网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

材料:

Early on 5 November 1996,the 140,086 tonnes deadweight Malaysian flag bulk carrier Giga 2 was nearing completion of discharge of a cargo of iron ore at No.2 discharge berth,Port KemblA、Due to the vessel&39;s light condition,the unloader could not be positioned over No.1 hold,to remove the 1080 tonnes of cargo remaining in that particular hold.At the suggestion of the shift supervisor,ballast was pumped into No.4 hold,which was permissible under the vessel&39;s operations manual.Pumping of ballast into No.4 hold commenced at 0530.

After the lunch break,two terminal workers descended into No.5 hold,where the unloader was working,to clear iron ore from around the bottom of the forward spiral access ladder.The spiral ladder terminated at the top of the lower stool,six metres above the tank top.They had just completed this task and were about to climb the ladder when the bulkhead to the starboard side of the centre line,between No.5 hold and the ballasted No.4 hold,collapsed.Both workers were immediately engulfed by the deluge and,although one was able to haul himself clear,the other remained submerged.

The shift supervisor was working in his office ashore and,alerted by calls over the radio from the Hatchman,dashed on board and immediately descended the ladder into No.5 hold.Up to his neck in the swirling water and guided by the Hatchman above,he was able to grab hold of the submerged worker.Assisted by another terminal worker,who had followed him into the hold,he was able to haul the unconscious and apparently lifeless worker clear of the water.The shift supervisor then administered cardio-pulmonary resuscitation(CPR),which was successful in restoring breathing in the worker.Very shortly afterwards an ambulance officer arrived on the scene and administered oxygen,before the worker was lifted from the hold and taken to hospital.

问题:

The most probable reason that the unloader could not be positioned over No.1 hold was that ________.

A.the trim was too small

B.the trim was too big

C.the draft was too small

D.the draft was too big

No.4 hold into which ballast water was pumped was a ________.A.special hold which could only be used to adjust the trim and/or draft in cargo operation

B.double bottom tank usually not used as ballast tank

C.ballast tank

D.cargo hold

It is concluded that the depth of ballast water in No.4 Hold ________ before the bulkhead was collapsed.A.less than 1 meter

B.around 1 meter

C.around 2 meters

D.more than 3 meters

Of the following,it is ________ that prevented the submerged worker from hauling himself clear when the bulkhead collapsed.A.his weakness or,possibly,his small figure

B.the big depth of the ballast water

C.the big distance from the lower stool of the spiral ladder to the tank-top in No.5 Hold

D.the strong or swirling current in the ballast water

请帮忙给出每个问题的正确答案和分析,谢谢!


参考答案

更多 “ 材料:Early on 5 November 1996,the 140,086 tonnes deadweight Malaysian flag bulk carrier Giga 2 was nearing completion of discharge of a cargo of iron ore at No.2 discharge berth,Port KemblA、Due to the vessels light condition,the unloader could not be positioned over No.1 hold,to remove the 1080 tonnes of cargo remaining in that particular hold.At the suggestion of the shift supervisor,ballast was pumped into No.4 hold,which was permissible under the vessels operations manual.Pumping of ballast into No.4 hold commenced at 0530.After the lunch break,two terminal workers descended into No.5 hold,where the unloader was working,to clear iron ore from around the bottom of the forward spiral access ladder.The spiral ladder terminated at the top of the lower stool,six metres above the tank top.They had just completed this task and were about to climb the ladder when the bulkhead to the starboard side of the centre line,between No.5 hold and the ballasted No.4 hold,collapsed.Both workers were immediately engulfed by the deluge and,although one was able to haul himself clear,the other remained submerged.The shift supervisor was working in his office ashore and,alerted by calls over the radio from the Hatchman,dashed on board and immediately descended the ladder into No.5 hold.Up to his neck in the swirling water and guided by the Hatchman above,he was able to grab hold of the submerged worker.Assisted by another terminal worker,who had followed him into the hold,he was able to haul the unconscious and apparently lifeless worker clear of the water.The shift supervisor then administered cardio-pulmonary resuscitation(CPR),which was successful in restoring breathing in the worker.Very shortly afterwards an ambulance officer arrived on the scene and administered oxygen,before the worker was lifted from the hold and taken to hospital.问题:The most probable reason that the unloader could not be positioned over No.1 hold was that ________.A.the trim was too smallB.the trim was too bigC.the draft was too smallD.the draft was too bigNo.4 hold into which ballast water was pumped was a ________.A.special hold which could only be used to adjust the trim and/or draft in cargo operationB.double bottom tank usually not used as ballast tankC.ballast tankD.cargo holdIt is concluded that the depth of ballast water in No.4 Hold ________ before the bulkhead was collapsed.A.less than 1 meterB.around 1 meterC.around 2 metersD.more than 3 metersOf the following,it is ________ that prevented the submerged worker from hauling himself clear when the bulkhead collapsed.A.his weakness or,possibly,his small figureB.the big depth of the ballast waterC.the big distance from the lower stool of the spiral ladder to the tank-top in No.5 HoldD.the strong or swirling current in the ballast water请帮忙给出每个问题的正确答案和分析,谢谢! ” 相关考题
考题 Deadweight is ________ .A.the tonnes of the displacement of a vessel in water of a specific gravity of 1.025 at summer load water lineB.the difference in tonnes between the displacement in salt water at summer load waterline and the light weight of the vesselC.the cargoes in tonnes that can be loaded in a vessel at summer load water lineD.the bale capacity in cubic meters of a vessel

考题 The Vessel is a __________ bulk carrier which is permitted to carry grain in bulk without requiring any fittings under the Rules of the 1974 International Safety of Life at Sea Convention.A.self-loadingB.self-trimmingC.self-unloadingD.self-discharging

考题 Oil Record Book shall be carried on board by ______ which is engaged in voyages to ports or offshore terminals under the jurisdiction of other Parties to MARPOL 73/78.A.Oil tankerB.Bulk carrier of 400 gross tonnage and aboveC.Container vesselD.Passenger ship

考题 Shipboard Oil Pollution Emergency Plan shall be carried on board by ______.A.Oil tankerB.Bulk carrier of 400 gross tonnage and aboveC.Container vesselD.Passenger ship

考题 The port State control officer may ensure that ______ are exhibited in conspicuous places throughout the ship.A.survey planning documentB.muster listsC.bulk carrier bookletD.bulk carrier loading triangle

考题 Which vessel is most likely to be loaded full but not down ________.A.A bulk carrier loaded with heavy oreB.A bulk carrier loaded with steelC.A break bulk vessel loaded with palletized cargoD.A tanker loaded with heavy grain

考题 The type of carrier required to file a copy of freight tariffs would be the ______.A.Common carrierB.TrampC.Public vesselD.Bulk carrier

考题 On board a bulk carrier,______.A.harbour SWSF >seagoing SWSF,harbour SWBM >seagoing SWBMB.harbour SWSF seagoing SWSF,harbour SWBM seagoing SWBM

考题 最大的货船是油轮。()A、The largest cargo ship is the tankerB、The largest cargo ship is the container ship .C、The largest cargo ship is the bulk carrier.D、The largest cargo ship is the tug.

考题 When we meet a(军舰)(), we should lower national flag.A、warshipB、boatC、container shipD、bulk carrier

考题 bulk carrier()A、散货船B、锚C、舱D、矿物船

考题 The most modern type of dry cargo carrier is().A、multi-purpose shipB、the container shipC、bulk carrierD、general cargo ship

考题 ()(散货) is carried on the bulk carrier.A、Dangerous cargoB、Dry cargoC、Dry bulk cargoD、Bulk cargo

考题 It’s a/an ()(木材船).A、bargeB、oil shipC、lumber shipD、bulk cargo carrier

考题 英译中:Bulk carrier

考题 单选题bulk carrier()A 散货船B 锚C 舱D 矿物船

考题 名词解释题英译中:Bulk carrier

考题 单选题The deadweight of a bulk carrier consists of().A the weight of the ship's structure and its machineryB bunker and other consumable loadsC ballast loadsD all those weights,such as the weight of the bunkers,ballast,provisions and cargo

考题 单选题Every new crude oil tanker of 20000 tons deadweight and above and every new product carrier of 30000 tons deadweight and above shall be()with segregated ballast tanks.A compliedB providedC dividedD supplied

考题 单选题()(散货) is carried on the bulk carrier.A Dangerous cargoB Dry cargoC Dry bulk cargoD Bulk cargo

考题 单选题On a bulk chemical carrier,water should NOT be used as an extinguishing agent to fight a fire if the water may come into contact with the chemical called().A acrylic acidB benzeneC oleumD vinyl toluene

考题 单选题The()(石油-散货-矿石运输船)carries oil, bulk and ore.A LASHB OBOC PCCD LNG carrier

考题 单选题The bulk carrier, general cargo ship, reefer ship and lumber carrier are all ().A liquid cargo shipsB multi-purpose shipsC dry cargo shipsD container ships

考题 单选题This is to advise you that MV Water Way arrived at Sheerness at 1000 hours on May 14th and the formalities for entering the port were passed at 1040 hours on the same day.Now she is in all respects ready and fit to discharge her cargo of grain in bulk. Theses sentences are likely to appear in().A Declaration of Deadweight Tonnage of CargoB Notice of DemurrageC Notice of DespatchD Notice of Readiness

考题 单选题Every new crude oil tanker of 20000 tons deadweight and above and every new product carrier of 30000 tons deadweight and above shall be provided with().A segregated ballast tanksB moulded draught measurement systemC additional ballast water systemD dedicated clean ballast tanks system

考题 单选题When we meet a(军舰)(), we should lower national flag.A warshipB boatC container shipD bulk carrier

考题 单选题最大的货船是油轮。()A The largest cargo ship is the tankerB The largest cargo ship is the container ship .C The largest cargo ship is the bulk carrier.D The largest cargo ship is the tug.