网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
There are seven basic steps of the core baseline process. Which one takes place first?()
A

Implement threshold monitoring using RMON.

B

Poll and record specific SNMP MIB objects from the device

C

Verify that the SNMP MIB is supported in the relevant core device.

D

Implement monitoring using SNMP or RMON.


参考答案

参考解析
解析: 暂无解析
更多 “单选题There are seven basic steps of the core baseline process. Which one takes place first?()A Implement threshold monitoring using RMON.B Poll and record specific SNMP MIB objects from the deviceC Verify that the SNMP MIB is supported in the relevant core device.D Implement monitoring using SNMP or RMON.” 相关考题
考题 Basic question types are __________. A.yes-no questionB.or question and wh-questionC.yes-no questionD.tag question and wh-question

考题 Developing the project schedule is often an iterative process. It determines the planned start and finish dates for project activities and milestones. Schedule development can require the review and revision of duration estimates and resource estimates to create an approved project schedule that can serve as a baseline to(75) progress.A.analyzeB.trackC.levelD.extend

考题 ●Developing the project schedule is often an iterative process. It determines the planned start and finish dates for project activities and milestones. Schedule development can require the review and revision of duration estimates and resource estimates to create an approved project schedule that can serve as a baseline to (75) progress.(75)A. analyzeB. trackC. levelD. extend

考题 Smoking is so harmful to personal health that it killing ( ) people each year than automobile accidents.A、seven more timesB、seven times moreC、over seven timesD、seven times

考题 You plan to set up the Automatic Workload Repository (AWR) baseline metric thresholds for a moving window baseline. Which action would you take before performing this task?() A. Compute the baseline statistics.B. Take an immediate AWR snapshot.C. Decrease the window size for the baseline.D. Decrease the expiration time for the baseline.

考题 在SQL语句中,与表达式“仓库号NOT IN(“wh1”,“wh2”)”功能相同的表达式是A.仓库号=“wh1”AND仓库号:“wh2”B.仓库号!=“wh1”OR仓库号:=“wh2”C.仓库号<>“wh1”OR仓库号!=“wh2”D.仓库号!=“wh1”AND仓库号!=“wh2”

考题 What are the four basic Data Flow steps of an ETL process?在ETL过程中四个基本的过程分别是什么?

考题 Explain the three basic delivery steps for conformed dimensions.简述对一致性维度的三种基本的交付步骤。

考题 在SQL语句中,与表达式“仓库号NOT IN("whl","wh2")”功能相同的表达式是 ______。A.仓库号="wh1" AND仓库号="wh2"B.仓库号!="wh1"OR仓库号#"wh2",C.仓库号<>"wh1" OR仓库号!"wh2"D.仓库号户'whl,tAND仓库号!:”wh2”

考题 在SQL语句中,与表达式“仓库号NOT IN("whl ","wh2")”功能相同的表达式是A)仓库号="wh1"AND仓库号="wh2"B)仓库号!="whl" OR仓库号="wh2"C) 仓库号"wh 1" OR仓库号!="wh2"D)仓库号!="whl" AND仓库号!= "wh2"

考题 Multiple users report that their Windows 7 computers take longer to start than when their computers were first installed. A help desk technician reports that the problem is related to installed applications. You need to recommend a solution that identifies the applications that run during the startup process. What should you recommend?()A.Event ForwardingB.MSConfig.exeC.Problem Steps RecorderD.Reliability Monitor

考题 The seven basic quality tools are used within in the context of the PDCA Cycle to solve quality-related problems.These tools are used in()in the following processes.A.plan quality managementB.perform quality assuranceC.perform quality controlD.perform quality improvement

考题 What is the accepted standard for wire rope falls used in connection with the lifeboat gear ________.A.Six by seven galvanized wire ropeB.Six by twenty-four improved plow steel wire ropeC.Six by thirty-seven preformed fiber-core wire ropeD.Six by nineteen regular-lay filler wire rope

考题 奈曼分配中,wh=Wh

考题 Which of the following troubleshooting steps should be performed NEXT after a core router hasbeen reported down?()A、Implement a solution.B、Establish the outage cause.C、Identify all affected areas.D、Test a solution.

考题 An administrator is getting reports that a file server is responding slowly. Which of the following steps should the administrator take FIRST?()A、Remove unnecessary files on the server to free up hard disk space.B、Defragment the server’s hard disks.C、Compare monitoring results with the server baseline.D、Add additional memory to reduce paging.

考题 Which command will set the core size file to unlimited for the user ‘webapp’?()A、no -p ’core=-1’ webappB、chuser ’core=-1’ webappC、setsenv -attr ’core=unlimited’ webappD、chsec -f ’/etc/security/limits’ ’core=-1’ webapp

考题 A file named "core" exists in the current directory.  Which of the following commands should be used to determine what created the "core" file?()A、 dump -t core B、 strings core C、 trace -a core D、 crash core /unix_up

考题 Multiple users report that their Windows 7 computers take longer to start than when their computers were first installed. A help desk technician reports that the problem is related to installed applications. You need to recommend a solution that identifies the applications that run during the startup process. What should you recommend?()A、Event ForwardingB、MSConfig.exeC、Problem Steps RecorderD、Reliability Monitor

考题 单选题A file named "core" exists in the current directory.  Which of the following commands should be used to determine what created the "core" file?()A  dump -t core B  strings core C  trace -a core D  crash core /unix_up

考题 单选题Developing the project schedule is often an iterative process. It determines the planned start and finish dates for project activities and milestones. Schedule development can require the review and revision of duration estimates and resource estimates to create an approved project schedule that can serve as a baseline to()progress.A analyzeB trackC levelD extend

考题 单选题You have created a baseline metric, DISK_IO_BL, for the disk I/O metrics in your PROD database and you have been getting notifications whenever the database performance degrades. You optimize the database I/O to gain the performance and you decide to remove the baseline metrics. Which method would you use to remove the DISK_IO_BL baseline metrics?()A The baseline, once created, cannot be removed.B Disable the baseline metrics in the Database Control Manage Metrics page.C The baseline will be automatically removed once the database performance has been optimized.D Drop the baseline metrics by usingDBMS_WORKLOAD_REPOSITORY.DROP_BASELINE procedure.

考题 单选题View the Exhibit that sets the threshold for the Current Open Cursors Count metric.Why is the Significance Level threshold type not available in the threshold setting?()A because AWR baseline is not enabledB because Current Open Cursors Count is not a basic metricC because the STATISTICS_LEVEL parameter is set to BASICD because the AWR baseline is a system-defined moving window baseline

考题 单选题What is the accepted standard for wire rope falls used in connection with the lifeboat gear?()A Six by seven galvanized wire ropeB Six by twenty-four improved plow steel wire ropeC Six by thirty-seven preformed fiber-core wire ropeD Six by nineteen regular-lay filler wire rope

考题 单选题You plan to set up the Automatic Workload Repository (AWR) baseline metric thresholds for a moving window baseline. Which action would you take before performing this task?()A  Compute the baseline statistics.B  Take an immediate AWR snapshot.C  Decrease the window size for the baseline.D  Decrease the expiration time for the baseline.

考题 单选题The first few steps in the employment process are relatively inexpensive to the company, and each may indicate basic reasons ______ the applicant is unsuitable for the job.A becauseB whyC forD that

考题 单选题You plan to set up the Automatic Workload Repository (AWR) baseline metric thresholds for a moving window baseline. Which action would you take before performing this task?()A Compute the baseline statistics.B Take an immediate AWR snapshot.C Decrease the window size for the baseline.D Decrease the expiration time for the baseline.