网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
Bonding cables are used during cargo transfer to().
A
provide safe electrical power connection to barge equipment
B
keep the vessel from surging excessively
C
prevent an accidental discharge of static electricity
D
secure the cargo hose to a hatch when loading overall
参考答案
参考解析
解析:
暂无解析
更多 “单选题Bonding cables are used during cargo transfer to().A provide safe electrical power connection to barge equipmentB keep the vessel from surging excessivelyC prevent an accidental discharge of static electricityD secure the cargo hose to a hatch when loading overall” 相关考题
考题
The original Bill of Lading,once signed by the Master,is NOT ______.A.a receipt and proof that goods have been received on boardB.surrendered to the customs agency of the country where the cargo is dischargedC.used to transfer ownership of the cargo while the ship is enrouteD.proof of title or ownership of the cargo
考题
Which safety precaution(s)should be observed during crane operations ________.A.Checking for proper lifting from beneath the load during cargo operationsB.Using the proper slings or other lifting devices during cargo operationsC.Relaying communications to port agents on the pier during cargo hoistsD.All of the above
考题
During the process of loading,damages to cargo can be reduced to minimum by ______.A.Shippers who deliver the cargo to the ship on timeB.Stevedores who handle the cargo with cautionC.Ship's crew members who check the cargo in regular intervalsD.Consignees who take good care of the cargo
考题
The sign used to caution persons approaching the gangway of a tank barge during cargo transfer reads ______.A.Warning,Keep Off,Stay ClearB.Danger,Do Not BoardC.Warning,No Smoking,No Open Lights,No VisitorsD.Dangerous Cargo Being Transferred
考题
Bonding cables are used during cargo transfer to ______.A.provide safe electrical power connection to barge equipmentB.keep the vessel from surging excessivelyC.prevent an accidental discharge of static electricityD.secure the cargo hose to a hatch when loading overall
考题
A bonding cable should be connected for cargo operations aboard a tank vessel as soon as the ______.A.Cargo has been loaded or dischargedB.Cargo hose is connectedC.Cargo pumps are startedD.Vessel is ready to handle cargo
考题
To allow for the rise or fall in tide and for change in draft of a tanker during cargo transfer,cargo hoses must be suspended with ______.A.Slings or saddles placed at 25-foot(8 meter)intervalsB.Enough slack in their bightC.Topping lifts and runners tied off to winchesD.All of the above
考题
What is NOT required to be contained in the oil transfer procedures ________.A.A line diagram of the vessel's oil transfer pipingB.The number of persons on duty during oil transfer operationsC.Any special procedures for topping off tanksD.The location and capacity of all fuel and cargo tanks on the vessel
考题
Which statement is true about the database and database-user used during installation of IMS Server?()A、A preexisting database user may be used but a new database has to be created during installation.B、A preexisting database may be used but a new database user has to be created during installation.C、A preexisting database and user may be used or a new database and user are created during installation.D、A preexisting database and user cannot be used; a new database and user are created during installation.
考题
单选题The purpose of a preventer as it is used on a conventional yard and stay cargo rig is to().A
allow greater than normal loads to be handled by the gearB
act as an inboard guy in the event the inboard guy parts during cargo handlingC
assist the outboard guy in supporting stresses during cargo handlingD
prevent the inboard guy from parting due to stresses during cargo handling
考题
单选题During the process of loading, damages to cargo can be reduced to minimum by().A
shippers who deliver the cargo to the ship on timeB
stevedores who handle the cargo with cautionC
ship's crew members who check the cargo in regular intervalsD
consig ees who take goo care of the cargo
考题
单选题A facility used for the discharge of a cargo of a particular hazard,such as chlorine,butane or ethane,must have what to warn water traffic of an immediate danger during fire or cargo release?()A
An emergency boat and crewB
A siren or rotating flashing lightC
Flashing red lights located one-half mile upstream and downstream of the facilityD
Buoys with flashing lights controlled from shore,located one-half mile upstream anddownstream of the facility
考题
单选题Which of the following operations aboard a tanker must be recorded in the Oil Record Book ()A
Any internal transfer of oil cargo during a voyageB
The discharge overboard in port or at sea of any bilge water accumulated in machinery spacesC
The loading or unloading of any or all oil cargoD
All of the above
考题
单选题Cargo damaged due to water being present in a cargo hold,as a result of a leak in the hull plating,is said to be damage by(). ① Free moisture ② Transfer of hygroscopic moistureA
① onlyB
② onlyC
Both ① and ②D
Neither ① nor ②
考题
单选题Why is a warning sign displayed at the gangway or access point of a barge during cargo transfer().A
To keep visitors away from the bargeB
To prohibit smokingC
To prohibit open lightsD
All of the above
考题
单选题Which is wrong?().A
Dunnage is used to reduce broken spaceB
Dunnage is used to benefit ventilationC
Dunnage is used to segregate cargoD
Dunnage is used to protect cargo
考题
单选题重吊杆用于吊大的重件。()A
Heavy derrick is used for lifting large heavy cargo.B
Derrick is used for lifting large heavy cargo.C
Heavy derrick is used for lifting dry bulk cargo.D
Derrick is used for lifting dry bulk cargo.
考题
单选题A bonding cable should be connected for cargo operations aboards a tank vessel as soon as the().A
cargo has been loaded or dischargedB
cargo ghose is connectedC
cargo pumps are startedD
vessel is ready to handle cargo
考题
单选题The original Bill of Lading,once signed by the Master,is NOT().A
a receipt and proof that goods have been received on boardB
surrendered to the customs agency of the country where the cargo is dischargedC
used to transfer ownership of the cargo while the ship is enrouteD
proof of title or ownership of the cargo
考题
单选题Which statement is true about the database and database-user used during installation of IMS Server?()A
A preexisting database user may be used but a new database has to be created during installation.B
A preexisting database may be used but a new database user has to be created during installation.C
A preexisting database and user may be used or a new database and user are created during installation.D
A preexisting database and user cannot be used; a new database and user are created during installation.
考题
单选题Hoses used for cargo transfer operations must be tested and inspected at specified intervals by().A
a representative of the Captain of the PortB
the operator of the vessel or facilityC
a representative of the National Cargo BureauD
low inert gas temperature
考题
单选题Hoses used for cargo transfer operations must be tested abdinspected at specified intervals by ().A
a representative of the Captain of the PortB
the operator of the vessel or facilityC
a representative of the National Cargo BureauD
a representative of the American Bureau of Shipping
考题
单选题According to regulations,a cargo hose used for transferring liquefied gases must have a bursting pressure of().A
5 times the maximum working pressure on the hose during cargo transferB
one half the designed working pressureC
4 times the pressure of the cargo pump used for transferringD
5 times the minimum working pressure on the hose during cargo transfer
考题
单选题The sign used to caution persons approaching the gangway of a tank barge during cargo transfer reads().A
Warning,Keep Off,Stay ClearB
Danger,Do Not BoardC
Warning,No Smoking,No Open Lights,No VisitorsD
Dangerous Cargo Being Transferred
考题
单选题When possible,what should be the FIRST step in combating a fire on deck resulting from a cargo overflow or a leaking cargo line?()A
Blanket the cargo spill with foamB
Prevent the spread of fire with a foam damC
Apply CO2 on burning fuel at its sourceD
Shut off the transfer of cargo
热门标签
最新试卷