The roller hatch beam at the edge of the open section of the hatch shall be ______ so that it cannot be moved toward the open section.
A.braced
B.chopped
C.lashed or pinned back
D.locked
参考答案
更多 “ The roller hatch beam at the edge of the open section of the hatch shall be ______ so that it cannot be moved toward the open section.A.bracedB.choppedC.lashed or pinned backD.locked ” 相关考题
考题
______ is known as a long hatch during loading operation.A.The largest hatch of a shipB.The hatch that is double riggedC.The hatch where a disproportionate amount of cargo is stowedD.The hatch where the most cargo is stowed
考题
WHEN CONTACT MADE WITH THE RADIO STATION OAS AT SAN JUAN,A PRE-STOWAGE HATCH LIST WITH SEQUENCE OF LOADING TO BE SENT TO LOAD PORT NOT LESS THAN 48 HRS IN ADVANCE.From this fax,the pre-stowage hatch list shall be sent to ______.A.THE RADIO STATIONB.SAN JUANC.OASD.LOAD PORT
考题
Tonnage openings must be closed by means of ______.A.Press boardB.Steel hatch boardsC.Steel platesD.Wooden hatch boards
考题
Any hatch beam or pontoon left in place next to an open hatch section being worked shall be ______ or otherwise secured,so that it cannot be accidentally displaced.A.tommed downB.bracedC.lockedD.chopped
考题
Strongbacks unshipped in an intermediate deck shall not be placed closer than 15.24 cm from ______.A.the coamingB.hatch wayC.fore bulkheadD.aft bulkhead
考题
______ is not a proper instruction for laying hatch beams.A.to be laid on their sidesB.to be stood on edge close togetherC.be lashedD.be covered
考题
2号舱口处的起货机出故障了。()A、There is something wrong with the derrick at hatch No.2.B、There is something wrong with the derrick at hatch No.1.C、There is something wrong with the winch at hatch No.2.D、There is something wrong with the winch at hatch No.1.
考题
The running wheel runs along ()on top of the hatch coaming.A、the guide railB、the guide ropeC、the side coamingD、the guide roller
考题
If the hatch cover does not move, ()should be checked.A、the open valveB、the stop valveC、the steam valveD、the close valve
考题
If there is a fire in a hold, what should you do?()A、Close the hatch, accesses and ventilators at once. Flood CO2 into hold.B、Open the hatch, accesses and ventilators at once. Flood CO2 into hold.C、Close the hatch, accesses and ventilators at once. Flood water into hold.D、Open the hatch, accesses and ventilators at once. Flood water into hold.
考题
单选题If there is a fire in a hold, what should you do?()A
Close the hatch, accesses and ventilators at once. Flood CO2 into hold.B
Open the hatch, accesses and ventilators at once. Flood CO2 into hold.C
Close the hatch, accesses and ventilators at once. Flood water into hold.D
Open the hatch, accesses and ventilators at once. Flood water into hold.
考题
单选题请把吊杆甩到舱口上方好吗?()A
Will you please swing the heavy derrick over the hatch?B
Will you please swing the derrick over the hatch?C
Will you please lower the derrick over the hatch?D
Will you please top the heavy derrick over the hatch?
考题
单选题Tell me(),please.A
which hatch will be loaded firstB
will which hatch be loaded firstC
will hatch of which be loaded firstD
first will which hatch be loaded
考题
单选题我船配有自动舱盖。()A
Our ship is equipped with automatic hatch covers.B
Our ship is equipped with folding-type hatch covers.C
Our ship is equipped with side-rolling hatch covers.D
Our ship is equipped with rolling-type hatch covers.
考题
单选题Are you testing the()(液压舱盖)?A
hydraulic hatch coverB
hydraulic release unitC
hydraulic oil jackD
automatic hatch cover
考题
单选题If the hatch cover does not move, ()should be checked.A
the open valveB
the stop valveC
the steam valveD
the close valve
考题
单选题The running wheel runs along ()on top of the hatch coaming.A
the guide railB
the guide ropeC
the side coamingD
the guide roller
考题
单选题水手长,我们为什么要开舱盖?()A
Bosun, why do we open hatch covers?B
Officer, why do we open hatch covers?C
Bosun, why do we close hatch covers?D
Bosun, why do we open hatches?
考题
单选题Tonnage openings must be closed by means of().A
Press boardB
Steel hatch boardsC
Steel platesD
Wooden hatch boards
考题
单选题The()(侧滚式舱盖) runs along the guide rail.A
rolling type hatch coverB
side-rolling hatch coverC
folding type hatch coverD
automatic hatch cover
考题
单选题装卸货之前,打开舱盖。()A
After loading and discharging, hatch covers will be opened.B
After loading and discharging, hatch covers will be closed.C
Before loading and discharging, hatch covers will be opened.D
Before loading and discharging, hatch covers will be closed.
考题
单选题每一个舱盖由两个或更多的盖板组成。()A
Each hatch consists of two panels.B
Each hatch cover consists of two panels.C
Each hatch consists of two or more panels.D
Each hatch cover consists of two or more panels.
考题
单选题()is known as a long hatch during loading operation.A
The largest hatch of a shipB
The hatch that is double riggedC
The hatch where a disproportionate amount of cargo is atowedD
The hatch where the most cargo is stowed
考题
单选题The running wheel runs along the ()(导轨)on the hatch coaming top.A
guide ropeB
guide railC
side coamingD
side roller
考题
单选题The()(折叠式舱盖) can fold slowly.A
rolling type hatch coverB
side-rolling hatch coverC
folding type hatch coverD
automatic hatch cover