网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
A customer wants to migrate their existing cluster onto new POWER6 hardware, and in addition requires thecluster to be migrated from PowerHA version 5.3 to 5.5. Given that AIX 6.1 and PowerHA 5.5 filesets arealready installed in the new hardware, which of the following methods would allow the customer to maintaintheir current cluster configuration?()
A

Add the new nodes to the existing cluster, and perform a rolling migration and remove the original nodesfrom the cluster

B

Add the new nodes to the existing cluster, and perform a non-disruptive upgrade and remove the originalnodes from the cluster.

C

Create a snapshot of the existing cluster and apply the snapshot to the new cluster. Start cluster serviceson the new cluster and stop the original cluster

D

Create a snapshot of the existing cluster and apply the snapshot to the new cluster. Stop cluster serviceson the original cluster and start on the new cluster


参考答案

参考解析
解析: 暂无解析
更多 “单选题A customer wants to migrate their existing cluster onto new POWER6 hardware, and in addition requires thecluster to be migrated from PowerHA version 5.3 to 5.5. Given that AIX 6.1 and PowerHA 5.5 filesets arealready installed in the new hardware, which of the following methods would allow the customer to maintaintheir current cluster configuration?()A Add the new nodes to the existing cluster, and perform a rolling migration and remove the original nodesfrom the clusterB Add the new nodes to the existing cluster, and perform a non-disruptive upgrade and remove the originalnodes from the cluster.C Create a snapshot of the existing cluster and apply the snapshot to the new cluster. Start cluster serviceson the new cluster and stop the original clusterD Create a snapshot of the existing cluster and apply the snapshot to the new cluster. Stop cluster serviceson the original cluster and start on the new cluster” 相关考题
考题 As you start writing, new ideas will naturally emerge, but always keep them focused on your targeted customer, so you won't go off the track of what your customer wants.

考题 A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()A. operator trainingB. cache size of the two clustersC. fibre bandwidth capability between the sitesD. number of stacked tape drives attached to each cluster

考题 What is one reason you might recommend a solution using only autonomous access points to a customer? ()A、 The customer requires Layer 3 roaming.B、 The customer requires immediate wire line integration with a catalyst 6500 switch.C、 The customer needs an outdoor-ready access point.D、 The customer wants the option to migrate to LWAPP.

考题 A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()A、operator trainingB、cache size of the two clustersC、fibre bandwidth capability between the sitesD、number of stacked tape drives attached to each cluster

考题 A customer wants to add a new application to their existing IBM System Storage DS5300. Theyexpect that the new application will require a minimum of 15,000 additional IOPS. What toolshould be used to determine what additional disk is required to effectively add the newapplication?()A、eConfigB、Disk MagicC、Capacity MagicD、Tivoli Storage Productivity Center for Data

考题 A customer wants to run a Cluster 1600 configuration with multiple p655 servers.  They are using the new High Performance Switch for the high-speed interconnection between nodes.  Which of the following is the only supported cluster management software?()A、CSMB、PSSPC、GPFSD、HACMP

考题 A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()A、PCIe adaptersB、PCI-X adaptersC、PCI-X andPCIe adaptersD、PCI, PCI-X andPCIe adapters

考题 A customer has a new Power 720 with PowerVM Standard Edition.  They plan to migrate their single-partition POWER5 550 to the new Power 720.   How can the customer migrate from the POWER5 550 to the Power 720 with minimal effort and down time?()A、Perform Live Partition Mobility between the two systems.B、Move the boot disks from the old system to the new system.C、Use Tivoli Storage Manager to back up the POWER5 550 and restore on the Power 720.D、Upgrade AIX to the latest level on the POWER5 550 and clone using the mksysb command.

考题 An administrator has integrated a new application into an existing resource group. An application server withstart and stop scripts was defined and added to the resource group definition. The cluster was thensynchronized. How can the new application be started with minimal downtime?()A、The administrator will need to perform an rg_move operationB、The administrator will need to un-manage and re-manage the resource groupC、The administrator will need to execute the new start script from the command lineD、The new start script will be executed as part of the DARE operation to synchronize the cluster

考题 What is a design consideration when using existing PCIe I/O drawers in a maximum bandwidth/throughput configuration on a new Power 750 system?()A、The new system requires 1 installed processor card for the GX++ bus adapterB、The new system requires a minimum of 2 installed processor cards for the GX++ bus adapterC、The new system requires a minimum of 3 installed processor cards and the HPC InfiniBand cluster adapterD、The new system requires 1 installed processor card for the GX++ bus adapter and the HPC InfiniBand cluster adapter

考题 A customer wants to migrate from McData-based fabrics to native Brocade fabrics. A Brocadedirector in the McData interop mode of operations has already been added to the fabrics, and thedevices moved from McData switches to the Brocade director. The customer is now ready toremove the McData switches from the fabrics and change the Brocade director to native mode ofoperations. What product is needed to migrate the zoning configuration to the Brocade director?()A、TPCB、TSMC、DCFMD、Fabric Watch

考题 Company.com is migrating from a third party managed disk subsystem to an IBM TotalStorage Enterprise Storage Server. Connection of the new storage server is complete, and it has been tested on all of the nodes in the three node HACMP cluster.  How does the customer migrate to the new storage server with minimum down time?()A、 Shut down one node at a time and let the other node serve the applicationB、 Stop HACMP with the forced option and perform migration of the disks on one node,then restart HACMPC、 Stop both nodes and perform the migration all at once using standard AIX commands in parallel, then restart the clusterD、 Use C-SPOC to add the new disks to the cluster and migrate the information off the existing disks, then remove the old disks with C-SPOC

考题 A customer wants to improve the utilization of the current capacity of their existing N series Tier 1production storage. What solution would the storage specialist discuss with the customer?()A、 compression with IBM Real-time Compression Appliances B、 deduplication with IBM ProtecTIER C、 virtualization with IBM SVC D、 file virtualization with SONAS

考题 A System p administrator in a manufacturing customer plans to migrate an AIX 5.2 system to a new LPAR on an existing System p using VIOS.  Which of the following must be completed prior to this migration ()A、Upgrade system firmware to latest levelB、Upgrade to AIX 5.3C、Upgrade HMC to version 6.1D、Convert rootvg filesystems to JFS2

考题 The customer has an older storage array and is looking to migrate data that currently exists onover 100 73 GB FC drives to a new IBM System Storage DS5020. The customer states that theyhave only 3 TB of data and wants to consolidate on to fewer higher capacity drives. There are sixapplication servers running multiple applications and operating systems utilizing the storagesystem. What would be the next step to accurately identify the new storage configuration?()A、initiate a Disk Magic studyB、initiate a Capacity Magic studyC、runiometer on the current environmentD、utilize the IBM Disk capacity planner toolkit

考题 A customer wants to implement a clustered database solution on their existing x445 servers.  A minimum of four nodes must participate in the cluster, and the customer wishes to use open standards.  Which of the following best satisfies their requirements?()A、Novell NetWare Cluster ServicesB、Red Hat Enterprise Linux Cluster SuiteC、Microsoft Windows 2003 Server with MSCSD、Microsoft Windows 2003 Enterprise Edition

考题 During an HACMP migration,two nodes of a four-node cluster have been migrated. The existing hardware of the remaining two nodes do not meet the pre-requisites of the HACMP level that is being installed.  Which of the following is the best method for resolving this issue?()A、 Upgrade the unsupported hardware and continue with the migration.B、 Restore the two nodes that have been migrated with a cluster snapshot.C、 Restore the two nodes that have not been migrated with a cluster snapshot.D、 Synchronize the cluster to allow the nodes that didn’t migrate to join the cluster.

考题 You add a Windows Server 2008 R2 server with the Hyper-V role installed to an existing Hyper-V failover cluster.  After you move a virtual machine (VM) to the new cluster node, Microsoft System Center Virtual Machine Manager (VMM) 2008 R2 reports the status of the VM as Unsupported Cluster Configuration. You need to be able to manage the VM by using VMM. What should you do?()A、Disable TCP Chimney Offload on the new cluster nodes network adaptersB、Disable the TCP/IP Offload Engine (TOE) on the new cluster nodes network adapters.C、Move the VM configuration file to a local storage device, and update the pointer to the file.D、Update the virtual networking configuration of the new cluster node to match the virtual networking configuration of the original cluster nodes.

考题 Company.com needs to add a new file system to an existing volume group that is being made  Highly available by HACMP? What is the best procedure that minimizes down time of the applications?()  A、 Use C-SPOC to add the file system while the cluster is running.B、 Add the file system,and them perform the exportvg and importvg on the required nodes.C、 Stop the cluster,add the new file system, and synchronize the cluster then restart HACMP.D、 Break the reservation locks on the disk drives while the cluster is active and add the file system.

考题 单选题During an HACMP migration,two nodes of a four-node cluster have been migrated. The existing hardware of the remaining two nodes do not meet the pre-requisites of the HACMP level that is being installed.  Which of the following is the best method for resolving this issue?()A  Upgrade the unsupported hardware and continue with the migration.B  Restore the two nodes that have been migrated with a cluster snapshot.C  Restore the two nodes that have not been migrated with a cluster snapshot.D  Synchronize the cluster to allow the nodes that didn’t migrate to join the cluster.

考题 单选题Company.com is migrating from a third party managed disk subsystem to an IBM TotalStorage Enterprise Storage Server. Connection of the new storage server is complete, and it has been tested on all of the nodes in the three node HACMP cluster.  How does the customer migrate to the new storage server with minimum down time?()A  Shut down one node at a time and let the other node serve the applicationB  Stop HACMP with the forced option and perform migration of the disks on one node,then restart HACMPC  Stop both nodes and perform the migration all at once using standard AIX commands in parallel, then restart the clusterD  Use C-SPOC to add the new disks to the cluster and migrate the information off the existing disks, then remove the old disks with C-SPOC

考题 单选题A customer is interested in using two Power 550 servers to implement a new two node cluster. The cluster willbe using SAN attached disk for shared storage and will be attached to one IP network. Which of the followingadapter configurations will meet the customer requirements while reducing single points of failure?()A AB BC CD D

考题 多选题A customer has purchased a new Junos Pulse Access Control Service and wants to install it in an existing cluster.After initial configuration, the customer finds that the firmware version running on the Junos Pulse Access Control Service is 4.1 r5, but the existing cluster is running firmware version 4.1 r3. Which two actions must be performed to allow the new Junos Pulse Access Control Service to load the older version of firmware?()AInstall a valid license on the new Junos Pulse Access Control Service.BWhen loading the older firmware, delete all the existing data on the Junos Pulse Access Control Service.CAdd the new Junos Pulse Access Control Service to the existing cluster.DDownload the 4.1 r3 version firmware from the Juniper support website.

考题 单选题The company is evaluating using a new Active Directory domain to contain all customer user accounts. You need to design a monitoring or logging strategy that meets business and security requirements for the new Web-based ordering application. Your solution must minimize overhead on existing domain controllers and servers.  What should you do?()A Enable logon auditing in both the new and the existing domainsB Enable logon auditing only in the existing domainC Enable logon auditing only in the new domainD Enable logon auditing on only the Web server

考题 单选题A customer wants to migrate their existing cluster onto new POWER6 hardware, and in addition requires thecluster to be migrated from PowerHA version 5.3 to 5.5. Given that AIX 6.1 and PowerHA 5.5 filesets arealready installed in the new hardware, which of the following methods would allow the customer to maintaintheir current cluster configuration?()A Add the new nodes to the existing cluster, and perform a rolling migration and remove the original nodesfrom the clusterB Add the new nodes to the existing cluster, and perform a non-disruptive upgrade and remove the originalnodes from the cluster.C Create a snapshot of the existing cluster and apply the snapshot to the new cluster. Start cluster serviceson the new cluster and stop the original clusterD Create a snapshot of the existing cluster and apply the snapshot to the new cluster. Stop cluster serviceson the original cluster and start on the new cluster

考题 单选题Company.com has recently received a new p5-570 in the data center and wants to Micro-Partition the server. The customer already has an existing HMC connected to a p690. Which of the following actions should the technical specialist take?()A Order a POWER5 HMCB Connect to the existing HMCC Install an 8-port asynchronous card in the managed server to connect to the existing HMCD Install an additional network card to the existing HMC and connect to the POWER5 service processor

考题 单选题What is one reason you might recommend a solution using only autonomous access points to a customer? ()A  The customer requires Layer 3 roaming.B  The customer requires immediate wire line integration with a catalyst 6500 switch.C  The customer needs an outdoor-ready access point.D  The customer wants the option to migrate to LWAPP.

考题 单选题A customer is looking to add disk storage. They are not satisfied with their existing EMCCLARiiON CX4-240. Instead of adding storage to the CX4, the customer wants to add a newsystem and migrate the LUNs from the EMC to the new storage system over a 6 month period,and not have any system disruption during this time. They are also interested in consolidating diskstorage management. Given these specifications, which of the following solutions would satisfythis customer’s requirements?()A DS5100 and SAN Volume ControllerB DS5100 and Tivoli Storage ManagerC 2 DS5100 systems with Remote MirroringD DS5100 and Tivoli Storage Productivity Center for Data