A customer has just purchased an 8-core POWER 570 which has two dual port 1 Gbps  Integrated Virtual Ethernet (IVE) adapters. The customer wants to implement queue pairs (QPs) to take advantage of parallel processing of network traffic to its client logical partitions. Assuming that the system is to utilize the IVEs in both CECs,  which configuration will allow a logical partition to utilize the entire eight cores for network traffic processing?()
A

 Set Multiple Core Scaling (MCS) value of the port group to 8 and set multiple core parameter of the client Ethernet adapters to yes.

B

 Set Multiple Core Scaling (MCS) value of the port group to 4 and set multiple core parameter of the client Ethernet adapters to yes.

C

 Set Multiple Core Scaling (MCS) value of one of the physical port groups to 4 and set multiple core parameter of the client Ethernet adapters to yes.

D

 Set Multiple Core Scaling (MCS) value of one of the physical port groups to 8 and set the multiple core parameter of the client Ethernet adapters to yes.


参考答案

参考解析
解析: 暂无解析
更多 “单选题A customer has just purchased an 8-core POWER 570 which has two dual port 1 Gbps  Integrated Virtual Ethernet (IVE) adapters. The customer wants to implement queue pairs (QPs) to take advantage of parallel processing of network traffic to its client logical partitions. Assuming that the system is to utilize the IVEs in both CECs,  which configuration will allow a logical partition to utilize the entire eight cores for network traffic processing?()A  Set Multiple Core Scaling (MCS) value of the port group to 8 and set multiple core parameter of the client Ethernet adapters to yes.B  Set Multiple Core Scaling (MCS) value of the port group to 4 and set multiple core parameter of the client Ethernet adapters to yes.C  Set Multiple Core Scaling (MCS) value of one of the physical port groups to 4 and set multiple core parameter of the client Ethernet adapters to yes.D  Set Multiple Core Scaling (MCS) value of one of the physical port groups to 8 and set the multiple core parameter of the client Ethernet adapters to yes.” 相关考题
考题 A technician has just finished installing a new NIC into a customer’s desktop. Which of thefollowing should the technician do NEXT?() A. Perform a full system backup.B. Follow up with the customer, verifying satisfaction.C. Ask their manager to contact the customer.D. Perform a complimentary virus scan.

考题 A current Sun Solaris customer has just purchased their first p5 590. During the Solution Assurance, the backup requirements were discussed. Which of the following should be recommended to the customer with regards to restoring rootvg?()A、mksysbB、restvgC、AIX install CDsD、Veritas NetBackup

考题 A user has purchased a laptop that has no means to charge the battery. Which of the followingwould the user MOST likely purchase?()A、USB cableB、AC adapterC、PCMCIA cardD、Replacement battery

考题 A customer’s small heterogeneous enterprise has grown over time to more than 500 client systems, and the administrator cannot add new servers to the management database.  Which of the following is the most likely source of the problem?()A、The management server has reached its size limitation.B、Additional agent licenses must be purchased.C、The CPU and Memory requirements need to be upgraded.D、The default JET database has reached its size limitation.

考题 A customer has a large UNIX environment and has engaged a pSeries technical specialist to work on a solution with them.  Which of the following statements would best establish UNIX credibility with a knowledgeable customer?()A、The technical support specialist has completed a UNIX course at college.B、The technical specialist has supported several similar projects and has earned an IBM AIX certification.C、The technical support specialist’s company sells $3M of UNIX computer systems every year.D、The technical support specialist has sold and installed at least a dozen Apple and iSeries systems with POWER processors.

考题 A customer has just purchased an 8-core POWER 570 which has two dual port 1 Gbps  Integrated Virtual Ethernet (IVE) adapters. The customer wants to implement queue pairs (QPs) to take advantage of parallel processing of network traffic to its client logical partitions. Assuming that the system is to utilize the IVEs in both CECs,  which configuration will allow a logical partition to utilize the entire eight cores for network traffic processing?()A、 Set Multiple Core Scaling (MCS) value of the port group to 8 and set multiple core parameter of the client Ethernet adapters to yes.B、 Set Multiple Core Scaling (MCS) value of the port group to 4 and set multiple core parameter of the client Ethernet adapters to yes.C、 Set Multiple Core Scaling (MCS) value of one of the physical port groups to 4 and set multiple core parameter of the client Ethernet adapters to yes.D、 Set Multiple Core Scaling (MCS) value of one of the physical port groups to 8 and set the multiple core parameter of the client Ethernet adapters to yes.

考题 A customer has a requirement for a single AIX LPAR to be highly available. The customer only has enough funding to purchase a single system. Which would be the most critical option to mitigate AIX availability?()A、Dual power supplies.B、Twice the amount of disk.C、Two dual-port LHEA adapters.D、Two dual-port fibre channel adapters.

考题 A customer has a key application running in a logical partition on a POWER5 system. The customer wants the ability to run the application with minimal down time using Live Partition Mobility.  Which of the following is the minimum PowerVM edition and hardware configuration that will support the customer requirement?()A、 PowerVM Standard Edition on POWER6 hardwareB、 PowerVM Standard Edition with POWER5 hardware C、 PowerVM Enterprise Edition with POWER6 hardwareD、 PowerVM Enterprise Edition with POWER5 hardware

考题 A customer has been working with your company to purchase an iDataPlex cluster. They have a configuration from IBM and are getting ready to place an order. Which should be done of the following?()A、A solution sizing questionnaireB、Verify the customer has the proper racksC、A Technical Delivery AssessmentD、Verify the customer has enough cooling in the computer room

考题 A p5 570 12 way was purchased with the plan to install six LPARs running AIX 5.2. The machine has 12 disks spread evenly over the internal server drawers. The customer would now like to add a seventh LPAR. Which of the following should be added for the seventh LPAR boot device?()A、An additional 7311-D10 drawerB、An adapter to boot off a SAN deviceC、An additional disk to the media bayD、Two disks to the internal configuration

考题 A customer has requested five rack mounted servers, and a rack. They want redundant power connections. Which of the following is required to meet these requirements?()A、Redundant power supplies on the serversB、Redundant PDUs in the rackC、edundant power supplies in the servers and redundant PDUs in the rackD、Redundant power supplies in the servers, redundant PDUs in the rack, and Active Energy Manager (AEM)

考题 A customer has been quoted a DS8800. Which part of the TDA process would ensure that there isenough power in the customer location to operate the system?()A、 Pre-sale B、 Post-sale C、 Pre-install D、 Post-install

考题 A customer has just received three enterprise systems that support a total of 48 LPARs. Which installation method expedite the process?()A、Network installation managerB、Boot from installation mediaC、A migration installD、Copy the system using the HMC

考题 A customer is installing a new x3850 X5 server and has purchased a warranty upgrade on the server to 24 x 7 four hour response. The customer requested IBM help with setting up the RAID adapter. The customer was told IBM would not help them. Which of the following should be verified first?()A、The customer used their IBM Customer NumberB、The customer has activated their base warrantyC、The customer purchased Remote Technical Support ServicepacD、The customer escalated the issue to the Duty Manager

考题 A customer has the following equipment installed in their data center:  (1)an IBM BladeCenter H chassis (2)two power supplies  (3)six HS22V blades (4)three Nortel 1/10 GB ESMs The retail customer purchased a new HX5 with MAX5.  Which of the following must be added to install the HX5 with MAX5?()A、Two additional power suppliesB、Fibre Channel (FC) switches and SAN storageC、A Nortel 1/10 GB ESMD、SSD for the HX5

考题 A retail customer has an 8-core Power 740 server with 2 partitions. Production has 4 dedicated cores and the test partition has 2 dedicated cores. Both partitions run during the day without problems. At night, batch processing is exceeding the run window. Which solution addresses this problem without requiring additional hardware?()A、AddingVMControl will automate processor resource allocation during peak workloads.B、Enable Dynamic Symmetric Multithreading in the HMC to balance workloads across processors.C、Add processing resources during the times they are required using Utility Capacity on Demand.D、Changing the partitions to Uncapped can make use of additional processor cycles during peak workloads.

考题 A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems.  They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems.  What is a key requirement that they need to plan for with the new HMC?()A、A desk, as it not rack mountableB、Ethernet connections to the POWER5 systemsC、Serial connections to the POWER5 systemsD、USB connections for the keyboard and mouse

考题 单选题A customer has been quoted a DS8800. Which part of the TDA process would ensure that there isenough power in the customer location to operate the system?()A  Pre-sale B  Post-sale C  Pre-install D  Post-install

考题 单选题Companycom has just purchased a p5 570 with AIX 5.3. The customer would like to add a training LPAR to the system, but no processors are available. All of the partitions are using dedicated resources. The test LPAR is using one processor and has a 90% CPU idle rate. What can be done to setup this training LPAR quickly without disabling their current environment?()A Use AIX 5.3 which supports micro-partitioning for both the test and training LPARSB Use DLPAR to move resources from the test LPAR to training when training is activeC Install Partition Load Manager to share resources between the test and training environmentsD Install Advanced Power Virtualization and then use micro-partitioning for both the test and training LPARs

考题 单选题A technician has just finished installing a new NIC into a customer’s desktop. Which of thefollowing should the technician do NEXT?()A Perform a full system backup.B Follow up with the customer, verifying satisfaction.C Ask their manager to contact the customer.D Perform a complimentary virus scan.

考题 单选题A customer recently purchased a new x3550 M3 server and one of the hard drives has failed. The customer has a standard warranty. They called you asking for a replacement. Which action should the customer take?()A Contact the IBM FTSS to replace the driveB Contact the IBM CSR or SSR to replace the driveC Order a replacement driveD Contact IBM Service

考题 单选题An administrator has an existing HMC and POWER6 570 connected to a network switch.  The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()A An additional switch for the new HMc  B Asynchronous adapters on the new HMcC The two 570 servers are directly connected to the new HMc  D One 570 is directly connected to the new HMC and the other is directly connected to the existing HMc

考题 单选题A customer has a large UNIX environment and has engaged a pSeries technical specialist to work on a solution with them.  Which of the following statements would best establish UNIX credibility with a knowledgeable customer?()A The technical support specialist has completed a UNIX course at college.B The technical specialist has supported several similar projects and has earned an IBM AIX certification.C The technical support specialist’s company sells $3M of UNIX computer systems every year.D The technical support specialist has sold and installed at least a dozen Apple and iSeries systems with POWER processors.

考题 单选题A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers.  The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server.  How can the specialist help the customer?()A Explain to the customer that they need an additional HMC for the POWER5 system.B Obtain a PO from the customer to purchase additional serial connections to the HMC.C Obtain a PO from the customer to purchase additional Ethernet connections to the HMC.D Explain to the customer that they need a firmware update on the HMC to support both POWER4 and POWER5.

考题 单选题A customer is installing a new x3850 X5 server and has purchased a warranty upgrade on the server to 24 x 7 four hour response. The customer requested IBM help with setting up the RAID adapter. The customer was told IBM would not help them. Which of the following should be verified first?()A The customer used their IBM Customer NumberB The customer has activated their base warrantyC The customer purchased Remote Technical Support ServicepacD The customer escalated the issue to the Duty Manager

考题 单选题Company.com has recently received a new p5-570 in the data center and wants to Micro-Partition the server. The customer already has an existing HMC connected to a p690. Which of the following actions should the technical specialist take?()A Order a POWER5 HMCB Connect to the existing HMCC Install an 8-port asynchronous card in the managed server to connect to the existing HMCD Install an additional network card to the existing HMC and connect to the POWER5 service processor

考题 单选题A customer has just received three enterprise systems that support a total of 48 LPARs. Which installation method expedite the process?()A Network installation managerB Boot from installation mediaC A migration installD Copy the system using the HMC

考题 单选题An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()A An additional switch for the new HMCB Asynchronous adapters on the new HMCC The two 570 servers are directly connected to the new HMCD One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC