网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
Companycom wants to apply a PTF to the p5 590 system. After doing a preview install, the output shows there is insufficient space in the /usr filesystem. The root volume group has no available physical partitions left. They do not want to add additional disk drives to the system, but have a jfs2 filesystem that is only 8% used. What could they do to utilize space in the jfs2 filesystem to apply this PTF?()
A
Backup the filesystem and recreate smaller
B
Use the chfs to reduce the filesystem size
C
Use cplv to copy filesystem to smaller size
D
Use migratepv to copy filesystem to smaller size
参考答案
参考解析
解析:
暂无解析
更多 “单选题Companycom wants to apply a PTF to the p5 590 system. After doing a preview install, the output shows there is insufficient space in the /usr filesystem. The root volume group has no available physical partitions left. They do not want to add additional disk drives to the system, but have a jfs2 filesystem that is only 8% used. What could they do to utilize space in the jfs2 filesystem to apply this PTF?()A Backup the filesystem and recreate smallerB Use the chfs to reduce the filesystem sizeC Use cplv to copy filesystem to smaller sizeD Use migratepv to copy filesystem to smaller size” 相关考题
考题
For the p5 590 and p5 595 servers, the HMC must be directly attached. Why is the use of a private service network between HMC and the p5 590 required?()A、The Bulk Power Controllers are dependent upon the HMC to provide them with DHCP addresses.B、A firewall is required to isolate the private network from any of the open networks to which the HMC is attached.C、Network communications can be implemented through an open network. No private network is required but it is recommended.D、All p5 590 and 595 servers are shipped with one service processor card. A private network is required to manage DHCP addresses.
考题
Companycom has a system running AIX 5.2 and wants to upgrade to AIX 5.3. What method would provide the quickest recovery if the upgrade failed?()A、Use alt_disk_installB、Backup image to NIM serverC、Backup using mksysb to DVD-RAMD、Apply the upgrade and do not commit
考题
Companycom wants to apply a PTF to the p5 590 system. After doing a preview install, the output shows there is insufficient space in the /usr filesystem. The root volume group has no available physical partitions left. They do not want to add additional disk drives to the system, but have a jfs2 filesystem that is only 8% used. What could they do to utilize space in the jfs2 filesystem to apply this PTF?()A、Backup the filesystem and recreate smallerB、Use the chfs to reduce the filesystem sizeC、Use cplv to copy filesystem to smaller sizeD、Use migratepv to copy filesystem to smaller size
考题
Companycom is installing a p5 590 with a HMC to manage LPARs. The customer is very concerned about security and wants to restrict network traffic that is not necessary. What is necessary for communication between the LPARs and the HMC?()A、An administrative VLAN with port 1808B、Port 657 which must remain open to TCP/IP and UDP trafficC、Network addresses are provided by DHCP services on the networkD、DHCP on the HMC is required to be on to communicate between LPAR and HMC
考题
Companycom is considering a partitioned solution which will require cumulative rPerf total of 150. The original sizing came back recommending a 32-way p5 590. However, they have a requirement for future scalability and availability is important. Which of the following would be the best reason to recommend a p5 595?()A、The p5 595 would allow for CODB、The p5 595 includes the Advanced Power Virtualization hardware and softwareC、The p5 595 is priced the same as the p5 590 given the same number/type of CPUsD、The p5 595 performance would be equivalent to the p5 590 given the same number/type of CPUs
考题
Companycom has just added some new disk drives to a p5 590. The customer needs to know the largest Logical Track Group that these drives will support. What is the best way to locate this information?()A、Use lquerypv to read the driveB、Use lspv and look at PP Size valueC、Look on the outside of the drive itselfD、Use bootinfo to find the LTG on the drive
考题
A system administrator is installing a p5 590 server with an HMC. After pulling the websm client down, it is not possible to connect to the HMC. The HMC can be pinged from the client. Which of the following settings should be verified next?()A、The routes on the HMCB、The firewall setting of the LAN adapterC、The name resolution protocol on the p5 590 serverD、The subnet mask settings on the Ethernet adapters
考题
Companycom has a p690 server with unused fiber (HBA) host bus adapters (feature code 6228) that they would like to reuse. They are interested in implementing Advanced Power Virtualization features particularly Virtual IO. What is the best way to proceed?()A、Upgrade the p690 to a p5 590 server running AIX 5.3B、Upgrade the p690 server to AIX 5.3 and implement Advanced Power VirtualizationC、Purchase a p5 590 with minimum resources and simply reuse the p690 unused fiber HBA adaptersD、Purchase a p5 590 that has all the needed resources and adapters for Advanced Power Virtualization
考题
A client has an existing Logical Partition (LPAR) on a p650 running AIX 5.2 and will be porting this LPAR to a p5 590. A mksysb has been run to tape, and a compatible tape drive is available and allocated to the target LPAR on the p5 590. What additional resource needs to be available on the p5 590?()A、A CD or DVD with installation mediaB、An internal SCSI adapter in the target LPARC、An Ethernet adapter for access to an FTP serverD、Advanced Power Virtualization feature of the p5 590
考题
Companycom is purchasing a 64-way p5 595. They have determined the location for the server is in a datacenter which does not have a raised floor. Which of the following would best meet the server requirements?()A、The server must be installed into a location with a raised floor for optimum system cooling and cable management.B、The server should be purchased as a p5 590 and then upgraded to a p5 595. This will eliminate the need for a raised floor environment.C、The server should be purchased as 32-way p5 595 and then upgraded to a 64-way. This will eliminate the need for a raised floor environment.D、The server can be installed into a location without a raised floor if an RPQ is obtained. It is a strong IBM recommendation for a raised floor, not a requirement.
考题
Companycom wants the application server LPAR to communicate with the database LPAR on a p5 590 without using network adapters. What does the customer need to install?()A、VIO ServerB、AIX 5.2 ML4C、Shared Ethernet AdapterD、AIX 5.3 with Advanced Power Virtualization
考题
Companycom has successfully established their p5 LPAR environment on a POWER5 p5 590 running AIX 5.2. They are now ready to move to Virtual IO. What would be required to do Virtual IO?()A、Apply APAR IY62262 to the current AIX 5.2 Maintenance level 04. Virtual IO Server is not required. B、Purchase Advanced POWER Virtualization software, upgrade to AIX 5.3 maintenance level 1 and apply APAR IY60349. Virtual IO Server is not required. C、Verify that there are enough resources to add a Virtual IO Server, upgrade to AIX 5.3 with APAR IY60349, create a Virtual IO Server after applying APAR IY62262. D、Verify that there are enough resources to add a Virtual IO Server, create a Virtual IO Server and apply APAR IY62262, verify that the system is at AIX 5.2 with Maintenance level 04.
考题
Companycom is purchasing a p5 590 which was configured with 60 Amp line cords. They have just indicated that their large datacenter is already wired for 100 Amp power circuits in the location where the server will be installed. What would be the recommended action?()A、Use the 60 Amp line cordsB、Change the 100 Amp connector to a 60 Amp circuitC、Submit an RPQ to order the p5 590 with 100 Amp power cordsD、Change the configuration and order the p5 590 with the 100 Amp power cords
考题
Companycom wants to buy a new p5 570 running AIX 5.3. The applications require 4 processors and 8GB of memory. There is a requirement to have a Virtual IO Server. What is the smallest p5 570 that should be sold to this customer?()A、4 processors 8GB of memoryB、5 processors 8GB of memoryC、4 processors 10GB of memoryD、5 processors 10GB of memory
考题
During the Solution Assurance for a p5 590, Companycom states there is a plan to install OEM Emulex cards in the p5 590. The customer assumes there will be no problem with the plan since IBM resells the Emulex cards. What is the correct response for the customer?()A、The IBM CE will install the cardB、The card will not be supported by IBMC、The AIX device driver should work fineD、The customer is correct, there should be no problem
考题
Which server houses the database partitions in the AIX BCU V2.1? ()A、 IBM System p5 570 B、 IBM System p5 575 C、 IBM System p5 590 D、 IBM System p5 595
考题
单选题A client has an existing Logical Partition (LPAR) on a p650 running AIX 5.2 and will be porting this LPAR to a p5 590. A mksysb has been run to tape, and a compatible tape drive is available and allocated to the target LPAR on the p5 590. What additional resource needs to be available on the p5 590?()A
A CD or DVD with installation mediaB
An internal SCSI adapter in the target LPARC
An Ethernet adapter for access to an FTP serverD
Advanced Power Virtualization feature of the p5 590
考题
单选题During the Solution Assurance for a p5 590, Companycom states there is a plan to install OEM Emulex cards in the p5 590. The customer assumes there will be no problem with the plan since IBM resells the Emulex cards. What is the correct response for the customer?()A
The IBM CE will install the cardB
The card will not be supported by IBMC
The AIX device driver should work fineD
The customer is correct, there should be no problem
考题
单选题Companycom wants to buy a new p5 570 running AIX 5.3. The applications require 4 processors and 8GB of memory. There is a requirement to have a Virtual IO Server. What is the smallest p5 570 that should be sold to this customer?()A
4 processors 8GB of memoryB
5 processors 8GB of memoryC
4 processors 10GB of memoryD
5 processors 10GB of memory
考题
单选题Companycom is trying to communicate with the service processor of the a new p5 590. However, the customer can not access the service processor. What needs to be done to fix this problem?()A
Enable DHCP server on the HMCB
Configure host name and IP address on DNS serverC
Manually set the IP address of the service processorD
Connect a RS-232 cable from the HMC to the service processor
考题
单选题Companycom has a p690 and currently has eight LPARs. They have purchased a p5 590 and wish to migrate their eight LPARs to the new server. The LPARs are running either AIX 5.2 or AIX 5.3 with the current maintenance. What is the LEAST disruptive method for this activity?()A
New install of AIXB
Migrate the 7040-61DC
Utilize alt_disk_installD
Use the enterprise back up strategy
考题
单选题Which server houses the database partitions in the AIX BCU V2.1? ()A
IBM System p5 570 B
IBM System p5 575 C
IBM System p5 590 D
IBM System p5 595
考题
单选题One of the key decision making factors in a very competitive opportunity will be cost. Companycom needs an aggregate rPerf rating of 120. What is the best solution?()A
Two p5 570 16 way 1.9 MHz machinesB
One p5 590 32 way 1.65 MHz machinesC
One p5 595 32 way 1.65 MHz machinesD
Two p5 570 16 way 1.65 MHz machines
考题
单选题A system administrator is installing a p5 590 server with an HMC. After pulling the websm client down, it is not possible to connect to the HMC. The HMC can be pinged from the client. Which of the following settings should be verified next?()A
The routes on the HMCB
The firewall setting of the LAN adapterC
The name resolution protocol on the p5 590 serverD
The subnet mask settings on the Ethernet adapters
考题
单选题Companycom has successfully established their p5 LPAR environment on a POWER5 p5 590 running AIX 5.2. They are now ready to move to Virtual IO. What would be required to do Virtual IO?()A
Apply APAR IY62262 to the current AIX 5.2 Maintenance level 04. Virtual IO Server is not required. B
Purchase Advanced POWER Virtualization software, upgrade to AIX 5.3 maintenance level 1 and apply APAR IY60349. Virtual IO Server is not required. C
Verify that there are enough resources to add a Virtual IO Server, upgrade to AIX 5.3 with APAR IY60349, create a Virtual IO Server after applying APAR IY62262. D
Verify that there are enough resources to add a Virtual IO Server, create a Virtual IO Server and apply APAR IY62262, verify that the system is at AIX 5.2 with Maintenance level 04.
考题
单选题Companycom wants to reduce the number of copper, Ethernet adapters on their 4 way p5 570 running AIX 5.3 used in each of the four LPARs. Companycom has one database LPAR, two application LPARs, and one web LPAR. Only the Web LPAR needs to communicate with the outside world. What is the minimum number of Ethernet adapters that should be provided to ensure redundancy and no single point of failure?()A
One single port Ethernet adapterB
Four dual port Ethernet adaptersC
Two single port Ethernet adaptersD
Eight single port Ethernet adapters
考题
单选题Companycom wants to know how to keep track of the latest level of microcode for their p5 systems to stay current. What is the best way to monitor for new microcode?()A
Run lscfg -vl, and check the ROM levelsB
Run cfgmgr -v, and check the ROM levelsC
Run inventory scout, and check the installed levelsD
Run lslpp -l grep devices, and check the filesets installed
考题
单选题Companycom has a 16 way 1.65 GHz p5 590 and wants to install a i5/OS partition on their server. The customer wants to keep installation costs to a minimum by sharing devices between all LPARs. Before the operating system can be installed in this partition, the customer was told that there are certain limitations that must be observed. What are these limitations?()A
When the i5/OS partition is housed in the p5 590, the HMC allows seamless installation in a partition as long as the minimum one processor, 256 MB of memory, one Ethernet and one boot adapter/disk is available from internal hardware. B
V5R3 and later releases of i5/OS can be installed on a POWER5 server partition. Only one processor can be assigned to the i5/OS. A special expansion tower must be ordered. This expansion tower and its devices can be shared with other OS partitions. C
When the i5/OS partition is housed in the p5 590, the 5250 Twinaxial console must be used to set up the partition. Only one processor can be assigned to the i5/OS partition. A special expansion tower must be ordered to house the IOPs. Devices in the special expansion tower can be shared with other Linux partitions. D
V5R3 and later releases of i5/OS can be installed on IBM eServer p5 servers. i5/OS can run on two processors in the p5 590. A special expansion tower must be ordered. This expansion tower and its devices cannot be shared with other OS partitions. The iSeries expansion towers are seen by the IBM eServer p5 server as an I/O subsystem.
热门标签
最新试卷