网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
The work of Cleaning holds is finished.()
A

清舱工作结束。

B

清舱工作开始。

C

装货工作开始。

D

卸货工作结束。


参考答案

参考解析
解析: 暂无解析
更多 “单选题The work of Cleaning holds is finished.()A 清舱工作结束。B 清舱工作开始。C 装货工作开始。D 卸货工作结束。” 相关考题
考题 His uncle’s work is ________ the building. (A) clean(B) cleans(C) to clean(D) cleaning

考题 () and I’ll get the work finished. A、Have one more hourB、One more hourC、Given one more hourD、I have one more hour

考题 1 like cleaning the bike because I can be outside.(对划线部分提问)_________ _________ you like cleaning the bike?

考题 Please arrange for ________ to clean the holds before my vessel takes cerealA.cargo surveyorsB.stevedore gangsC.duty sailorsD.cleaning gangs

考题 Cleaning, painting and repair work is known as ______.A.maintenance workB.sailor’s workC.daily work

考题 They()since last night. They are about to finish the work.A. are cleaning the systemB. have been cleaning the systemC. had cleaned the system

考题 I will go to see you()I have finished. A、as soon asB、whileC、beforeD、as far as

考题 Please arrange ______ a cleaning gang to sweep out all the ship’s cargo holds to enable her to receive cargo at this port.A.toB.withC.byD.For

考题 Rapid application development(RAD) systems purport to lighten the developer's(46)by making it easy to program an application with simple intuitive steps.RAD tools(47)the developer everything needed to construct a fully functional application quickly and easily. They make short work of modifying the developed product to(48)changes after the program is finished. Applications developed with RAD tools are constructed as they are envisioned. As an application's real usefulness(49), the developer armed with RAD tools should be able to(50)on new features with little fuss.A.burdenB.troubleC.taskD.weight

考题 每天早上值班水手必须在驾驶台做清洁工作。()A、Every morning the duty sailor must do the cleaning work on the bridge.B、Every evening the duty sailor must do the cleaning work on the bridge.C、Every morning the duty sailor must do the painting work on the bridge.

考题 清洁,涂漆,修理工作称为船舶保养工作。()A、Cleaning, painting and repairing work are known as sailor’s work.B、Cleaning, painting and repairing work are known as maintenance work.C、Painting, repairing and cleaning work are known as maintenance work.D、Cleaning, painting and repairing work are known as daily work.

考题 The work of Cleaning holds is finished.()A、清舱工作结束。B、清舱工作开始。C、装货工作开始。D、卸货工作结束。

考题 The sailor taking ()watch should do cleaning work on the bridge.A、0 to 4B、4 to 8C、8 to 12D、12 to 16

考题 The sailors do cleaning and repair work ()the bosun.A、under the supervision ofB、with the help ofC、in charge ofD、in the charge of

考题 Cleaning is a frequent ()on board a ship.A、dutyB、responsibilityC、jobD、work

考题 The duty () should do the cleaning work every morning.A、officerB、motormanC、sailorD、engineer

考题 Cleaning, painting and repairing work is known as ()work.A、sailors’B、motormen’sC、dailyD、maintenance

考题 单选题The sailors do cleaning and repair work ()the bosun.A under the supervision ofB with the help ofC in charge ofD in the charge of

考题 单选题The sailor taking ()watch should do cleaning work on the bridge.A 0 to 4B 4 to 8C 8 to 12D 12 to 16

考题 单选题After the initial cleaning of fule gas in an inert gas system is passed through what devoce for final cleaning?().A ScrubberB DemisterC Deck water sealD Final filter

考题 单选题After the initial cleaning of flue gas in an inert gas system the gas is passed through what device for final cleaning?().A ScrubberB DemisterC Deck water sealD Final filter

考题 单选题Cleaning holds are to clean hold from ().A fore to aftB aft to foreC left to rightD right to left

考题 单选题船舶发生溢油事故时,水手的主要工作是清理油污。()A When oilspilling happens on board, the sailors’ work is to do oil-cleaning.B When oilspilling happens on board, the sailors’ work is painting.C When oilspilling happens on board, the sailors’ work is to do some repair work.D When oilspilling happens on board, the captain is in over command of it.

考题 单选题每天早上值班水手必须在驾驶台做清洁工作。()A Every morning the duty sailor must do the cleaning work on the bridge.B Every evening the duty sailor must do the cleaning work on the bridge.C Every morning the duty sailor must do the painting work on the bridge.

考题 单选题When the vessel entering the dock, the first work that engineer should contact with the shipyard ()A releasing the boiler waterB the explosion detecting and cleaning for the fuel tankC the docking project related itemD shore power and fire fighting water supply

考题 单选题The boat drill is finished. You are ()(解散).A dismissedB dismissC goneD left

考题 单选题清洁,涂漆,修理工作称为船舶保养工作。()A Cleaning, painting and repairing work are known as sailor’s work.B Cleaning, painting and repairing work are known as maintenance work.C Painting, repairing and cleaning work are known as maintenance work.D Cleaning, painting and repairing work are known as daily work.