网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
When installing a new PCIe network card, when should manufacturer software and drivers beinstalled?()
A

Before inserting the PCIe network card in the case

B

After inserting the new PCIe network card in the case

C

They will be automatically loaded after installation

D

Load them concurrently with the PCIe network card


参考答案

参考解析
解析: 暂无解析
更多 “单选题When installing a new PCIe network card, when should manufacturer software and drivers beinstalled?()A Before inserting the PCIe network card in the caseB After inserting the new PCIe network card in the caseC They will be automatically loaded after installationD Load them concurrently with the PCIe network card” 相关考题
考题 When installing a new PCIe network card, when should manufacturer software and drivers beinstalled?() A. Before inserting the PCIe network card in the caseB. After inserting the new PCIe network card in the caseC. They will be automatically loaded after installationD. Load them concurrently with the PCIe network card

考题 A customer would like to buy a new Power 750 and attach 2 PCIe I/O drawers. What is the minimum configuration which will support this?()A、One processor card and one GX+ expansion cardB、Two processor cards and one GX++ expansion cardC、One processor card, one GX+ expansion card, and one GX++ expansion cardD、Two processor cards, one GX+ expansion card, and one GX++ expansion card

考题 On an Aironet card, LED 0 and LED 1 are blinking alternately.  What does this indicate? ()A、The Aironet card is in power save mode.B、The Aironet card is looking for a network association.C、The Aironet card is joined to a network, but there is no network activity.D、The Aironet card is joined to a network, and there is network activity.

考题 An administrator replaces the network card in a web server. After replacing the network card some users can access the server but others cannot.  Which of the following is the FIRST thing the administrator should check?()A、 Default gatewayB、 The ports on the switchC、 Port security on the servers switch portD、 Ethernet cable

考题 An administrator replaces the network card in a web server. After replacing the network card some users can access the server but others cannot. Which of the following is the FIRST thing the administrator should check?()A、Default gatewayB、The ports on the switchC、Port security on the server's switch portD、Ethernet cable

考题 A technician installed a new video card on a motherboard which has onboard video. When the monitor was plugged into the new card and the power was turned on, a no signal message appeared on the monitor. Which of the following is MOST likely the issue?()A、In the BIOS, the onboard video adapter must be disabled.B、The video resolution is set too high.C、The LCD panel is defective.D、The drivers for the new video card must be installed before installing the card.

考题 A user has just moved a PC from one office to another. The patch cable and the NIC do notappear to be functioning in the new office but were working before the move. The patch cable is plugged in correctly to both the NIC and the wall jack. Which of the following actions should the technician take FIRST?()A、Verify that the network card is compatible with the operating system.B、Verify that the port on the switch is enabled.C、Update the network card driver.D、Replace the network cable with a crossover cable.

考题 When installing a new PCIe network card, when should manufacturer software and drivers beinstalled?()A、Before inserting the PCIe network card in the caseB、After inserting the new PCIe network card in the caseC、They will be automatically loaded after installationD、Load them concurrently with the PCIe network card

考题 What is a design consideration when using existing PCIe I/O drawers in a maximum bandwidth/throughput configuration on a new Power 750 system?()A、The new system requires 1 installed processor card for the GX++ bus adapterB、The new system requires a minimum of 2 installed processor cards for the GX++ bus adapterC、The new system requires a minimum of 3 installed processor cards and the HPC InfiniBand cluster adapterD、The new system requires 1 installed processor card for the GX++ bus adapter and the HPC InfiniBand cluster adapter

考题 You are the administrator of Company’s network. You have disabled the integrated sound card on your Windows 2000 Professional computer by removing a hardware jumper and install a new PCI sound card. You restart the computer but the sound card does not function correctly. You use Device Manager to view the hardware settings on the computer as shown in the Device Manager window. (Click the Exhibit button.) You want the PCI sound card to function properly. What should you do? ()A、Use System in Control Panel to uninstall the integrated sound card.B、Use Device Manager to change the IRQ for the new sound card to a different setting from the disabled integrated sound card.C、Move the sound card to a different PCI slot.D、Uninstall the integrated sound card and disable Plug and Play detection for the new device. E、Use Device Manager to update the drivers for the new soundcard.

考题 You work as a network administrator at ABC.com. The ABC.com network consists of a single domain named ABC.com. All servers on the ABC.com network have Windows Server 2012 R2 installed. The Hyper-V server role is installed on a server named ABC_SR07.ABC_SR07 has a legacy network card that you use when creating a virtual machine named ABC_VT01.  What is the first thing you should do when assigning bandwidth to ABC_VT01?()A、You need to install a Hyper-V Virtual Switch on ABC_SR07.B、You need to install Integration Services on ABC_VT01.C、You need to remove the legacy network card and replace it with a new one.D、You need to install a second legacy network card on ABC_SR07.E、You need to create an external virtual network.

考题 Five of your company’s employees have Windows 2000 Professional portable computers. The employees use their portable computers in a network-enabled docking station when they are at their desks. When the employees are working outside of the office, they use the portable computers without network connectivity.   You have just installed wireless PC Card network adapters in the portable computers so that the employees can access the network when they are in conference rooms in the office building.   You need to configure the portable computers for optimum performance in all of the working environments. What should you do? ()A、Configure the wireless PC Card network adapters to use DHCP to obtain their IP addresses.B、Configure three different hardware profiles on each portable computer.C、Configure the wireless PC Card network adapters to use Automatic Private IP Addressing (APIPA) when they cannot detect a DHCP server.D、Instruct each employee to unplug the wireless PC Card network adapter whenever the portable computer is attached to a network-enabled.

考题 You are the administrator of a small server based network. While installing Windows 2000 Professional on your computer, you configure the network adapter card for each computer to use TCP/IP and assign static IP setting information. During installation the setup detects and installs the 10/100 MBPS UTP only network adepter card on computers 6  8 and 10 MBPS/UTP combination adapter card on the other 7 computers. You accept the default settings for the network adapter card and finish installing the network adapter card. All computers are connected to 10/100 switch that has category 5 UTP cabling. After installation you find that computer 6 and 8 can communicate with each other. You want all 9 computers on your network to be able to communicate with each other.   What should you do?()A、Configure the 10/100 switch to transfer only at the 100 MBPS rate.B、Configure 10/100 MBPS network adapter card to switch all the computers at 10 MBPS rate.C、Change the combination network adapter card to use the BNC transceiver setting.D、Change the combination network adapter card to use the UTP transceiver setting.

考题 单选题You are the administrator of Company’s network. You have disabled the integrated sound card on your Windows 2000 Professional computer by removing a hardware jumper and install a new PCI sound card. You restart the computer but the sound card does not function correctly. You use Device Manager to view the hardware settings on the computer as shown in the Device Manager window. (Click the Exhibit button.) You want the PCI sound card to function properly. What should you do? ()A Use System in Control Panel to uninstall the integrated sound card.B Use Device Manager to change the IRQ for the new sound card to a different setting from the disabled integrated sound card.C Move the sound card to a different PCI slot.D Uninstall the integrated sound card and disable Plug and Play detection for the new device. E Use Device Manager to update the drivers for the new soundcard.

考题 单选题What is a design consideration when using existing PCIe I/O drawers in a maximum bandwidth/throughput configuration on a new Power 750 system?()A The new system requires 1 installed processor card for the GX++ bus adapterB The new system requires a minimum of 2 installed processor cards for the GX++ bus adapterC The new system requires a minimum of 3 installed processor cards and the HPC InfiniBand cluster adapterD The new system requires 1 installed processor card for the GX++ bus adapter and the HPC InfiniBand cluster adapter

考题 单选题An administrator replaces the network card in a web server. After replacing the network card some users can access the server but others cannot. Which of the following is the FIRST thing the administrator should check?()A Default gatewayB The ports on the switchC Port security on the server's switch portD Ethernet cable

考题 问答题Practice 20  Card-holders of Holiday Sunshine Hotel automatically become registered members of its Reservation(预定) Network. They are able to enjoy the services offered by its member hotels. We encourage card-holders to use the card as often as possible, and they will be awarded with prizes when their marks(积分)reach a certain amount.  Before checking into a hotel, please always reserve your room first. When you check out, you will only have to pay the member price.

考题 单选题A user has just moved a PC from one office to another. The patch cable and the NIC do notappear to be functioning in the new office but were working before the move. The patch cable is plugged in correctly to both the NIC and the wall jack. Which of the following actions should the technician take FIRST?()A Verify that the network card is compatible with the operating system.B Verify that the port on the switch is enabled.C Update the network card driver.D Replace the network cable with a crossover cable.

考题 单选题A technician installed a new video card on a motherboard which has onboard video. When the monitor was plugged into the new card and the power was turned on, a no signal message appeared on the monitor. Which of the following is MOST likely the issue?()A In the BIOS, the onboard video adapter must be disabled.B The video resolution is set too high.C The LCD panel is defective.D The drivers for the new video card must be installed before installing the card.

考题 单选题When installing a new PCIe network card, when should manufacturer software and drivers beinstalled?()A Before inserting the PCIe network card in the caseB After inserting the new PCIe network card in the caseC They will be automatically loaded after installationD Load them concurrently with the PCIe network card

考题 单选题You have a 10Mbps network card in your computer. You install a 100Mbps network card on your computer and restart the computer. The 100Mbps card in not working due to a conflict with the10Mbps card. You want only the 100Mbps card to be active. What should you do to  disable the10 Mbps network adapter?()A Remove the 100MB Ethernet adapter driver by using device manager.B Remove the drivers for both Ethernet adapters cards by using device manager. C Install the 100MB Ethernet adapter in different PC card slots.D Disable the device drivers for the 10Mb card using by using Device Manager.

考题 单选题An administrator replaces the network card in a web server. After replacing the network card some users can access the server but others cannot.  Which of the following is the FIRST thing the administrator should check?()A  Default gatewayB  The ports on the switchC  Port security on the servers switch portD  Ethernet cable

考题 单选题After installing a new video card, the computer loads Windows and continuously reboots. Which of the following would be the FIRST step that a technician should take?()A Run CHKDSKB Boot to ERDC Run MSCONFIGD Go into Safe Mode

考题 单选题You are the administrator of a small server based network. While installing Windows 2000 Professional on your computer, you configure the network adapter card for each computer to use TCP/IP and assign static IP setting information. During installation the setup detects and installs the 10/100 MBPS UTP only network adepter card on computers 6  8 and 10 MBPS/UTP combination adapter card on the other 7 computers. You accept the default settings for the network adapter card and finish installing the network adapter card. All computers are connected to 10/100 switch that has category 5 UTP cabling. After installation you find that computer 6 and 8 can communicate with each other. You want all 9 computers on your network to be able to communicate with each other.   What should you do?()A Configure the 10/100 switch to transfer only at the 100 MBPS rate.B Configure 10/100 MBPS network adapter card to switch all the computers at 10 MBPS rate.C Change the combination network adapter card to use the BNC transceiver setting.D Change the combination network adapter card to use the UTP transceiver setting.

考题 单选题On an Aironet card, LED 0 and LED 1 are blinking alternately.  What does this indicate? ()A The Aironet card is in power save mode.B The Aironet card is looking for a network association.C The Aironet card is joined to a network, but there is no network activity.D The Aironet card is joined to a network, and there is network activity.

考题 单选题Five of your company’s employees have Windows 2000 Professional portable computers. The employees use their portable computers in a network-enabled docking station when they are at their desks. When the employees are working outside of the office, they use the portable computers without network connectivity.   You have just installed wireless PC Card network adapters in the portable computers so that the employees can access the network when they are in conference rooms in the office building.   You need to configure the portable computers for optimum performance in all of the working environments. What should you do? ()A Configure the wireless PC Card network adapters to use DHCP to obtain their IP addresses.B Configure three different hardware profiles on each portable computer.C Configure the wireless PC Card network adapters to use Automatic Private IP Addressing (APIPA) when they cannot detect a DHCP server.D Instruct each employee to unplug the wireless PC Card network adapter whenever the portable computer is attached to a network-enabled.

考题 单选题A customer would like to buy a new Power 750 and attach 2 PCIe I/O drawers. What is the minimum configuration which will support this?()A One processor card and one GX+ expansion cardB Two processor cards and one GX++ expansion cardC One processor card, one GX+ expansion card, and one GX++ expansion cardD Two processor cards, one GX+ expansion card, and one GX++ expansion card

考题 单选题You work as a network administrator at ABC.com. The ABC.com network consists of a single domain named ABC.com. All servers on the ABC.com network have Windows Server 2012 R2 installed. The Hyper-V server role is installed on a server named ABC_SR07.ABC_SR07 has a legacy network card that you use when creating a virtual machine named ABC_VT01.  What is the first thing you should do when assigning bandwidth to ABC_VT01?()A You need to install a Hyper-V Virtual Switch on ABC_SR07.B You need to install Integration Services on ABC_VT01.C You need to remove the legacy network card and replace it with a new one.D You need to install a second legacy network card on ABC_SR07.E You need to create an external virtual network.