网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
The ship needs loading and discharging.()
A

船舶需要装货

B

船舶需要卸货

C

船舶需要装卸货

D

船舶需要靠港


参考答案

参考解析
解析: 暂无解析
更多 “单选题The ship needs loading and discharging.()A 船舶需要装货B 船舶需要卸货C 船舶需要装卸货D 船舶需要靠港” 相关考题
考题 Preparations for loading cargo on board ship.

考题 When off loading garbage to another ship, your records must identify that ship by name and ______.A.home portB.operator's name of recordC.official numberD.master's name

考题 My ship {needs} a pilot.A.requiresB.hasC.takesD.gets

考题 If a chartered ship is prevented from,or delayed in,getting to the loading port by peril excepted during the voyage,the exception clauses ______.A.applyB.complyC.supplyD.reply

考题 In most cases,the mere reception or dumping down of the cargo on the ship ______ involve completion of loading,because the operation of loading involves all that is required to put the cargo in a condition in which it can be carried.A.is notB.has notC.do notD.does not

考题 During loading or discharging,the tallymen must make contact with______on duty so as to solve problems in time.A.ship ownerB.ship’s officersC.ConsignorsD.shippers

考题 When do sailors make the ship fast? ()A、When a ship is unmooring.B、After a ship is in position alongside a wharf.C、Before a ship is loading.D、A and C

考题 The ()is pumped onto the ship at the loading port by shore pumps.A、oilB、gasC、water and fuelD、timber

考题 The ship needs loading and discharging.()A、船舶需要装货B、船舶需要卸货C、船舶需要装卸货D、船舶需要靠港

考题 船舶需要装卸货。()A、The ship needs loading.B、The ship needs discharging.C、The ship needs unloading.D、The ship needs loading and discharging.

考题 The oil is usually pumped into ship at the loading port by().A、ship’s own pumpsB、shore pumpsC、large pipesD、large tubes

考题 Which narrative regarding loading software is incorrect?()A、The approved Loading Program could substituted the approved Loading Manual and/or Trim and Stability BookletB、A Loading Program is required to have General Approval by classification Society prior to being considered for use on a specific shipC、Following a satisfactory installation test on board the ship the Surveyor will issue a Program Installation TestD、A Loading Program may be provided as a classification requirement or as an Owner’s option

考题 单选题In most cases,the mere reception or dumping down of the cargo on the ship()involve completion of loading,because the operation of loading involves all that is required to put the cargo in a condition in which it can be carried.A is notB has notC do notD does not

考题 单选题The port clearance for a ship should be granted()the completion of loading or discharging in the port.A beforeB whenC afterD during

考题 单选题Our ship()loading yesterday morning.A finishB finishingC finishedD has finished

考题 单选题My ship is()No.5 berth for loading.A onto the wharfB moved asternC into the dockD moored alongside

考题 单选题When a ship is fully loaded, it needs to prevent the main engine to be().While a ship is fully empty, it needs to prevent the main engine to be().A overspeed;overloadB overload;overspeedC over mechanical load;over thermal loadD over torque;overspeed

考题 单选题The ship will be responsible for the cargo loaded or unloaded().A only when the cargo is within its railB during the time when loading or ynloading is going onC after the cargo is checked by tallymenD as soon as loading or discharging begins

考题 单选题The oil is usually pumped into ship at the loading port by().A ship’s own pumpsB shore pumpsC large pipesD large tubes

考题 单选题If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.A in the loading placeB in the port or dockC in the loading spotD in the discharging spot

考题 单选题When off loading garbage to another ship, your records must identify that ship by name and ()A home portB operators name of recordC official numberD masters name

考题 单选题If a chartered ship is prevented from,or delayed in,getting to the loading port by peril excepted during the voyage,the exception clauses().A applyB complyC supplyD reply

考题 单选题When do sailors make the ship fast? ()A When a ship is unmooring.B After a ship is in position alongside a wharf.C Before a ship is loading.D A and C

考题 单选题船舶需要装卸货。()A The ship needs loading.B The ship needs discharging.C The ship needs unloading.D The ship needs loading and discharging.

考题 单选题Structural stress levels in a ship are the sum of loading stresses and stresses due to().A environmental loadsB variable loadsC ballast loadingD mooring loads

考题 单选题The loading of the ship must be done in accordance with().A the ship’s instructionsB the terminal’s instructionsC the port captain’s instructionsD the charterer’s instructions

考题 单选题Which narrative regarding loading software is incorrect?()A The approved Loading Program could substituted the approved Loading Manual and/or Trim and Stability BookletB A Loading Program is required to have General Approval by classification Society prior to being considered for use on a specific shipC Following a satisfactory installation test on board the ship the Surveyor will issue a Program Installation TestD A Loading Program may be provided as a classification requirement or as an Owner’s option