单选题A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()A PowerVM Standard EditionB VMControl Standard EditionC Hardware Management ConsoleD IBM Systems Director Standard Edition

问题 单选题Which of the following includes Active Memory Sharing (AMS)?()A PowerHA Enterprise EditionB PowerVM Enterprise EditionC VMControl Enterprise EditionD Systems Director Enterprise Edition

问题 单选题A customer is consolidating seven IBM i partitions onto a POWER7 system, using VIO Server to virtualize resources.Which of the following PowerVM editions is appropriate for this customer?()A IBM i EditionB Express EditionC Standard EditionD Enterprise Edition

问题 单选题A customer is planning on having a single Virtual I/O Server (VIOS) configuration in a Power 750. They haveselected a 4-port 1Gb Integrated Virtual Ethernet (IVE). There will be no other network cards installed in the system. One IVE logical port will be used in the VIO Server and will be used as the physicalport in a Shared Ethernet Adapter (SEA). What is the maximum number of IVE logical ports available to use inother LPARs?()A 1B 7C 15D 31