网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
问答题
翻译:any kraft paper and/of dunnage if required at loading port to be for owners’ account

参考答案

参考解析
解析: 暂无解析
更多 “问答题翻译:any kraft paper and/of dunnage if required at loading port to be for owners’ account” 相关考题
考题 (c) (i) Explain the capital gains tax (CGT) implications of a takeover where the consideration is in the form. ofshares (a ‘paper for paper’ transaction) stating any conditions that need to be satisfied. (4 marks)

考题 A poster is any piece of printed paper designed to be attached to a wall or vertical surface.()

考题 Port of loading(短语翻译)

考题 Please kindly arrange for shore workers to do ______ during loading the heavy cargo on deck as soon as possible.A.the work of using lines and chains to secure the cargo on boardB.the lash workC.the work of putting dunnage,keeping the cargo in position and not move when the ship is rolling and pitchingD.the lashing work

考题 Protection of cargo against tainting damage can best be obtained by ______.A.Ventilating the space.B.Not ventilating the space.C.Proper use of paper separation and dunnage.D.Segregation of cargo by using different hatches

考题 In most cases,the mere reception or dumping down of the cargo on the ship ______ involve completion of loading,because the operation of loading involves all that is required to put the cargo in a condition in which it can be carried.A.is notB.has notC.do notD.does not

考题 All dunnage planks and mats must be sent on board ______ commencement of loading.A.Prior toB.DuringC.In the period ofD.Afterwards

考题 When loading a container vessel,the operation is basically that of vertical loading.The important factors to be considered when loading containers are port of discharge,______.A.Available dunnage,and chockingB.Crushability,and inherent viceC.Sweat,and weightD.Weight,and refrigeration

考题 The author was required to submit an()of about 200 words together with his research paper. A.edition B.editorial C.article D.abstract

考题 There wasn't any paper in the box,()?A、wasn‘t thereB、was thereC、wasn‘t anyD、was any

考题 翻译:shore tallyman to be employed by the vessel at the expenses to the vessel ,both at loading and discharging port

考题 翻译:any kraft paper and/of dunnage if required at loading port to be for owners’ account

考题 翻译:any lightrage at loading and discharging port to be at charterers’ risk and expenses and time used to count as laytime

考题 翻译:In the event the demurrage is not paid in accordance with the above, the Owners shall give the Charterers 96 running hours written notice to rectify the failure. If the demurrage is not paid at the expiration of this time limit and if the vessel is in or at the loading port, the Owners are entitled at any time to terminate the Charter Party and claim damages for any losses caused thereby.

考题 Which narrative regarding loading software is incorrect?()A、The approved Loading Program could substituted the approved Loading Manual and/or Trim and Stability BookletB、A Loading Program is required to have General Approval by classification Society prior to being considered for use on a specific shipC、Following a satisfactory installation test on board the ship the Surveyor will issue a Program Installation TestD、A Loading Program may be provided as a classification requirement or as an Owner’s option

考题 Ingeneral,the charterers should pay full hireunder time c/p,without any discount,except、that()A、on strik in loading portB、delay by iced discharging portC、Deficiency of menD、any conditions

考题 翻译:Time lost waiting for berth to count as loading/discharging time

考题 单选题In most cases,the mere reception or dumping down of the cargo on the ship()involve completion of loading,because the operation of loading involves all that is required to put the cargo in a condition in which it can be carried.A is notB has notC do notD does not

考题 单选题All dunnage planks and mats must be sent to board()commencement of loading.A prior toB duringC in the period ofD afterwards

考题 单选题There wasn't any paper in the box,()?A wasn‘t thereB was thereC wasn‘t anyD was any

考题 单选题Before any loading takes place any signs of the previous cargo should do().A keptB removedC replacedD recycled

考题 单选题When loading a container vessel,the operation is basically that of vertical loading. The important factors to be considered when loading containers are port of discharge,().A available dunnage,and chockingB crushability,and inherent viceC sweat,and weightD weight,and refrigeration

考题 问答题翻译:any lightrage at loading and discharging port to be at charterers’ risk and expenses and time used to count as laytime

考题 问答题翻译:Time lost waiting for berth to count as loading/discharging time

考题 单选题Please kindly arrange for shore workers to do()during loading the heavy cargo on deck as soon as possible.A the work of using lines and chains to secure the cargo on boardB the lash workC the work of putting dunnage,keeping the cargo in position and not move when the ship is rolling and pitchingD the lashing work

考题 单选题Which narrative regarding loading software is incorrect?()A The approved Loading Program could substituted the approved Loading Manual and/or Trim and Stability BookletB A Loading Program is required to have General Approval by classification Society prior to being considered for use on a specific shipC Following a satisfactory installation test on board the ship the Surveyor will issue a Program Installation TestD A Loading Program may be provided as a classification requirement or as an Owner’s option

考题 问答题翻译:In the event the demurrage is not paid in accordance with the above, the Owners shall give the Charterers 96 running hours written notice to rectify the failure. If the demurrage is not paid at the expiration of this time limit and if the vessel is in or at the loading port, the Owners are entitled at any time to terminate the Charter Party and claim damages for any losses caused thereby.