网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
WebLogic Node Manager can be used to manage the life cycle of WebLogic servers. WebLogic Node Manager is installed and started ().
- A、Per Machine
- B、Per Domain
- C、Per Managed Server
- D、Per Admin Server
参考答案
更多 “WebLogic Node Manager can be used to manage the life cycle of WebLogic servers. WebLogic Node Manager is installed and started ().A、Per MachineB、Per DomainC、Per Managed ServerD、Per Admin Server” 相关考题
考题
Weblogic集群启动顺序正确的是()A、manage、proxv、adminB、proxy、admin,manageC、proxy、manage、adminD、admin、proxy、manage
考题
Company.com has a three-node cluster (Node ’A’, Node ’B’, and Node ’C’) with three resource Groups (rg1, rg2, and rg3). Node ’A’ has twice as many CPUs and twice as much memory as the two test add development Nodes ’B’ and ’C’. During normal production processing, all resource groups are active on Node ’A’. What is most efficient way to configure the cluster to manage the workload?() A、 Use thee cascading resource groups where ’rg1’ and ’rg2’ fallover to Node ’B’ and ’rg3’ falls over to Node ’C’B、 Use Dynamic Node Priority resource groups with a priority chain consisting of Node ’A’ then Node ’B’ then Node ’C’C、 Use three rotating resource groups with ’rg1’ and ’rg2’ falling over to node ’B’ and ’rg3’ falling over to Node ’C’D、 Upgrade Nodes ’B’ and ’C’ to be equal to Node ’A in CPU and memory resources to enable the cluster to synchronize three resource groups
考题
An administrator has a two node cluster, Node1 and Node2, running resource group rg1. The resource groupis active on Node1. The administrator stopped cluster services and unmanaged the resource group on Node1to work on a problem. Now the administrator needs to move rg1 to Node2. Which of the following will achievethis?()A、Perform a clstart on Node1 with ’Manage Resource Groups’ set to ’Manually’ and select the destination ofNode2B、Perform a resource group move operation from Node1 to Node2 and select the option to ’Re-manageResource Groups’ set to ’Automatically’C、Perform a clstop on Node1 with option to move resource groups, this will release the resource group fromNode1 and accquire the resource group on Node2.D、Perform a clstart on Node1 with ’Manage Resource Groups’ set to ’Automatically’, then perform a resourcegroup move operation to move rg1 from Node1 to Node2
考题
An HACMP cluster has three nodes of unequal size. The largest node is Node ’A’. The primary application on Node ’A’ has two components. One component is memory intensive, the other is IO intensive. Nodes ’B’ and ’C’ are running web servers and databases that access information produced by applications on Node ’A’. The customer requires the most performance from the primary application and wants all nodes available for fallover processing. Which of the following is the best solution for meeting the customer requirements?() A、 Use nodes of equal size.B、 Create multiple resource groups and use loadlever.C、 Use dynamic node priority to manage resource groups.D、 Use an ordered list to manage resource group fallover.
考题
You want to create a WebLogic domain in a production environment. Which three actions should you perform?()A、Use a multinode WebLogic domain.B、Use a single-node WebLogic domain. C、Use clusters. D、Refrain from using clusters. E、Install WeLogic in production mode with CA signed certificates.
考题
Node Manager is a WebLogic Server () that enables you to start, shut down, and restart Administration Server and Managed Server from a remote location.A、 InstanceB、 UtilityC、 DestinationD、 Ouster
考题
Which two statements are true regarding the WebLogic domain?()A、A WebLogic domain can have more than one Administration server.B、A WebLogic domain has at least one WebLogic server.C、A WebLogic domain can have at the most one cluster. D、A WebLogic domain can cross multiple physical machines. E、Each WebLogic domain is associated with a different Node Manager.
考题
Identify three components of the WebLogic JMS architecture.()A、JMS ServerB、JMS ModuleC、Node ManagerD、Queue ManagerE、Persistent Store
考题
()is a collection of components managed by Fusion Middleware Control. It can contain Oracle WebLogic Server domains, one Administration Server, one or more Managed Servers, clusters, and the Oracle Fusion Middleware components that are installed, configured, and running in the domainA、 farmB、 beanC、 unitD、 node
考题
This is a special WebLogic Server instance included by the WebLogic Server Domains. It represents a central point from which you configure and manage all resource domain. ()A、 Managed ServerB、 Web ServerC、 Administration ServerD、 Node Server
考题
单选题Node Manager is a WebLogic Server () that enables you to start, shut down, and restart Administration Server and Managed Server from a remote location.A
InstanceB
UtilityC
DestinationD
Ouster
考题
单选题Company.com has a three-node cluster (Node ’A’, Node ’B’, and Node ’C’) with three resource Groups (rg1, rg2, and rg3). Node ’A’ has twice as many CPUs and twice as much memory as the two test add development Nodes ’B’ and ’C’. During normal production processing, all resource groups are active on Node ’A’. What is most efficient way to configure the cluster to manage the workload?()A
Use thee cascading resource groups where ’rg1’ and ’rg2’ fallover to Node ’B’ and ’rg3’ falls over to Node ’C’B
Use Dynamic Node Priority resource groups with a priority chain consisting of Node ’A’ then Node ’B’ then Node ’C’C
Use three rotating resource groups with ’rg1’ and ’rg2’ falling over to node ’B’ and ’rg3’ falling over to Node ’C’D
Upgrade Nodes ’B’ and ’C’ to be equal to Node ’A in CPU and memory resources to enable the cluster to synchronize three resource groups
考题
单选题Which option must you choose to configure Node Manager on a machine (server or zone)?()A
Configure one Node Manager per domain (for example, if there are two domains on one machine, then you will need to configure two Node Managers).B
Configure one Node Manager per machine with any number of WebLogic instances running on it.C
Configure one Node Manager per machine for all WebLogic, OHS, and OEM running on the same machine.D
Configure one Node Manager for every WebLogic instance.E
Configure two or more Node Managers for every WebLogic instance.
考题
多选题Which four actions can you perform using the WebLogic Admin Console?()AStop and start Managed Servers using the Node Manager.BStop and start Coherence Servers using the Node Manager.CCreate a WebLogic Domain Template.DCreate and target JDBC connection pools.ECreate and target WebLogic Diagnostic Framework Diagnostic Modules.FChange Java command-line parameters at run time.
考题
单选题WebLogic Node Manager can be used to manage the life cycle of WebLogic servers. WebLogic Node Manager is installed and started ().A
Per MachineB
Per DomainC
Per Managed ServerD
Per Admin Server
考题
多选题You want to configure WebLogic so that Managed Servers are restarted when they are in a FAILED state. Which three steps are necessary to accomplish this?()AConfigure Node Manager on the machines where WebLogic Managed Servers need to be started/restarted.BEnable Auto Restart in the Node Manager Configuration.CEnable Auto Kill if Failed in the Node Manager Configuration.DEnable Auto Kill if Failed for the Managed Server in question.EEnable Auto Restart for the Managed Server in question.
考题
多选题Identify the three processes that customers can choose for patching WebLogic Server.()ADownload patches from My Oracle Support and manage them using Smart Update.BUse Enterprise Manager to download patches from My Oracle Support and apply patches to WebLogic.CDownload patches from My Oracle Support and manually modify the classpath of the application server (though it is not recommended).DDownload patches from My Oracle Support and apply them using the WebLogic Admin Console.EUse the Admin Console to connect to My Oracle Support and download patches and then target them to the domain.
考题
单选题()is a collection of components managed by Fusion Middleware Control. It can contain Oracle WebLogic Server domains, one Administration Server, one or more Managed Servers, clusters, and the Oracle Fusion Middleware components that are installed, configured, and running in the domainA
farmB
beanC
unitD
node
考题
多选题You want to create a WebLogic domain in a production environment. Which three actions should you perform?()AUse a multinode WebLogic domain.BUse a single-node WebLogic domain.CUse clusters.DRefrain from using clusters.EInstall WeLogic in production mode with CA signed certificates.
考题
单选题This is a special WebLogic Server instance included by the WebLogic Server Domains. It represents a central point from which you configure and manage all resource domain. ()A
Managed ServerB
Web ServerC
Administration ServerD
Node Server
考题
单选题You installed WebLogic, SOA Suite, and Oracle Service Bus on a machine and want to use the WebLogic Node Manger to start servers for each product. Which statement is true?()A
You need to install a separate node manager for each Middleware Home that has a unique major and minor WebLogic Version Number.B
You need to install and configure only one instance of Node Manager for all products, regardless of the WebLogic version number.C
You need to install and configure a separate Node Manager for each domain of each product you want to run on the machine.D
You need to install one Node Manager but use separate SSL certificates for each product when searching the network communication to the machine
考题
多选题Which two statements are true regarding the WebLogic domain?()AA WebLogic domain can have more than one Administration server.BA WebLogic domain has at least one WebLogic server.CA WebLogic domain can have at the most one cluster.DA WebLogic domain can cross multiple physical machines.EEach WebLogic domain is associated with a different Node Manager.
考题
多选题Which action cannot be done in a scripted, automated fashion using WLST?()Acollecting run-time metrics and sending an email if user-defined thresholds are exceededBconfiguring Clusters and Managed ServersCstarting Managed Servers using the Node ManagerDinstalling WebLogic binaries on a remote machine using Node ManagerEconfiguring a Managed Server on a remote machine where the Node Manager is installed but no other Managed Servers from the domain exist
考题
单选题A highly available WebLogic cluster in UNIX is configured for automatic server migration. Node Managed is configured on both machines to start managed servers. How should you simulate a managed server failure to test whether automatic server migration is working?()A
Shut down the managed server from the WebLogic console.B
Shut down the managed server using the WLST command through Node Manager.C
Run kill -9 once to kill the managed server process.D
Run kill -9 to kill the managed server process, and run kill -9 one more time if the managed server is restarting.
热门标签
最新试卷