网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

______ is not a proper instruction for laying hatch beams.

A.to be laid on their sides

B.to be stood on edge close together

C.be lashed

D.be covered


参考答案

更多 “ ______ is not a proper instruction for laying hatch beams.A.to be laid on their sidesB.to be stood on edge close togetherC.be lashedD.be covered ” 相关考题
考题 What you said is not true! You are ________! A.liarB.lieC.lyingD.laying

考题 ____________, Newton was thinking and thinking.A、He lied under the apple treeB、Laying under the apple treeC、He laid under the apple treeD、Lying under the apple tree

考题 ______ is known as a long hatch during loading operation.A.The largest hatch of a shipB.The hatch that is double riggedC.The hatch where a disproportionate amount of cargo is stowedD.The hatch where the most cargo is stowed

考题 When loading a cargo of taconite,proper sequencing of loading by hatch number is necessary to ______.A.Provide the proper trimB.Prevent negative stability from developingC.Prevent excessive longitudinal stressesD.Control list

考题 Tonnage openings must be closed by means of ______.A.Press boardB.Steel hatch boardsC.Steel platesD.Wooden hatch boards

考题 ______ is not a proper instruction for handling hatch covers.A.not to obstruct clear fore-and-aft passagewaysB.not to obstruct coaming-to-bulwark passagewaysC.to be lashed or otherwise secured to prevent accidental dislodgementD.to be laid on their sides

考题 What publications should a GMDSS Operator consult regarding the proper set-up and operation of vessel equipment ________.A.ITU PublicationsB.The manufacturers instruction manualsC.Part 90 of the FCC Rules and RegulationsD.Code of Federal Regulations,Title 47,Part 80,Subpart W

考题 ______ is not a proper form for Muster lists.A.A separate card given to each crew memberB.A separate instruction booklet given to each crew memberC.A card fixed in each cabin with instructions for the occupant of the cabinD.A well prepared notice posted on water-tight doors and/or in chart-room

考题 The boy( )when he said that he ( )the eggs( )by the hen in the closet before he( )down to have a rest。A.was lying,had laid,laid,lay B.had laid,lay,laid,was lying C.lay,was lying,lain, lay D.laid,lay,lain,lies

考题 2号舱口处的起货机出故障了。()A、There is something wrong with the derrick at hatch No.2.B、There is something wrong with the derrick at hatch No.1.C、There is something wrong with the winch at hatch No.2.D、There is something wrong with the winch at hatch No.1.

考题 Our practices are conformable to the requirements()by international organizations.A、laid downB、lied downC、layd ownD、laid out

考题 Close the (), please.A、hatch coamingsB、hatch coversC、hatch beamsD、hatch openings

考题 If there is a fire in a hold, what should you do?()A、Close the hatch, accesses and ventilators at once. Flood CO2 into hold.B、Open the hatch, accesses and ventilators at once. Flood CO2 into hold.C、Close the hatch, accesses and ventilators at once. Flood water into hold.D、Open the hatch, accesses and ventilators at once. Flood water into hold.

考题 单选题请把吊杆甩到舱口上方好吗?()A Will you please swing the heavy derrick over the hatch?B Will you please swing the derrick over the hatch?C Will you please lower the derrick over the hatch?D Will you please top the heavy derrick over the hatch?

考题 单选题In preparing a cargo space for receipt of a shipment of bagged cargo,which instruction for laying dunnage should be followed? ()A Use either 1 or 2 tiers of dunnage,spacing the pieces in each tier a foot apart,and lay pieces in the bottom tier diagonally to the ship's sideB Use 1 tier of dunnage,laying the pieces tightly together to form a solid floor over the steel deckC Use 2 tiers of dunnage,spacing the pieces in the bottom tier about a foot apart and the pieces in the top tier 6 inches apartD Use 2 tiers of dunnage,spacing the pieces in the bottom tier about a foot apart and the pieces in the top tier together

考题 单选题Tell me(),please.A which hatch will be loaded firstB will which hatch be loaded firstC will hatch of which be loaded firstD first will which hatch be loaded

考题 单选题我船配有自动舱盖。()A Our ship is equipped with automatic hatch covers.B Our ship is equipped with folding-type hatch covers.C Our ship is equipped with side-rolling hatch covers.D Our ship is equipped with rolling-type hatch covers.

考题 单选题Are you testing the()(液压舱盖)?A hydraulic hatch coverB hydraulic release unitC hydraulic oil jackD automatic hatch cover

考题 单选题Tonnage openings must be closed by means of().A Press boardB Steel hatch boardsC Steel platesD Wooden hatch boards

考题 单选题The()(侧滚式舱盖) runs along the guide rail.A rolling type hatch coverB side-rolling hatch coverC folding type hatch coverD automatic hatch cover

考题 单选题装卸货之前,打开舱盖。()A After loading and discharging, hatch covers will be opened.B After loading and discharging, hatch covers will be closed.C Before loading and discharging, hatch covers will be opened.D Before loading and discharging, hatch covers will be closed.

考题 单选题每一个舱盖由两个或更多的盖板组成。()A Each hatch consists of two panels.B Each hatch cover consists of two panels.C Each hatch consists of two or more panels.D Each hatch cover consists of two or more panels.

考题 单选题()is known as a long hatch during loading operation.A The largest hatch of a shipB The hatch that is double riggedC The hatch where a disproportionate amount of cargo is atowedD The hatch where the most cargo is stowed

考题 单选题What publications should a GMDSS Operator consult regarding the proper set-up and operation of vessel equipment().A ITU PublicationsB The manufacturers instruction manualsC Part 90 of the FCC Rules and RegulationsD Code of Federal Regulations,Title 47,Part 80,Subpart W

考题 单选题The()(折叠式舱盖) can fold slowly.A rolling type hatch coverB side-rolling hatch coverC folding type hatch coverD automatic hatch cover

考题 单选题The proper place()the sling is made up is the square of the hatch.A whichB whereC whenD how

考题 单选题When loading a cargo of taconite,proper sequencing of loading by hatch number is necessary to ().A provide the proper trimB prevent negative stability from developingC prevent excessive longitudinal stressesD control list